Project Management Concepts
Advertisements

Lecture Network Analysis
Precedence Diagramming
CP Chapter 4 Schedule Planning.
Work Breakdown Structures
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Eleanor Roosevelt High School
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Project Time Management
Importance of Project Schedules
Chapter 6: Project Time Management
1 Project Time Management. 2 Learning Objectives Understand the importance of project schedules and good project time management Define activities as.
Chapter 6: Project Time Management
Project Time Management
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Reviewing “The Building Blocks”
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Software Project Management Task Estimating and Scheduling
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Geog 469 GIS Workshop Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 3 Managing the Information Systems Project
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
PERT Gantt WBS.
Project Management Fundamentals - Planning Tools 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
1 Chapter 6: Project Time Management. 2 Learning Objectives Understand the importance of project schedules and good project time management Define activities.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Advanced Project Management - CPH Schedule Management Module 3 - Schedule Management

Schedule Terminology & Definitions Work Breakdown Structure (WBS) A deliverable oriented hierarchical decomposition of the work to be executed by the project team to accomplish the team mission and create the required deliverables. The WBS defines the project scope. Team Mission 25

Schedule Terminology & Definitions Deliverable Any unique and verifiable product or result that must be produced to complete a project. Usually the lowest level of the WBS. Team Mission 25

Schedule Terminology & Definitions Scheduled Activity (task) A component of work performed to create a deliverable. Team Mission Task 1 Task 2 (Etc.) WBS (Scope) Activity List (Schedule) 26

Schedule Terminology & Definitions Schedule Milestone A significant event in the project schedule, such as an event restraining future work or marking the completion of a major deliverable. A “measuring point”. Milestones have “0” (zero) duration and no resource assignments. 26

Schedule Terminology & Definitions Logical Relationships A dependency between scheduled activities, or between a scheduled activity and a schedule milestone. “Hard Logic” – Mandatory dependencies “Soft Logic” – Discretionary dependencies 26

Schedule Terminology & Definitions Logical Relationships “Finish to Start” (most common) Finish Start 26

Schedule Terminology & Definitions Logical Relationships “Finish to Finish” Finish Finish 26

Schedule Terminology & Definitions Logical Relationships “Start to Start” Start Start 27

Schedule Terminology & Definitions Logical Relationships “Start to Finish” (very rare, not available in WSDOT project management software) Start Finish 27

Schedule Terminology & Definitions Precedence (Network) Diagram A schedule diagramming technique in which schedule activities are represented by nodes and arrows shown the logical relationship between activities A D F B E C G 27

Schedule Terminology & Definitions Critical Path Longest duration path through the project network Activities on Critical Path are called “Critical Activities” Critical activities have no float or slack 27

Schedule Terminology & Definitions Critical Path A project can have more than one critical path Activities not on the Critical Path are called “Non Critical Activities” To shorten the project duration, a scheduler must modify the critical path activities or dependencies 28

Schedule Terminology & Definitions Float (Slack) “Total Float” – The amount of time a scheduled activity has that is can be delayed or extended without affecting the project end date or violating a schedule constraint. 28

Schedule Terminology & Definitions Float (Slack) “Free Float” – The amount of time a scheduled activity has that is can be delayed or extended without affecting the start of the next scheduled activity in the project network. 28

Schedule Terminology & Definitions Float (Slack) “Negative Float” – The amount of time that by which a critical activity (or milestone) misses a required date. 28

Schedule Terminology & Definitions Critical Path Method (CPM) A schedule network analysis technique used to determine the amount of schedule flexibility (float) on various network paths and to determine the minimum project duration. Forward Pass Backward Pass Late Start Late Finish Early Start Early Finish A D F B E 28 C G

Schedule Terminology & Definitions Gantt Chart (bar chart) A graphic display of schedule related information. A report from the project management program. 28

Schedule Tracking Schedule Tracking Actual Start – This is the date that work on the scheduled activity actually started. In project management software applications, this field is called “Actual Start” 29

Schedule Tracking Schedule Tracking Actual Finish – This is the date that the work on the scheduled activity actually finished. In project management software applications, this field is called “Actual Finish” 29

Elapsed Duration / Total Duration Schedule Tracking Schedule Tracking % Complete – This is a function of time. The formula for this value is Elapsed Duration / Total Duration With current project management software applications, this field must be greater than “0” before a Base Cost % Complete can be entered. 29

Schedule Tracking Schedule Tracking Base Cost % Complete – This is the percent of the deliverable that has been completed. There are several ways to estimate this based on the deliverable. A project performance baseline must be defined in the project management program before this value can be entered. 29

Base Cost % Complete Schedule Tracking Units Produced Method – This is the ratio of units produced to the total specified at completion. Units must be nearly identical. Example: Drilling 10 holes, 4 complete – 40% complete 29

Base Cost % Complete Schedule Tracking Interim Milestone (Agreement) Method – Establish the percent of the total that is to be represented by each milestone. Example: Deliverable: Traffic Signal Design Data Collected – 10% complete Preliminary Design – 60% complete Final Design – 90% complete PS&E – 100% complete 29

Base Cost % Complete Schedule Tracking 50/50 Method – 50% complete assumed when scheduled activity actual starts. 100% complete when scheduled activity is actually completed. 0/100 Method – 0% complete assumed when scheduled activity actual starts. 100% complete when scheduled activity is actually completed. 30

Base Cost % Complete Schedule Tracking Proportional Relationship Method – This is used when the completion of a measurable amount of one work package indicates the completion of another scheduled activity cannot be easily measured. Use for “hammock” tasks. Example: Project is 45% complete, Project Management hammock task is 45% complete 30

Schedule Recovery / Schedule Compression A technique used to shorten a project duration without reducing the project scope. There are two methods of schedule compression: Schedule Crashing Schedule fast tracking 30

Schedule Recovery / Schedule Compression Schedule crashing A compression technique in which scheduled activity durations are modified; working day definitions are modified; or resource requirements are modified. Typically will increase costs. Activities must be “resource dependant” 30

Schedule Recovery / Schedule Compression Schedule fast tracking A compression technique in which activities that would be normally done in sequence are performed in parallel. Fast tracking does not change resource requirements, but modifies the logical relationships. Typically, fast tracking will increase project risk. Cannot fast track “hard logic” 31

Schedule Recovery / Schedule Compression What-if Scenario Analysis Asking “what-if” for each situation and how it affects the project model. Outcomes can evaluate the effects to project objectives Also used for risk planning. 31

Module 3 exercise Schedule Management St-A-D-G-Fin: 44 days Task A 20 days Task B 16 days Task C 25 days Task D 10 days Task E Task F 7 days Task G 14 days Task H Task J 15 days F St-A-D-G-Fin: 44 days St-A-E-H-Fin: 50 days St-B-E-H-Fin: 46 days St-C-F-H-Fin: 42 days St-C-J-Fin: 40 days Critical Path 33