ME 414W/415W Project Management Project Management.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

PROJECT MANAGEMENT TOOLS AND TECHNIQUES
PRJ566 Project Planning and Management Lecture: Network Diagrams.
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Chapter 3 Managing the Information Systems Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Pert Charts Trisha Cummings. What Are Pert Charts? "PERT" developed by the United States Department of Defense as a management tool for complex military.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management. Maintenance and Reliability 14 Aug 2001.
Importance of Project Schedules
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Chapter 3 Managing the Information Systems Project
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
The Systems Analysis Toolkit Project Management Tools.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Project Planning Techniques U08784Software Project Management Rosemary Phillimore.
Project Management (專案管理)
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Managing the Information Systems Project Cont’d
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Business System Development
Systems Analysis and Design in a Changing World, 4th Edition
Project Planning & Scheduling
The Project Schedule and Budget
Hospital Establishment
Project Management.
Project Planning & Scheduling
Project Management and scheduling
Information Technology Project Management
PROJECT MANAGEMENT WITH CPM/PERT.
PERT - The Program Evaluation and Review Technique
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Presentation transcript:

ME 414W/415W Project Management Project Management

ME 414W/415W Project Management Project Management DILBERT’S BOSS

ME 414W/415W Project Management A Balancing Act u Deliverables u Cost u Quality

ME 414W/415W Project Management Learning How u ME 414W/415W u MBA u Industrial training programs

ME 414W/415W Project Management Planning u Technical u Time u Resources –Personnel –Equipment and Facilities –Budget

ME 414W/415W Project Management Benefits of Planning u Framework for communication –Clients and coworkers u Allocate resources –Personnel, equipment and facilities, budget u Benchmark to measure progress

ME 414W/415W Project Management Planning - Fundamentals u Establish Performance Standards at the BEGINNING u Use Decision Trees/Matrices, QFD, Taguchi Methods u Assure Performance Standards as Project Progresses u Verify Final Performance Against Standards u NO SUPRISES!

ME 414W/415W Project Management Time Planning u Identify TASKS u Estimate DURATION of Tasks u Establish PRECEDENCE of Tasks u Record MILESTONES (Performance and Dated) u Plan Start and Finish DATES for Tasks

ME 414W/415W Project Management Models u Gantt Charts - Bar Charts u CPM/PERT - Network u Control Charts - Planned versus Actual u s/gantt chart.pdf s/gantt chart.pdf

ME 414W/415W Project Management Example Gantt Chart

ME 414W/415W Project Management Gantt Chart u Tabulate Project Tasks –Title and ID Number for Each Task –Estimate Duration of Each Task –Estimate Resource Requirements for Each Task (May Need Dummy Tasks for Critical Resources) u Identify Prerequisite Tasks for Each Task u Layout Bar Chart with One Bar per Task based on Time u Add Dated Milestones

ME 414W/415W Project Management Example Gantt Chart

ME 414W/415W Project Management Gantt Chart - Pros and Cons u Strengths –See Status of Each Task at Any Point in Time –See Overlapping and Parallel Tasks u Weaknesses –Unable to Tell if the Entire Project is on Time for Highly Dependent Projects –Difficult to Show Critical Path

ME 414W/415W Project Management CPM/PERT u Critical Path Method u Program Evaluation and Review Technique

ME 414W/415W Project Management Example PERT Chart

ME 414W/415W Project Management CPM/PERT u Tabulate Project Tasks –Title and ID Number for Each Task –Estimate Duration for Each Task D=(O+4M+P)/6 v O = Optimistic, M = Most Likely, P = Pessimistic –Estimate Resource Requirements for Each Task (May Need Dummy Tasks for Critical Resources) u Identify Prerequisite Tasks for Each Task u Layout Flowchart of Tasks Based on Dependencies NOT Time u Indicate Performance Milestones on Flowchart

ME 414W/415W Project Management CPM/PERT - continued u Calculate Earliest Completion Time and Latest Completion Time –Beginning at start of project, ECT for task = ECT for preceding node + duration –Beginning at end of project, LCT for task = LCT for following node - duration u Calculate Slack Time for Each Task –Slack for Task= ECT - LCT u Determine Critical Path –Longest Time Path –Zero Slack

ME 414W/415W Project Management Example PERT Chart

ME 414W/415W Project Management CPM/PERT – Pros and Cons u Strengths –Shows Task Dependencies –Predicts Critical Path –Identifies Slack Time for Resources u Weaknesses –Assumes Subsequent Task Starts Immediately After Prerequisite Concludes –Difficult to Visualize Timing

ME 414W/415W Project Management Control Charts u Quality –Statistical Process Control u Schedule –Gantt, Milestone, PERT u Budget –Commitment –Performance –Cash Flow

ME 414W/415W Project Management Budget Control Chart

ME 414W/415W Project Management Resource Planning u LINK TO TIME PLANNING u Personnel –In-House –Vendors and Subcontractors –Circle-dot chart

ME 414W/415W Project Management Circle-dot Chart

ME 414W/415W Project Management Resource Planning - continued u Equipment and Facilities –May Need to Add Dummy Tasks for Critical Resources –Downtime for Expected Maintenance or Failure u Budget –Often Not Under Direct Control of Project Team –Contingency Funds –Variable Value of Money v Inflation v International Currency

ME 414W/415W Project Management Project Management is …

ME 414W/415W Project Management … a Balancing Act