© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter 16 16.1 Project Planning & Control.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Work Breakdown Structures
Estimating, scheduling and budgeting
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Chapter 10: Project Schedule Planning
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project planning and control
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 Operations Management Lesson 5 Project Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Importance of Project Schedules
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Chapter 3 Managing the Information Systems Project
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
FUNDAMENTALS OF PROJECT MANAGEMENT. Need of Project Management Projects worth billions of rupees undertaken every year. Effective management has bearing.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Appendix A Project Management: Process, Techniques, and Tools.
Project Management Project Planning Estimating Scheduling.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Planning Techniques U08784Software Project Management Rosemary Phillimore.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Business Department Session 6 Exam Question –Draw Network diagram –Identify Critical path –Sketch Gantt Chart –‘Crash’ the project Reduce the project completion.
PROJECT MANAGEMENT Approaches
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 16 Project planning and.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
PROJECT MANAGEMENT.
Procuring Professional Services
Business Decision Making
Project Planning and Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project planning & control
Activity Planning.
Chapter 3 Managing the Information Systems Project
CHAPTER 6 PROJECT TIME MANAGEMENT
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
CHAPTER 6 PROJECT TIME MANAGEMENT
Chapter 3 Managing the Information Systems Project
Presentation transcript:

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Project Planning & Control

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Chapter Coverage What is a project? The project planning and control process Network planning – Critical Path Method (CPM)

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Projects: A project is a set of activities with a define start point and a define end state, which pursues a defined goal and uses a define set of resources.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Understanding the project environment Project definition Project planning Technical execution Project control Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Changes Corrective action Stages in project management

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Stage 1: Understanding project environment The project environment comprises the factors which may affect the project during its life. See slide 16.6

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Geo-social environment Geography National culture Econo-political environment Economy Government Business environment Customers Competitors Suppliers/sub-contractors Internal environment Company strategy Resources Other projects The Project Examples of factors that may affect the project environment

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Stage 2: Project definition Three different elements define a project: Its objective: the end state that project management is trying to achieve Its scope: the exact range of the responsibilities taken on by the project management. Its strategy: how project management is going to meet its objective.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Project objectives The hierarchy of objectives: At the top of the hierarchy is the overall objective or goal of the project, lower levels of the hierarchy are the objectives of each part of the project (big projects consists of many parts). Objectives of each part must be related to its overall objective.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Objectives must be clear: Good objectives are those which are clear, measurable and, preferably, quantifiable. One method of clarifying objectives is to break down project objectives into three categories: –Purpose: to prevent production from failing to meet output as forecast. –End result: a report which identifies the causes of lost production, and which recommends how the target output can be met. –Success criteria: the report should be completed by 30 June. The recommendations should enable output to reach at east 70 tonnes per year. Cost of the recommendations should not exceed RM200,000.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Quality TimeCost New aircraft project Fixed grant research project Music festival The three project performance objectives

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Project scope -Identifies the work content and the outcomes. -Boundary setting exercise – divides work content for each part of the project. -Important for managing contractors – commercial and legal aspect of the scope of supply. -Can change during the course of the project.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Project strategy -Defines in general how the organization is going to achieve its project objectives and meet the related measure of performance. -Two ways: 1)Define phases (time based sections) of the project. 2)Set milestones at which specific reviews of time, cost and quality are made.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Stage 3: Project planning Fulfills four distinct purpose, it determines: 1.The cost and duration of the project. 2.The level of resources needed. 3.Helps to allocate work and monitor progress. 4.Helps to assess the impact of changes to the project. There are five steps…

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Identify the activities in the project Estimate the times and resources for activities Identify the relationships and dependencies between the activities Identify time and resource schedule constraints Fix the schedule for time and resources Adjust as necessary Stages in the project planning process 12345

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Serve breakfast in bed 3. Fetch juice 4. Fetch glass 6. Boil egg10. Fetch egg cup 12. Toast bread 15. Fetch butter 17. Fetch tray, plates and cutlery 16. Arrange tray 11. Butter the toast 5. Place boiled egg in egg cup 2. Pour juice in glass 7. Fetch egg 8. Bring water to boil 14. Fetch bread 1. Identify activities: Work breakdown structure 13. Slice bread 9. Fill pan with water

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Estimate times and resources Table 16.1 Time and resources estimates for a breakfast-in-bed” project No ActivityEffort (person)Duration (secs) 1 Serve breakfast in bed Pour juice in glass15 3 Fetch juice110 4 Fetch glass110 5 Place boiled egg in egg cup13 6 Boil egg Fetch egg110 8 Bring water to boil Fill pan with water18 10 Fetch egg cup Butter the toast Toast bread Slice bread Fetch bread Fetch butter110

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Typical subjective probability distribution for an activity time estimate Activity duration35136 Optimistic time Most likely time Expected time Pessimistic time Probability Accuracy of estimates comes with experience!

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter All activities will have some relationship with one another. Dependent or series relationship or Slice breadToast breadButter toast Fill pan with waterBring water to boilBoil egg Parallel relationship 3. Identify relationship and dependencies &

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Resource constrained – only the available resource level are used in resource scheduling and are never exceeded hence, project completion might slip. Time constrained – priority is to complete the project within a given time. 4. Identify schedule constraints

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter “Making breakfast” - Do activities at earliest time Orange Bread Water Tray Toast Boil waterBoil egg Bed room Staff required Butter Time (mins) Activities requiring operator time

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter “Making breakfast” – Minimizing staff requirements Orange Bread Water Tray Toast Boil waterBoil egg Bed room Staff required Butter Time (mins)

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter “Making breakfast” – Maximizing toast quality Staff required Orange Water Tray Boil waterBoil egg Bed room BreadToast Butter Time (mins) 5. Fix the schedule

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Stage 5: Project control 1.Project monitoring: current expenditure to date, amount of overtime authorized, inspection failure, progress of activities etc. 2.Assessing project performance: Compare planned and actual expenditure 3.Intervene to change the project: when the project is out of control in the sense of cost, quality levels or time, intervention is required.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Network planning 1.Use of Gantt chart is the simplest technique that supports project planning and control. 2.More elaborate and detailed techniques are collectively called network analysis. 3.We will consider a network analysis method called Critical Path Method (CPM)

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Critical Path Method 1.Represents the project activities diagrammatically. 2.Project activities are represented by arrows (See 16.26). 3.At the tail (start) and head (finish) of each activity is a circle which represents and event (See 16.27). Rules for drawing a network diagram: 1.An event cannot be reached until all activities leading to it are complete - (16.27 – event 5 is not reached until c and e are completed). 2.No activity can start until its tail event is reached - (16.27 – activity f cannot start until event 5 is reached). 3.No two activities can have the same heat and tail events (16.28 – activities x and y cannot be drawn as first shown, they must be drawn using a dummy activity (no duration and shown as a dotted line)

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Prepare bedroom Paint bedroom Prepare kitchen Paint kitchen Remove furnitureReplace furniture a Remove furnitureNone1 b Prepare bedrooma2 c Paint bedroomb3 d Prepare kitchena1 e Paint kitchend2 f Replace furniturec, e1 Activity Immediate predecessors Activity duration (in days) Activities and network for a simple project

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Network diagram for simple decorating project a 1 b 2 d 1 c 3 e 2 f a 1 1 Activity reference Activity duration Event number An Event Earliest Event Time (EET) Latest Event Time (LET) EET – the very earliest the event could possibly occur if all preceding activities are completed as early as possible. LET – the latest time that the event could possibly take place without delaying the whole project

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter x y x y Activity on arrow – Using “dummy” activities

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Critical Path –Network diagrams have more that one sequence of activities which will lead from the start to the end of the project – these sequence are called paths. –Each path has a total duration which is the sum of all its activities. –The path which has the longest sequence of activities is called the critical path. –It is called the critical path because any delay in and of the activities on this path will delay the whole project.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Network analysis for simple decorating project a 1 b 2 d 1 c 3 e 2 f With earliest and latest event times Chapter 16, Page 575

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Worked Example The chief surveyor of a firm that moves earth in preparation for the construction of roads has identified the activities and their durations for each stage of an operation to prepare a difficult stretch of motorway (see table below). The surveyor needs to know how long the project will take and which are the critical activities.

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Road Construction Activities ActivityDurationPreceding activities A5- B10- C1- D8B E B F9B G3A, D H7 I4F J3F K5C, J L8H, E, I, K M4C, J

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter Network Diagram For Motorway Project A 5 B 10 C 1 D 8 E F 9 G 3 H 7 I 4 J 3 KM 5 4 L 8

© Nigel Slack, Stuart Chambers & Robert Johnston, 2004 Operations Management, 4E: Chapter The End