1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept. 2013 WBS: Lowest level OBS: Lowest level.

Slides:



Advertisements
Similar presentations
3 Project Management PowerPoint presentation to accompany
Advertisements

WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management CPM/PERT Professor Ahmadi.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Operations Management Session 27: Project Management.
Developing a Project Plan
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Tutorial 2 Project Management Activity Charts (PERT Charts)
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management Techniques.
BA 333 Operations Management
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
3 Project Management PowerPoint presentation to accompany
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Network Planning Methods Example CPM : Saint Paul’s Hospital Network Planning Methods.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Lean Project Management
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Time Planning and Control Activity on Node Network (AON)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations Management Project Management Chapter 3.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Project Management for Business
Project Scheduling Chapter 14.
Projects: Critical Paths
Time Planning and Control Activity on Node Network (AON)
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
Project Planning and Budgeting
Developing a Project Plan
PLANNING ENGINEERING AND PROJECT MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
Time Planning and Control Activity on Node Network (AON)
General Foundry Example of PERT/CPM
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Scheduling.
Presentation transcript:

1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level

Topics Covered Network Representation Network Development Dummy Activity Network Scheduling Practice Problems CPM Network Calculations

Even though a linked Gantt Chart can include precedence relationships between activities, it is an unsuitable tool if these relationships grow beyond a certain complexity. In such situations, the scheduling should be carried out by a network technique. However, the presentation of the schedule to the project participants may still be done in a Gantt Chart format. Network Representation

Arrows and nodes are used for construction of Network. There are two types of network representations: 1. Activity on arrow (AOA) 2. Activity on node (AON) Arrow Node

1. Activity on arrow (AOA) Activity Event In AOA Arrow shows activity and precedence relationships 2. Activity on node (AON) Node In AON Arrow shows precedence relationships only Activity NB! Okto_arrowed-line & node

Following information is required in order to develop a network:  A list of all activities  A list of all precedence relationships  An estimated duration of each activity (required for network scheduling) Network Development For structure of network

Problem 1 A B C D Activity on arrow (AOA) Act- ivity Immediate Predecessor A- B- CA DB

An activity inserted into the network to maintain the logic of the network. A dummy takes zero time and do not consume any resources. Dummy Activity

231 A C B D A precedes B and C, B and C precede D 4 Dummy Activity Incorrect Display A C B D 3 5 Add a Dummy as shown by dash line below. Correct Display

The purpose of network scheduling is o To determine when the project will finish o To determine which activities directly influence the project duration Two techniques of network scheduling are: 1. Critical path method (CPM) 2. Program evaluation and review technique (PERT) Network S cheduling

PERT and CPM Developed in 1950’s  CPM by DuPont Cooperation for chemical plants (1957)  PERT by Booz Allen Hamilton with the U.S. Navy, for Polaris missile (1958) Consider precedence relationships and interdependencies Each uses a different estimate of activity times

 Is the project on schedule, ahead of schedule, or behind schedule?  Is the project over or under cost budget?  Are there enough resources available to finish the project on time?  If the project must be finished in less than the scheduled amount of time, what is the way to accomplish this at least cost? Questions which may be addressed by PERT & CPM

Six Common Steps to PERT & CPM 1. Define the project and prepare the work breakdown structure. 2. Develop relationships among the activities. (Decide which activities must precede and which must follow others.) 3. Draw the network connecting all of the activities 4. Assign time (and/or cost) estimates to each activity 5. Compute the longest time path through the network. This is called the critical path 6. Use the network to help plan, schedule, monitor, and control the project

CPM calculates a network in several steps: For each event: o Earliest possible time: The earliest possible time the event can occur o Latest possible time: The latest possible time the event can occur CPM Network Calculations

For each activity: o Early start (ES): The earliest possible start time for the activity o Early finish (EF): The earliest possible finish time for the activity

For each activity: o Late start (LS): The latest possible start time for the activity so as not to delay the completion time of the entire project. o Late finish (LF): The latest possible finish time for the activity so as not to delay the completion time of the entire project. Continue to next lecture

17

Topics Covered CPM Calculations for AOA and AON Networks Slack Time / Float Critical Path, Critical Activity Practice Problems

CPM Calculations for AON Network Provides activity information  Early start (ES) & late start (LS)  Early finish (EF) & late finish (LF)  Slack (S) / Float (FL) Identifies critical path

Forward and Backward Pass Forward pass is a technique to move forward through network diagram. Backward pass is its opposite. Early Start (ES) and Early Finish (EF) use the forward pass technique. Late Start (LS) and Late Finish (LF) use the backward pass technique. Note: If the float of the activity is zero, the two starts (ES and LS) and the two finish (EF and LF) are the same. Hence, If float of activity is zero, ES = LS and EF = LF.

Early Start and Early Finish Steps Begin at starting event and work forward ES = 0 for starting activities  ES is earliest start EF = ES + Activity time  EF is earliest finish ES = Maximum EF of all predecessors for non- starting activities

Late Start and Late Finish Steps Begin at ending event and work backward LF = Maximum EF for ending activities  LF is latest finish; EF is earliest finish LS = LF - Activity time  LS is latest start LF = Minimum LS of all successors for non-ending activities

Gantt Chart for General Hospital Early Start and Finish ES EF A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test LS LF

is t Slack Time is the amount of time an activity may be delayed without affecting the project deadline. This is also referred as float. An activity having zero slack time is called critical activity. The concept of critical activities is that it draws the attention of the project manager to the activities that needs the closest monitoring. Any delay of a critical activity leads to an equivalent delay of the total project. A path having longest duration (completion time) in the network is called critical path. Slack Time/Float