Project Scheduling: Gantt/Pert Charts

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Work Breakdown Structures
Project Management Information Systems and Management.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Developing a Project Plan
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach 4/e
Project Management: A Managerial Approach
Project Management A Managerial Approach
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Operations and Supply Chain Management, 8th Edition
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Time Management
Importance of Project Schedules
Project Management Techniques.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Project Time Management
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
Project Scheduling: PERT/CPM
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
WEEK 3 Project Planning.
PROJECT MANAGEMENT.
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management: A Managerial Approach
Slides Prepared by JOHN LOUCKS
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Importance of Project Schedules
Scheduling.
Presentation transcript:

Project Scheduling: Gantt/Pert Charts 1

What is a Project? A project is a (temporary) sequence of unique, complex, and connected activities that have one goal or purpose and that must be completed by a specific time within budget, and according to specification.

What is a Project? A project is a (temporary) sequence of unique, complex, and connected activities that have one goal or purpose and that must be completed by a specific time within budget, and according to specification.

Scheduling A schedule is the conversion of a project action plan into an operating timetable It serves as the basis for monitoring and controlling project activity work changes daily, so this is essential With the plan and budget, it is the major tool for the management of projects most scheduling is at the WBS level (tasks), not the work package level only the most critical work packages may be shown on schedule

Scheduling In a project environment, the scheduling function is more important than it would be in an ongoing operation Projects lack the continuity of day-to-day operations and often present much more complex problems of coordination

Scheduling The basic approach of all scheduling techniques is to form a network of activity and event relationships This network graphically portrays the relations between a project’s tasks Tasks that must precede or follow other tasks are then clearly identified, in time as well as function

Network Scheduling Advantages Networks are a powerful tool for planning and controlling a project and have the following benefits: consistent framework for planning, scheduling, monitoring, and controlling the project illustrates the interdependence of all tasks, work packages, and work elements denotes the times when specific individuals must be available for work on a given task

Network Scheduling Advantages aids in ensuring that the proper communications take place between departments and functions determines an expected project completion date identifies so-called critical activities that, if delayed, will delay the project completion time identifies activities with slack that can be delayed for specific periods without penalty

Network Scheduling Advantages determines the dates on which tasks may (or must) be started if the project is to stay on schedule illustrates which tasks must be coordinated to avoid resource timing conflicts illustrates which tasks may (or must) run in parallel to achieve the predetermined project completion date relieves some interpersonal conflict by clearly showing task dependencies

Network Scheduling Techniques PERT was developed in 1958 for the Polaris missile/submarine project The Critical Path Method (CPM) was developed by DuPont during the same time period Initially, CPM and PERT were two different approaches CPM used deterministic time estimates and allowed project crunching PERT used probabilistic time estimates Microsoft Project (and others) have blended CPM and PERT into one approach

Terminology Activity - A specific task or set of tasks that are required by the project, use up resources, and take time to complete Event - The result of completing one or more activities. An identifiable end state occurring at a particular time. Events use no resources. Network - The combination of all activities and events that define a project Drawn left-to-right Connections represent predecessors

Terminology Continued Path - A series of connected activities Critical - An activity, event, or path which, if delayed, will delay the completion of the project Critical Path - The path through the project where, if any activity is delayed, the project is delayed There is always a critical path There can be more than one critical path

Terminology Continued Sequential Activities - One activity must be completed before the next one can begin Parallel Activities - The activities can take place at the same time Immediate Predecessor – an activity that must be completed before a particular activity can begin An activity can be in any of these conditions: It may have a successor(s) but no predecessor(s) - starts a network It may have a predecessor(s) but no successor(s) - ends a network It may have both predecessor(s) and successor(s) - in the middle of a network

Terminology Continued Activity on Arrow (AOA) - Arrows represent activities while nodes stand for events Activity on Node (AON) - Nodes stand for events and arrows show precedence

AON and AOA Format

Constructing an AON Diagram Begin with the START activity Add activities without predecessors There will always be one There may be more than one 3. Add activities that have existing activities as predecessors 4. Repeat step 3 until no more activities

Gantt Charts Developed by Henry L. Gantt in 1917 Shows planned and actual progress Easy-to-read method to show current status

Gantt Charts: Advantages and Disadvantages Easily understood Provide a picture of the current state of a project Difficult to follow with complex projects

Simple Schedule – Gantt Chart © 2006 John Wiley and Sons, Inc.

Class Individual Exercise

Class Individual Exercise - 2. Create a new Project Create the 12 Tasks from the previous slide enter their names and durations enter the task dependencies Now enter resources as follows: Jason Jeff, Emily Emily Jeff Ariel Pat Marsha Marc Save your work!

The Work Breakdown Structure The Work Breakdown Structure (WBS) can take a variety of forms that serve a variety of purposes The total program can be described as a summation of subdivided elements. Planning can be performed. Costs and budgets can be established. Time, cost, and performance can be tracked. Schedules and status-reporting procedures can be established. (=> Gantt chart) Responsibility for each element can be assigned.

The Work Breakdown Structure - 2 The WBS often appears as an outline with Level 1 tasks on the left and successive levels appropriately indented The WBS may picture a project subdivided into hierarchical units of tasks, subtasks, work packages, etc.

Most common type: Six-Level Indented Structure The Work Breakdown Structure - 3 LEVEL DESCRIPTION 1 Total Program Usually specified by the client and managed the project manager. 2 Project(s) 3 Task(s) 4 Subtask(s) Usually specified by the functional manager(s). 5 Work Package(s) 6 Level of Effort Most common type: Six-Level Indented Structure

Gozinto Chart for a Toy Bus

A WBS with more Breadth

The Work Breakdown Structure - 4 Summary: The WBS is an important document and can be tailored for use in a number of different ways It may illustrate how each piece contributes to the project in terms of performance, responsibility, schedule, and budget It may list the vendors or subcontractors associated with specific tasks It may serve as the basis for cost or schedule estimates It may be used to document that all parties have signed off on their various commitments to the project

The Work Breakdown Structure Steps for designing and using the WBS: Using the action plan, list the task breakdown in successively finer levels of detail. Continue until all meaningful tasks or work packages have been identified. For each such work package, identify the data relevant to the WBS: personnel and organizations responsible for each task. All work package information should be reviewed with the individuals or organizations who have responsibility for doing or supporting the work to verify the accuracy of the WBS

WBS Linear Responsibility Chart

Simplified Linear Responsibility Chart

In-class Group Exercise Create a WBS for your project

The AON Network

Critical Path and Time Notation: [Task name, expected time, variance]

Critical Path Calculation To find the critical path: start with set of children of the Start node for each node: use the earliest start time (the greatest “earliest finish time of all this node’s predecessors), add in the duration to calculate the earliest finish time repeat step 2 for the children of each node in the set

Slack Calculation To find the slack: start with End node and note its LS time for each predecessor node: set the LF time to the lowest LS time of the successor(s) and subtract the duration to get the EF time repeat step 2 for the children of each node in the set

Critical Path, Time, and Slack

Slack Values

Resulting Gantt Chart

Resulting AON Network

Calculating Activity Times Notes: a is the optimistic estimate b is the pessimistic estimate m is an estimate of the mode TE is a calculation of the mean σ2 is the variance; a representation of the uncertainty σ is the standard deviation

The Results

Uncertainty of Project Completion Time Assume activities are statistically independent is this reasonable? The variance of a set of activities is the sum of the individual variances We are most interested in variances along the critical path!

Fun With Statistics! What is the probability of completing a project on time, given a measure of variance and a critical path? We can answer that by calculating Z (# of standard deviations) as follows: Z = (D - ) / where D = desired project completion time = critical time of the project = variance of the critical path

Example Continued If we want to complete the project in 50 days then D = 50, μ = 43, = 33

Example - 2. The likelihood of completing the project in 50 days is 88.88% (see Table next slide) If we want 95% certainty of on-time completion: D = μ + σ * Z = 43 + 5.745 * 1.645 = 52.45 days For 99% certainty D = 43 + 5.745 * 2.33 = 56.39 days

Implications As D => μ, Z => 0 When Z = 0, probability of on-time completion is 50% Implication? If you want a high probability of being on time, you need some slack in the schedule! What about non-critical paths? Any path that has low slack and significant variance is a potential trouble spot.

Implications - 2. This is a great tool for you as a manager! Your boss will want estimates. What is your basis for making them? Guesses?

In Class Group Exercise Look at the WBS that you created for your project. From this, create a Gantt chart for your project. Determine the durations and dependencies for each of your project tasks. You only need to do “expected” duration for now.

In-class Group Exercise - 2 Calculate the total duration for your group project (and, hence, your critical path). Now, create a spreadsheet. For each project task, list: its optimistic, pessimistic, and expected durations you will have to do some educated guessing at this stage; that is normal

In-class Group Exercise - 3 Calculate TE, , and for each task Save this in your spreadsheet. Note for the critical path

In-class Group Exercise - 4. Determine D for your project. Calculate Z. What is your probability of completing at time D? Submit your Gantt chart, your spreadsheet and an explanation of the WBS and the assumptions behind your estimates before next class.