PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH 1 3.3 PROJECT NETWORK DIAGRAM.

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

WBS: Lowest level OBS: Lowest level
Chapter 7 Project Management
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Based on the book: Managing Business Process Flows
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
Creating the Project Plan
MGMT 483 Week 8 Scheduling.
Project Scheduling Critical Path Method
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Developing a Project Plan Chapter 6.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
Analysing the AoN network Project Management (seminar)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management MGT 30725
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Scheduling Lecture # 1.
Time Planning and Control Activity on Node Network (AON)
Project Management for Business
Project Time Management.
Projects: Critical Paths
Analysing the AoA network
Project Management CPM Method Tutorial-p2
Time Planning and Control Activity on Node Network (AON)
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management CPM Method Tutorial-p1
Analysing the AoA network
Activity on Node Approach to CPM Scheduling
Analysing the AoA network
Time Planning and Control Activity on Node Network (AON)
BEST VIEWED IN SLIDE SHOW MODE
Project Management (lecture)
LECTURE 3.
Exercise – A small building.
Analysing the AoA network
Project Management (lecture)
Presentation transcript:

PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM

OBJECTIVES 2 Define Network Diagram Purpose of Network Diagram Method : Activity On the Node (AON) Identify ES, EF, LS, LF using Forward Pass Calculation and Backward Pass calculation Identify Critical Path Identify Slack Time

INTRODUCTION 3 A PND is a pictorial representation of the sequence in which the project work can be done. The activities and its duration are the basic building blocks needed to construct a graphic picture of the project Its provide - the earliest time at which work can be begin on every activity that makes up the project - the earliest expected completion date of the project

IMPORTANCE OF ND 4 ND can be used for ; i)Planning : gives a clear graphical picture of the relationship between project activities ii)Implementation : when updating the project file with activity status and estimate to completion data, the ND is then automatically updated and can be printed or viewed iii)control : while updated ND will retain the status of all activities, the best graphical report and controlling project work will be Gantt Chart

METHODS 5 I) THE ACTIVITY ON THE NODE ( AON) Basic unit of analysis in ND is the activity Each activity is represented by a rectangle ( activity node) Arrows represent the predecessor/successor relationship between activities Every activity in the project will have its own activity node ( each rectangle)

METHODS 6 I) THE ACTIVITY ON THE NODE ( AON) A B C D E F PDM format of a project network diagram

METHODS 7 I) THE ACTIVITY ON THE NODE ( AON) Dependencies - A dependency is simply a relationship that exists between pairs of activities - 4 types of activity dependencies ABFS : A finishes, B start

METHODS 8 I) THE ACTIVITY ON THE NODE ( AON) Dependencies FF : A finishes, B finish A B A A SS : A start, B start

METHODS 9 I) THE ACTIVITY ON THE NODE ( AON) Dependencies SF : A starts, B finish A B

I)THE ACTIVITY ON THE NODE ( AON) 10

11 I) THE ACTIVITY ON THE NODE ( AON) Forward Pass calculations Creating an initial project network schedule A 1 B 3 C 2 D 5 E 2 F 3 Start End

EST, LST, EFT, LFT 12 CPM uses the following times for an activity EST- Early Start time is the earliest time the activity can begin LST- Late Start Time is the latest time the activity can begin - still allow the project to be completed on time EFT- Early Finish Time is the latest time the activity can end LFT- Late Finish Time is the latest time the activity can end - still allow the project to be completed on time

Forward Pass calculations 13

Backward Pass calculations 14

CRITICAL PATH METHOD (CPM) 15 An effective way to analyze complex projects Represent the critical set of activities to complete a project Help to focus on essential activities which are critical to run the project Allows the project manager to concentrate on important activities CP is the longest path on ND and the most important part Any delays on the CP will lead to delay of the project

CRITICAL PATH METHOD (CPM) 16

FLOAT 17 Also known as slack, total float and path float Is computed for each task by subtracting EFT from the LFT the early start from the late start) Is the amount of time the task can slip without delaying the project finish date. Free float is the amount of time a task can slip without delaying the early start of any task that immediately follows it.

Slack Time calculations 18

EXAMPLE 19 ActivityPrecursorDuration (week) A-7 BA6 CA5 DA,B4 EB,C3 FD,E2 1. TABLE 1 shows the activities and the durations required to complete a construction project, including the precursor activity. Refering to the TABLE 1: i) draw the project network diagram. ii) state the activities on the critical path. iii) calculate the minimum duration of the project.

20 project network diagram A D C E F B START END activity ES D EF LS F LF