Planning activities: activity schedule logical framework - part 1 The purpose of this exercise is to familiarize students with the successive stages of.

Slides:



Advertisements
Similar presentations
Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Advertisements

1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
CP Chapter 4 Schedule Planning.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Scheduling: Gantt/Pert Charts
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Responsibility Assignment Matrix (RAM) — Purpose  Ensure that all tasks are assigned to people  Show levels of involvement of people to work.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
Chapter 10: Project Schedule Planning
Tutorial 2 Project Management Activity Charts (PERT Charts)
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
MGMT 483 Week 8 Scheduling.
1 Operations Management Lesson 5 Project Management.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management. Maintenance and Reliability 14 Aug 2001.
Importance of Project Schedules
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Software Engineering Chapter 2: Software Project Management
COMP2001 HNC Project. Project Characteristics A project must have: clear objectives planning & control resources assurance of quality.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Fundamentals of Information Systems, Second Edition
Engineering Design Development. Turner College and Career High School.
OPSM 639, C. Akkan1 OPSM 639 Project Management Introduction to Microsoft Project - Part 2: Developing a Network Plan.
Gantt Chart Engineering Design Development. Turner College and Career High School.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
1 Project Management Education The Define Phase. 2 Agenda Introductions Project Management Review The Concept Phase Project Initiation Stakeholders and.
Microsoft Office Project 2007: Managing Projects.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
PROJECT PLANNING. PLANNING Planning is essential and software development is no exception. Achieving success in software development requires planning.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
4th Phase : 4th Phase : CONTROL Why is control necessary? Because:  People make mistakes  External factors can have impact on the project  Requirements,
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
4 th European Project Management Conference, London, 6-7 June 2001 Resource Critical Path Approach to Project Schedule Management Vladimir Liberzon, PMP.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
5 th LectureCEN 4021: Software Engineering II Task Sequence and Effort representation  All tasks share at least two basic characteristics –Require effort.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
Project Management – PTM721S
PROJECT MANAGEMENT.
Project Management: PERT/CPM
PERT & GANTT CHARTS An Introduction.
Documentation, Team Building and Project Planning
Most commonly used methods for project management.
Project planning Unit 3 Employability and Professional Development
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Action planning: Logical activity schedule
PERT-CRITICAL PATH-DECISION MAKING PROCESS/TOOLS
Project Time Management
PERT - The Program Evaluation and Review Technique
Project Planning By Phaik San Liew.
Planning assignment in MS-Project
Exercise – A small building.
Presentation transcript:

Planning activities: activity schedule logical framework - part 1 The purpose of this exercise is to familiarize students with the successive stages of development of the project: drawing a timetable for action and the logical framework of the project. Correction table made in previous classes by placing in it all the necessary information. Make a detailed schedule for your project.

critical taskarbitrarily shaded rectangle task relevant, non-negligible for the project, the completion of which determines the further proceedings; tasks critical and non-critical are afastened together by a summary Not critical taskrectangle with no fill task less relevant to the project - not a precondition for its success, but may be easier to achieve the goal summation rectangle, usually filled with "teeth" on the ends is the sign of a certain stage of the project, which consists of tasks, usually after the summary is a milestone that allows the acceptance of a phase and move on milestonea square rotated by 45 °, filled special kind of task completion signal a phase-off event, determines the transition to the next stage MILESTONE – ends with a step by unambiguous events such as the signing of the document, to obtain a result, an important meeting, approval of work Gantt Chart

Pert Chart

Assuming these scenarios do not happen, the slack for each activity can now be determined. Start and finish are milestones and by definition have no duration, therefore they can have no slack (0 work days). The activities on the critical path by definition have a slack of zero; however, it is always a good idea to check the math anyway when drawing by hand. LF a - EF a = = 0 LF c - EF c = = 0 LF e - EF e = = 0 LF g - EF g = = 0 Activity b has an LF of 9.17 and an EF of 5.33, so the slack is 3.84 work days. Activity d has an LF of and an EF of 10.33, so the slack is 4.68 work days. Activity f has an LF of and an EF of 14.83, so the slack is 4.68 work days.

Pert Chart – Visio Professional

Pert ChartPert Chart – Visio Professional

Pert ChartPert Chart – Visio Professional

Gantt Chart