Engineering Economics

Slides:



Advertisements
Similar presentations
Some Practice Questions in Engineering Economics
Advertisements

Chapter 4 More Interest Formulas
Example 1: In the following cash flow diagram, A8=A9=A10=A11=5000, and
Engineering Economics I
Econ. Lecture 3 Economic Equivalence and Interest Formula’s Read 45-70
Engineering Economics ENGR 3300
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
Chapter 2 Solutions 1 TM 661Chapter 2 Solutions 1 # 9) Suppose you wanted to become a millionaire at retirement. If an annual compound interest rate of.
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
CTC 475 Review Uniform Series –Find F given A –Find P given A –Find A given F –Find A given P Rules: 1.P occurs one period before the first A 2.F occurs.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
(c) 2002 Contemporary Engineering Economics
(c) 2002 Contemporary Engineering Economics
Contemporary Engineering Economics, 4 th edition, © 2007 Unconventional Equivalence Calculations Lecture No. 9 Chapter 3 Contemporary Engineering Economics.
LECTURE 6 NONUNIFORM SERIES Prof. Dr. M. F. El-Refaie.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Engineering Economic Analysis Canadian Edition
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
TVM Sample Problems (ver. 2.1 Fall 13) 1 More Than One Future Cash Flow? YesNo Even or Uneven Cash Flows Uneven Even CF Worksheet Annuity (5 parameters)
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 3 Applying Time Value Concepts.
The Time Value of Money, An Overview Prof. Alley Butler Chapter 4 Part 1.
Single-Payment Factors (P/F, F/P)
The Time Value of Money. Why is £100 today worth more than £100 tomorrow? Deposit account in bank pays interest, so, overnight, £100 will have grown to.
Exam I Review Exam is closed text book, no loose sheet paper
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
Economic System Analysis January 15, 2002 Prof. Yannis A. Korilis.
Multiple/Continuous Compounding. Understand Effective Interest Rates Figure out how to use Inflation/Deflation in your decisions.
TM 661 Engineering Economics for Managers Unit 2 Multiple/Continuous Compounding.
NPV and the Time Value of Money
Equivalence and Compound interest
Interest and Interest Rate Interest ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth $1025. Interest earned.
Single-Payment Factors (P/F, F/P) Fundamental question: What is the future value, F, if a single present worth, P, is invested for n periods at an ROR.
TIME VALUE OF MONEY A dollar on hand today is worth more than a dollar to be received in the future because the dollar on hand today can be invested to.
Interest Formulas – Equal Payment Series
ENGINEERING ECONOMICS ISE460 SESSION 3 CHAPTER 3, May 29, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Recommendations – no obligation Chapter.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
1 Perpetuity (Capitalized Cost) Occasionally, donors sponsor perpetual awards or programs by a lump sum of money earning interest.Occasionally, donors.
EML EML Engineering Design Methods Engineering-Economics Introduction Economic Decision Rules Hyman: Chapter 8.
1 Cash Flow Patterns The “LEGO” blocks of Engineering Economics.
LEGOs Theory Continued… ● In learning about compound cash flows, we found ways to decompose and convert the cash flow pattern building blocks from one.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
Equivalence of cash flows Construction Engineering 221.
Engineering Economic Analysis Canadian Edition Chapter 4: More Interest Formulas.
MGT 470 Ch 4 TVM (cs3ed) v1.0 Aug 15 1 Ch 4: Time Value of Money Time Has Value (The Time Value of Money – TVM):  Time affects the value of financial.
EGR Single-Payment Factors (P/F, F/P) Example: Invest $1000 for 3 years at 5% interest. F 1 = (1000)(.05) = 1000(1+.05) F 2 = F 1 + F.
TM 661 Engineering Economics for Managers Unit 1 Time Value of Money.
CHAPTER 5 TIME VALUE OF MONEY. Chapter Outline Introduction Future value Present value Multiple cash flow Annuities Perpetuities Amortization.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Living with the lab Engineering Economics - Cash Flow Diagrams Cash flow diagrams provide a simple way to visualize the cash that comes “in” and the cash.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Chapter 4 More Interest Formulas
MODULE 2: SUPPLEMENTAL EXAMPLES Instructor: Dr. Chun Yu School of Statistics Jiangxi University of Finance and Economics Fall 2015.
Equivalence Factors and Formulas Moving Money Around.
Unconventional Equivalence Calculations
Practical uses of time value of money factors
Chapter 2 Time Value of Money
Example 2.14:Powerball Lottery
LECTURE 6 NONUNIFORM SERIES
Engineering Economics
Let’s work some problems…
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Engineering Economics - Introduction
Let’s work some problems…
Let’s work some problems…
Presentation transcript:

Engineering Economics 4/14/2017 5:03 AM Concepts from the example problems ( F / P, i, N)  Problem 1 ( P / F, i, N)  Problem 2 ( F / A, i, N)  Problem 3 ( A / F, i, N)  Problem 4 ( P / A, i, N)  Problem 5 ( A / P, i, N)  Problem 6 ( P / G, i, N)  Problem 7 ( A / G, i, N)  Problem 8 Copyright (c) 2004 - 2008, K. D. Douglas & D. H. Jensen

Example 1 How much would you have to deposit today to have $2000 in 4 years if you can get a 12% interest rate compounded annually? GIVEN: F4 = $2 000 i = 12% FIND P: 1 2 3 n=4 P? $2 000 DIAGRAM: P = F4(P/F,i,n) = 2 000(P|F,12%,4) = 2 000(0.6355) = $1 271

Different Ways of Looking at P/F From previous example, if you can earn 12% compounded annually, you need to deposit $1271 to have $2000 in 4 years. You are indifferent between $1271 today and $2000 in 4 years, assuming you can earn a return on your money of 12%. The present worth of $2000 in 4 years is $1271 (i = 12% cpd ‡ annually). ‡ my abbreviation for compounded If you could get 13% on your money, would you rather have the $1271 today, or $2000 in 4 years ?

Example 2 Tuition costs are expected to inflate at the rate of 8% per year. The first year’s tuition is due one year from now and will be $10,000. To cover tuition cost for 4 years, a fund is to be set up today in an account that will earn interest at the rate of 5% per year, compounded annually. How much must be deposited into the fund today in order to pay the 4 years of tuition expenses?

Present Given Gradient (Geometric) Engineering Economics 4/14/2017 5:03 AM Present Given Gradient (Geometric) g is the geometric gradient over the time period (time period: Time 0 to Time n, 1st flow at Time 1) P is the present value of the flow at Time 0 (n periods in the past) i is the effective interest rate for each period Note: cash flow starts with A1 at Time 1, increases by constant g% per period n A1 P ? 1 2 3 P = A1(P/A,g,i,n) g = % Copyright (c) 2004 - 2008, K. D. Douglas & D. H. Jensen

Example 2 Tuition costs are expected to inflate at the rate of 8% per year. The first year’s tuition is due one year from now and will be $10,000. To cover tuition cost for 4 years, a fund is to be set up today in an account that will earn interest at the rate of 5% per year, compounded annually. How much must be deposited into the fund today in order to pay the 4 years of tuition expenses?

Example 2 - Concept If your rich Aunt Edna wanted to put a sum of money in the bank today to pay for your next four years of tuition, that sum would be $39,759 assuming 5% return on investment and tuition that begins at $10,000 increasing by 8% per year. This problem assumes tuition is due at the end of the year.

Complex Cash Flows Complex Cash Flows – Break apart (or separate) complex cash flows into component cash flows in order to use the standard formulas. Remember: You can only combine cash flows if they occur at the same point in time. (This is like building with LEGOs!)

Problem 3 A construction firm is considering the purchase of an air compressor. The compressor has the following expected end of year maintenance costs: Year 1 $800 Year 2 $800 Year 3 $900 Year 4 $1000 Year 5 $1100 Year 6 $1200 Year 7 $1300 Year 8 $1400 What is the present equivalent maintenance cost if the interest rate is 12% per year compounded annually?

Problem 3 – Alt Soln 1 GIVEN: MAINT COST1-8 PER DIAGRAM i = 12%/YR, CPD ANNUALLY FIND P: P = PA + PG + PF = A(P/A,i,n) + G(P/G,i,n) + F(P/F,i,n) = $700(P/A,12%,8) + $100(P/G,12%,8) + $100(P/F,12%,1) = $700(4.9676) + $100(14.4715) + $100(0.8929) = $5014 DIAGRAM: P ? 1 2 3 n=8 $700 $100 4 $200 $300 PA ? 1 2 3 n=8 $700 4 $100 PF ? n=1 PG ? 1 2 3 n=8 $100 $700 $200 $300 4 NOTE: CAN BREAK INTO 3 CASH FLOWS: ANNUAL, LINEAR GRADIENT, AND FUTURE

Problem 3 – Alt Soln 2 GIVEN: MAINT COST1-8 PER DIAGRAM i = 12%/YR, CPD ANNUALLY FIND P: P = PA + PG(PPG) = A(P/A,i,n) + G(P/G,i,n-1)(P/F,i,1) = $800(P/A,12%,8) + $100(P/G,12%,7)(P/F,12%,1) = $800(4.9676) + $100(11.6443)(0.8929) = $5014 DIAGRAM: P ? 1 2 3 n=8 $800 $100 $600 4 $200 PA ? 1 2 3 n=8 $800 4 PG ? PPG ? 1 PG ? 1 2 n=7 3 $100 $600 $200 NOTE: PG MUST BE OFFSET ONE YEAR – SO BRING THE OFFSET YEAR BACK TO TIME ZERO

Problem 4 A young couple has decided to make advance plans for financing their 3 year old daughter’s college education. Money can be deposited at 8% per year, compounded annually. What annual deposit on each birthday, from the 4th to the 17th (inclusive), must be made to provide $7,000 on each birthday from the 18th to the 21st (inclusive)? 17 21 yrs $7 000 A ? DIAGRAM: 4 18 GIVEN: WITHDRAWALS18-21 = $7 000 i = 8%/YR, CPD YEARLY FIND A4-17: P17 = A(F/A,i,n) = A(P/A,i,n) = A(F/A,8%,14) = 7 000(P/A,8%,4) = A(24.2149) = 7 000(3.3121)  A = $957 STRATEGY: CAN BREAK INTO 2 CASH FLOWS, SO PICK A CONVENIENT POINT IN TIME AND SET DEPOSITS EQUAL TO WITHDRAWALS…