1 PERT Chart for Nekretnine Macronet 2012. [2012.] 1 2 3 4 5 6 8 7 5 6 2 6 53 1 T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23.

Slides:



Advertisements
Similar presentations
Associate Professor MIS Department UNLV
Advertisements

Finding the Critical Path
Chapter 3 Project Management.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Operations Management Session 27: Project Management.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Software Project Planning.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Network Analysis and Duration Estimating Kathy S. Schwaig.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Tutorial 2 Project Management Activity Charts (PERT Charts)
Creating the Project Plan
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
MGMT 483 Week 8 Scheduling.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers are responsible for.
Critical Paths.
Project Scheduling. SEEM Project Scheduling (PS) To determine the schedules to perform the various activities (tasks) required to complete the project,
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management Techniques.
CRITICAL PATH DEFINITION.  ALL the tasks that determine the end date in your project schedule.  The critical path is the longest PATH, through the “AON”
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT PLANNING. PLANNING Planning is essential and software development is no exception. Achieving success in software development requires planning.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.
1 Selected Topics on Project Management The Critical Path Dr Marc Conrad 1Marc Conrad.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
6/10/01Network Problems: DJK1 Network Problems Chapters 9 and 10.
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
5 th LectureCEN 4021: Software Engineering II Task Sequence and Effort representation  All tasks share at least two basic characteristics –Require effort.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Production Activity Control
Network Analysis Prepared by hanadi. NetWork(start/end node) A.Draw network? B. Determine the critical path DurationActivity (I,j) 5A(1,2) 4B(1,4) 3C(1,5)
Managing the Information Systems Project Cont’d
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management.
Animation of a planning
deterministic Fixed and known in advance, representing a
Additional line balancing notes
Project Scheduling Lecture # 1.
Most commonly used methods for project management.
Project Management and scheduling
Project Time Management.
Project Management CPM Method Tutorial-p2
Critical Path Analysis
תזמון פרויקטים.
PERT - The Program Evaluation and Review Technique
Activity Networks
3.1 Earliest Start Times.
Project Management CPM/PERT Professor Ahmadi.
Lesson Objective Understand Cascade diagrams and be able to use them to draw resource histograms.
Exercise – A small building.
AOA A style of project network diagram in which arrows
Presentation transcript:

1 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23 Project Spec. XML configurator Transfer properties Test XML Contact agents Homepage design/coding Setup code and dbase Testing portal/SEO 7

2 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23 7

3 PERT Chart Task. A project defined with list of activities and required times for completion: Activity No. ActivityExpected completion time Dependency 1.Specification5 days- 2.XML configurator6 days1 3.Setup code and dbase7 days1 4.Test XML2 days2,3 5.Homepage design/coding6 days4 6.Contact agents5 days5 7.Transfer properties3 days4 8.8.Testing portal/ SEO1 day5,7 Portal is functional a. Draw a PERT chart for the activities. b. Calculate the earliest expected completion time. c. Show the critical path.

4 PERT Chart (cont’d) a.Draw a PERT chart for the activities. Using information from the table, show the sequence of activities

5 PERT Chart (cont’d) b. Calculate the earliest expected completion time. 1. Using information from the table, indicate expected completion time for each activity Calculate earliest expected completion time for each activity (T E ) and the entire project. Hint: the earliest expected completion time for a given activity is determined by summing the expected completion time of this activity and the earliest expected completion time of the immediate predecessor. Rule: if two or more activities precede an activity, the one with the largest T E is used in calculation (e.g., for activity 4, we will use T E of activity 3 but not 2 since 12 > 11). T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23

6 PERT Chart (the end) T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23 c. Show the critical path. The critical path represents the shortest time, in which a project can be completed. Any activity on the critical path that is delayed in completion delays the entire project. Activities not on the critical path contain slack time and allow the project manager some flexibility in scheduling. 7