L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE -M1~ 3P+PE 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 1 3 5 -KKM2 2 4 6 M ~ 3P+PE -M2~ 3P+PE 12 13 14 -KM1 A2 A1.

Slides:



Advertisements
Similar presentations
Instruction: Use mouses left button. Use mouses left button. If mouse buttons dont work, use arrow keys of keyboard for slide show. If mouse buttons dont.
Advertisements

Instruction: Use mouses left button. Use mouses left button. If mouse buttons dont work, use arrow keys of keyboard for slide show. If mouse buttons dont.
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Performing Financial What-If Analyses You have a.
Fig. 4-1, p Fig. 4-2, p. 109 Fig. 4-3, p. 110.
Dario B. Crosetto 05/16/01 4 sec2 sec 4 sec2 sec 0 sec 1s 4 sec2 sec4 sec2 sec 1s Input every 6 seconds Output every 6 seconds Station (1d)Station (2d)Station.
Module 3 Practical Tasks
Pneumatics Pneumatik By Clifford Mayhew St Helens College
PROD.NAMEÇA 601 PNEUMATIC DRAWN BYA.DEMİREZEN DATE10/10/2003 CHECHEDADNAN AKAR NOTCH CYLINDER BOTTOM SCRAPE TOP SCRAPE CENTER CYLINDERCLAMP Y2Y1 LUBRICATOR.
Connecting to industry. Outside Air Products It begins with the same air we breathe, being drawn into an air compressor, and being compacted into a.
PROD.NAME KD 352 ELECTRICAL (1) DRAWN BY ALİ DEMİREZEN DATE 10/04/2003
P.464. Table 13-1, p.465 Fig. 13-1, p.466 Fig. 13-2, p.467.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Fig. 11-1, p p. 360 Fig. 11-2, p. 361 Fig. 11-3, p. 361.
Table 6-1, p Fig. 6-1, p. 162 p. 163 Fig. 6-2, p. 164.
P Fig. 6-1, p. 193 Fig. 6-2, p. 193 Fig. 6-3, p. 195.
1 times table 2 times table 3 times table 4 times table 5 times table
Logic Operations in Electro-Pneumatics
Kombis 8003 Index block Overview Principle Function
NGfL CYMRU GCaD JOINERY WORKSHOP WOOD OCCUPATION SKILLS JOINERY WORKSHOP: MACHINE TOOLS AND PORTABLE POWER TOOLS.
MR. KERINS Logic Gates- Electrical Engineering. LOGIC GATES Logic gates are primarily implemented using diodes or transistors acting as electronic switches,
Unit: Energy and Control- Electricity.  Think about a busy intersection. How do traffic signals control all that traffic? Advanced greens; green arrows;
Math on the Mind Model y = –2x + 4 with a table of values and a graph.
Y13 LOW PRESSURE VALVE -Y1 -Y2 -Y3 -Y4 -Y5-Y6 CLAMPING PRESSURE REGULATOR WELDING PRESSURE REGULATOR FIXED HEAD BACK CLAMP FIXED HEAD FRONT.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Excel Final Project – Day 3 Notes You should have 4 reports done by the end of today… Grades are up to date… The only remaining grade for the quarter is.
Working “Control any electrical device with your T.V remote(any brand)” wizardelectronics.weebly.com.
Lab 3 – Free-Body Diagrams Force plate F(t) Objectives: Measure force for different situations Practice free-body diagrams.
Electrical circuits By Caroline.
Periodic Table Vocabulary. Periodic Table This chart presents and organizes information about all the elements.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Tables Learning Support
Tables 1 to 8 FM Run around!.
40 Minutes Left.
Standard Grade Technological Studies Pneumatic components: The T-piece.
Mrs. Laurence’s Science Journal You may use this journal to make sure yours is up to date or in case you need to study and left your journal at school.
Tech 3104 Electronic Symbols Submitted to: Mr. Bouzanne Submitted by: Alexis Boland.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Fitting Lines to Data Points: Modeling Linear Functions Chapter 2 Lesson 2.
Fluid Power Control.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
H-Bridge Motor Driver.
Logic Gates Practical Objective: to develop an understanding of logic circuits and truth tables.
Multiplication table. x
Lab02 :Logic Gate Fundamentals:
Date of download: 11/12/2017 Copyright © ASME. All rights reserved.
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Times Tables.
Pneumatics Pneumatik By Clifford Mayhew St Helens College.
Chapter 2 Push button and Potentiometer
Device Photographs.
Chapter 5 Servomotor.
NRS Table 4: Q&A Event Name Date.
ચાલો માટી વિશે જાણીએ All About Soil.
How tall is the table?.
Велики откриватели и пътешественици
Warm Up: Solve the Equation 4x2 + 8x – 32 = 0.
HYDRAULICS & PNEUMATICS
Making) LED table lamp.
Rotating Pills CSE 115 Fall 2006 Dr. Mario – Lab 10.
Slope  4 Ways: Graph Formula Ordered Pairs Table.
Natural Sciences and Technology Grade 6
÷ 5 = 29 How many 5s are there in 1? Great!
÷ 2 = 24 How many 2s are there in 4?
Licensed Electrical & Mechanical Engineer
The LINCS Table NAME:_________________ Date: _________________
3 times tables.
6 times tables.
Thing / Person:____________________ Dates:_________________
Mechatronik Training systems for the basic and
Presentation transcript:

L1 L2 L3 PE KKM M ~ 3P+PE -M1~ 3P+PE SO MAIN SWITCH KKM M ~ 3P+PE -M2~ 3P+PE KM1 A2 A1 15 -KM2 A2 A1 16 -S1 -S BUTTON PROD.NAMEFR 224 ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

L1 L2 L3 PE KKM M ~ 3P+PE M~ 3P SO MAIN SWITCH 4 5 A2 A1 12 -S1 6 START BUTTON -KM1 5 6 SOIL PROD.NAMEFR 220 / 221 (400V) ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

L N PE KKM M ~ 3P+PE M~ 1P+N SO MAIN SWITCH 3 3 A1 A2 -S1 4 START BUTTON -KM1 4 5 TABLE BROWNBROWN BLUEBLUE YELLOWYELLOW -C1 CAPASITOR 9 5 PROD.NAMEFR 220 / 221 (230V) ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

PROD.NAMEFR 221 S PNEUMATIC DRAWN BYA.DEMİREZEN DATE27/10/2003 CHECHEDADNAN AKAR

PROD.NAMEFR 221 PNEUMATIC DRAWN BYA.DEMİREZEN DATE30/04/2002 CHECHEDADNAN AKAR LEFT CLAMPRIGHT CLAMP LUBRICATOR Y1

PROD.NAMEFR 224 PNEUMATIC DRAWN BYA.DEMİREZEN DATE30/04/2002 CHECHEDADNAN AKAR LEFT CLAMPRIGHT CLAMP LUBRICATOR Y1