Project & Quality Management Day 3 Technology Project Management.

Slides:



Advertisements
Similar presentations
1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
Advertisements

PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Lecture Network Analysis
WBS: Lowest level OBS: Lowest level
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Work Breakdown Structures
Estimating, scheduling and budgeting
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 10: Project Schedule Planning
Tutorial 2 Project Management Activity Charts (PERT Charts)
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
COMP2001 HNC Project. Project Characteristics A project must have: clear objectives planning & control resources assurance of quality.
Roberta Russell & Bernard W. Taylor, III
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Chapter 6 Introduction to Microsoft Project
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
PROJECT PLANNING. PLANNING Planning is essential and software development is no exception. Achieving success in software development requires planning.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
ENGM91 ACTIVITY PLANNING Unit 2
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
© Pearson Education Limited 2004 OHT 8.1 Cadle and Yeates: Project Management for Information Systems, 4th edition Critical Path Method(CPM)
Network Analysis Terminology
Business Department Session 6 Exam Question –Draw Network diagram –Identify Critical path –Sketch Gantt Chart –‘Crash’ the project Reduce the project completion.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lecture 3 Part 1 Managing the Information Systems Project.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
A Brief intro to Project Management What can it do for you
PROJECT MANAGEMENT.
Critical Path Method(CPM)
Management should be based on effective and thorough planning
Project Scheduling Lecture # 1.
Analysing the AoA network
Analysing the AoA network
Activity on Node Approach to CPM Scheduling
Project Planning By Phaik San Liew.
Presentation transcript:

Project & Quality Management Day 3 Technology Project Management

Syllabus Core: PQM Three main topics Project Management Quality Management Reliability Management

Project Management Overview of project management, Project planning; →Work Breakdown Structure, →The Gantt Chart, →Network Diagram, →Critical Path Diagram, Project planning for Technology projects, Using Microsoft Project to generate charts. Structure of the Presentation

What is Project Management? A set of techniques used for managing projects Origins in industry - large projects Bridge Building New Product Development Road Building

What is a Project? “Any task within an organisation that does not fit neatly into ‘business-as-usual’” Port Tunnel Luas Development of New Engine Set up a Quality System in Company Technology Design & Make project.

What is a Project? Projects have the following characteristics: Each project is specific and unique. Each project has a specific deliverable item when complete. This deliverable is aimed at meeting a specific need or purpose. There is usually a specific due date for completion of the project. Design is not necessarily a central part of the project activity.

What is Managed? PM focuses on the management of resources and time in a systematic manner. The administration of the project The supervision of the project The organisation of the project

What is Managed? For the student it means: Analysing the objectives of the project, Defining the tasks needed to achieve these objectives, Controlling the execution of them.

Who manages the projeect? Large projects usually involve a project team. Project Manager Specialist

Projects have 3 objectives, Finish on time. Meet the specifications that satisfy the brief. Meet the budget. Students are the project managers of their own tasks! What do Project Managers do?

Importance of Planning Unexpected events may happen during the project and may cause delays. Breakdown of machinery, Problems with resources/supplies, Labour shortages, etc. Project planning can minimise the effect of these unexpected delays.

Project Planning What is a project plan? Can be as simple as a list of sequences for a small project Can be more complex with charts, tables, costings etc. for a larger project

Project Planning 1.Analyse the brief, 2.List the steps involved, 3.Draw up a Work Breakdown Structure (WBS). A WBS is a diagram that shows →Primary Tasks →Sub-Tasks

Example Draw up a Work Breakdown Structure for the erection of a garden shed. 1.The shed will come prefabricated but will need to be assembled. 2.A foundation will need to be prepared in advance.

List of Tasks No.Activity 1Order Shed 2 Buy Blocks, Sand & Cement 3Build Foundation 4Assemble Shed

WBS for Garden Shed Garden Shed Prepare Foundation Buy Blocks and Cement Place order for shed Assemble Shed when it arrives

The Gantt Chart – a Preview A Gantt Chart is a horizontal bar chart showing the times for each task

Looking at the Gantt Chart Delivery time for the shed is nine days, One day for buying materials, Two days for making the foundation, One day for assembly. Note: Making the foundation is timed so that it is ready just in time for the delivery of the shed Could have been completed at an earlier date if desired.

Exercises Redraw the Gantt chart so that the maximum amount of time is allowed for the curing of the foundation. Buy Blocks Build Foundation Assemble Day Order Shed from Supplier

Exercises Shown is a picture of a Christmas Tree Star 1.Draw a WBS for the Star 2.Draw a Gantt chart for manufacturing the Star

List of Tasks:Star No.ActivityTime 1Mark Out Star1 2Drill Holes1 3Cut Out & File3 4Solder Circuit2 5Assemble2 6Test1

WBS for Star Star Mark OutDrillCut Out & File Solder Circuit AssembleTest Circuit Structure Sub Task

Gantt Chart for Star Cut Out & File Drill Solder Circuit Day Mark Out Assemble Test

Network Diagrams For larger or more complex projects a network diagram is required. Network Diagrams show: 1.The relationships between the tasks, 2.The sequence in which each task is performed, 3.The interdependencies between the tasks.

Drawing up a Network Diagram Start with task list and draw up a WBS Decide on the order of tasks WBS Network Diagram Gantt Chart

Sample WBS A WBS needs to be analysed and redrawn frequently to arrive at the best production sequence. (Use ‘Post its’)

Network Table Task Predecessor A- B- CA DB EB FC,D GE The tasks and their predecessors can be drawn as a table

Part Complete Network Diagram Note that task C has A as a predecessor D and E have B as predecessors. A and B have no predecessors and are connected to the starting node.

Complete Network Diagram Task Predecessor A- B- CA DB EB FC,D GE Exercise: Complete the diagram using the remainder of the tasks

Network Diagram for Garden Shed Draw up a network diagram for the garden shed project described previously.

Some Definitions and Terms Terms used for network diagrams: Activity – A task or set of tasks required by the project. Network – Diagram of nodes representing activities connected by directional arrows that defines the project and shows the relations between all of the activities. Networks are usually drawn with a ‘Start’ node on the left and a ‘Finish’ node on the right. Path – A series of connected activities in the network Critical Path – the set of activities on a path from the project’s start event to its finish event that if delayed, will delay the completion date of the project. Critical Time – The time required to complete all activities on the critical path.

Adding Times to the Network Diagram Duration of each task can be added to network diagram From this, start and finish times can be found for each task Some tasks can be allowed to vary their start and finish times without affecting overall time taken

Example TaskPredecessorDuration A-5 (days) B-4 CA3 DA4 EA6 FB,C4 GD5 HD,E6 IF6 JG,H4 Consider the following project

Network with Tasks & Times

Adding Further Information We can add the following information to each node in the diagram: Earliest Start Time (EST) Earliest Finish Time (EFT) Latest Start Time (LST) Latest Finish Time (LFT)

Critical Path Diagram Critical path in orange See notes for a detailed explanation

Conclusions from Critical Path Diagram Critical path is path that requires the most time (A-E-H-J) Critical time is 21 days which is the earliest possible completion time Any delay on critical path will delay the project Some delay (within limits) can be tolerated on other tasks.

Critical Path Diagram for the Garden Shed Complete the critical path diagram for the garden shed State critical path and critical time

Solution CP: Order Shed – Assemble CT= 10 Days

Slack = LFT-EFT = LST-EST Calculating Activity Slack Slack or Float is the amount of time a non-critical task can be delayed Slack = Latest Finish Time – Earliest Finish Time or Latest Start Time – Earliest Start Time

Slack Times from Shed Example Both non-critical tasks have a slack of (9-3)=(7-1)=(7-1)=(6-0) = 6 days

The Gantt Chart Generated from network diagram Gives visual representation of activities and times Gantt charts can show: Timeline for each task Dependencies of tasks Critical path

Network Diagram Using the Network Diagram from previous example

Application of PM to Tech. Projects Now we will apply the techniques we have met to a hypothetical LC project. The procedure for project work is: List the tasks and sub-tasks involved Draw up a WBS Draw up a Network Table Draw up a Network Diagram Insert times and determine the Critical Path

Consider the following project brief Design and manufacture a personal alarm that will incorporate an electronic circuit as well as a suitable casing From analysing the brief: General plan on how to approach the project Identify the main tasks involved Derive a Work Breakdown Schedule Draw up a Network Diagram Add times and find the critical path, critical time and slack for the activities.

A possible WBS for the project Personal Alarm Research Circuit Design Circuit Order Components User SurveyDesign Casing Manufacture & Assemble Test Design Specification Order Materials Casing Circuit Sub Task

Network Table First draw up a list of tasks and preceding tasks TaskDescriptionDurationPredecessor AResearch Circuit14- BUser Survey7- CDevice Spec1B DCircuit Design3A EOrder Components10D FDesign Casing7C GOrder Materials7F HManufacture and assembly 7E,G ITest4H

Network Diagram 7 7

Critical Path Diagram CP = Circuit Research -Circuit Design-Order Components-Build-Test CT = 38 class periods

Gantt Chart for Project

Student Workbook List the tasks needed to complete the project

Example 2 List the tasks Estimate the times Draw up WBS and Gantt chart

Example – Contains circuit List the tasks & Estimate times Order tasks and optimise them Draw up WBS and Gantt chart Estimate project duration

Example:

Example