1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
on Congestion Management (IG)
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
1 Market coupling Commission de Régulation de l’Electricité et du Gaz Fonctionnement Technique des Marchés September 2010 Common CSE – CWE RCC Meeting.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
IG meeting, December 5th, 2012, DERA premises, Copenhagen
NWE Day-Ahead Price Coupling
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
26th February 2015 Teleconference
26th February 2015 Teleconference
Presentation transcript:

1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs from the NWE Region

2 page 2 C O U P L E D Joint TSO-PX presentation Content Joint Project Planning Joint Project Organisation Budget Cost recovery / Cost Sharing Status on the APCA Regulator Questions

3 page 3 C O U P L E D Joint TSO-PX presentation Towards a European power market The Nordic market – 2000 Including Estonia 2010 Central West Europe – 2010 ITVC – 2011 Including embedded solution for BritNed cable to GB via APX and Price Coupling on SwePol via NPS

4 page 4 C O U P L E D Joint TSO-PX presentation Towards a European power market The Nordic market – 2000 Including Estonia 2010 (and full Baltic prel. end 2012) Central West Europe – 2010 ITVC – 2011 Including embedded solution for BritNed cable to GB via APX and Price Coupling on SwePol via NPS North West Europe – 2012 Including Price Coupling on SwePol via NPS, and NPSs work with the local TSOs on establishing day-ahead markets in Latvia and Lithuania 2300 TWh

5 page 5 C O U P L E D Joint TSO-PX presentation Towards a European power market The Nordic market – 2000 Central West Europe – 2010 ITVC – 2011 North West Europe – 2012 European solution – TWh

6 page 6 C O U P L E D Joint TSO-PX presentation High level timeline 2012 FebMayJunAugOct Dec Design phase Implementation phase Go-Live Preparation 1.Design Phase Impact analysis and change specifications, cost and cost recovery, algorithm requirements, algorithm prototype, governance for the operations phase, approvals 2.Implementation Phase Build/test/commission systems, prepare operations phase, communication to stakeholders 3. Operational phase Daily operations and maintenance MarAprJulSepNov Operational Phase

7 page 7 C O U P L E D Joint TSO-PX presentation Joint TSO/PX Target Planning* Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep 2012 Oct 2012 Nov 2012 Dec 2012 Q PX Design phase PX Development Test preparation Integration & Procedural Tests Readiness Dec 2012 Procedures Contingency PX and TSO System and Algo Test Algorithm industrialisation Go live system selection TSO Development Joint PX and TSO Design Contractual arrangements *To be validated

8 page 8 C O U P L E D Joint TSO-PX presentation Authorities and Stakeholder Target Planning* Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep 2012 Oct 2012 Nov 2012 Dec 2012 Q Readiness Dec 2012 Contingency NRA Algorithm Approval Go live system selection Documentation for solution approval from NRAs Market Party Validation NRA MC Solution Approval Auction Rules Consultation Auction Rules Approved Auction Rules Approval *To be validated Cost sharing approval

9 page 9 C O U P L E D Joint TSO-PX presentation Joint Project Organisation Joint PMO (external consultant) NWE JSC Legal, Regulatory and Market WG Tjitske Kramer Common TFs Local Sub-Projects TSO-only Sub-Project PX-only Sub-Project Common TFs Technical WG Corné Meeuwis

10 page 10 page C O U P L E D Joint TSO-PX presentation Budget Development The preliminary budgets for the design and implementation of the NWE Market Coupling comprise: Combined NWE PX costs of €10.3m –€3.3m (60%) of PCR Common Costs (commonly procured services: project manager, taskforce leaders, algorithm and system development) –€7m of local costs (support to PCR/NWE project plus PX-specific changes) NWE Common Costs of €0.8m, excluding shipping implementation costs (project office, taskforce leaders) The budgets assume a go-live at the end of December of NWE Market Coupling based on the PCR/PMB solution The budgets will be finalised as part of the APCA completion process during April Any change to this plan and possible budget changes are subject to JSC approval

11 page 11 page C O U P L E D Joint TSO-PX presentation Cost Recovery Development The NWE TSOs propose to reimburse reasonable costs incurred in the NWE market coupling project as follows: Design : –100% of each NWE PX’s share of the PCR Common Costs (in total representing not more than 60% of the total PCR Common Cost) –100% of each PX’s local costs in support of PCR and NWE prior to [1 March]/[completion of NWE Design Phase] Implementation: –75% of each NWE PX’s costs in support of the NWE implementation phase after [1 March]/[completion of NWE Design Phase], including share of NWE Common Costs NWE Common Costs will be shared on a per Party basis (TSOs and PXs)

12 page 12 page C O U P L E D Joint TSO-PX presentation Cost Sharing/ Recovery Development - Other The reimbursement of the PXs’ costs is limited to the approved budget The costs recovery proposal is based on the agreement between the TSOs to have costs eligible for recovery by TSOs be shared equally between all TSOs (except for CREOS who will half the costs) (same principle as under ITVC) In the event the budget is insufficient the Parties will negotiate in good faith a resolution, but PXs may restrict expenditure to the agreed budget Parties may enter into supplementary local cost sharing arrangements The common and local costs shall be validated, and the sharing arrangements subject to regulatory approval (end of April the latest)

13 page 13 page C O U P L E D Joint TSO-PX presentation Budget / Cost Recovery Operations Operational Common Costs are anticipated to be small, but any will be shared according to keys to be defined/agreed Specific services required by the TSOs will be provided at cost by the PXs – e.g., shipping Arrangements for recovery of PXs’ costs from tariffs and/or service fee for capacity allocation may be determined on a local basis, subject to regulatory approval.

14 page 14 page C O U P L E D Joint TSO-PX presentation Status on the APCA Negotiation team has agreed on the main body of the contract –Cost recovery needs to be inserted based on the principles presented in the presentation –Agreement on the outline of the annexes –Fine tuning on wording ongoing –Formal approval by JSC and individual parties pending

15 page 15 page C O U P L E D Joint TSO-PX presentation NRA Questions Algorithm requirements – input & output Input: –local order books submitted by PXs; PXs shall determine format and content –network and economic constraints provided for by the TSOs; TSOs shall determine format and content Output: –Market Clearing Price (MCP) for each bidding area for each hour, –shadow price of each constraint (for example flow based constraints) –Unconstrained prices for specified regions –set of accepted and rejected orders –net surplus/deficit (or export/import position) for each bidding area –Line flows for specified regions –slack value on each constraint –Quality of the solution (best indicator still under investigation)

16 page 16 page C O U P L E D Joint TSO-PX presentation NRA Questions General algorithm requirements Costs e.g. losses Ramping constraints (on flows and net positions) Minimum stable flows on DC lines (pending impact on planning) Minimum price differences Reliability Fairness Reproducibility Simplicity Multiple Currencies (requirement on solution, not algorithm) Different price boundaries Negative prices Calculation time/cut-off Transparency Extendibility Different Market Time Units (harmonized as a first step) Winter and Summer Time Hybrid ATC/FB Model Maximize Economic Surplus Flow calculations

17 page 17 page C O U P L E D Joint TSO-PX presentation TSO Questions/Requirements for NRAs Market coupling solution approval: –Market coupling is already in place for all NWE countries, except FR-GB –NWE TSOs suggest to describe the new developments for NWE market coupling, instead of redescribing existing solutions –The NRAs are asked to provide guidance on what and how much time is required for approval