Practioners Perspective Regional / Structural Funds Mike Shaw (Ceredigion County Council) for Welsh Local Government Association 9 th December 2010.
Advertisements

European Union Cohesion Policy
European Territorial Co-operation Eligibility of expenditure for co-operation programmes Art. 17(1) ETC Regulation 16th meeting of the Expert Group on.
USING TRANSPARENCY TO SUPPORT THE PRICING (AND COST RECOVERY) STRATEGY Jim Port J M Consulting Ltd.
Key points for the future guidance on direct costing for large infrastructures in Horizon 2020 Brussels, 08 April 2013 Vittorio Morelli RTD.M.1.
Component Accounting Briefing
GRIP- IT Governance of Regionally Integrated Projects using Innovative Tools. (Structural Funds implementation in an integrated approach )EXPENDITURES.
New Models for Sustainability Directed Care environment Australian Multicultural Community Services approach to financial tracking in a Client Directed.
Finance Presentation Chris McCarthy Pobal is a not-for-profit company with charitable status that manages programmes on behalf of the Irish Government.
What is FEC? Full Economic Costing. Background  1998 Spending Review – Extra Research Funding  TRAC: All Universities were in deficit for research Significant.
FULL COST RECOVERY York Community Accounting Scheme.
ESIF Business Process and Simplification Nic Suggit Department of Communities and Local Government 24 April 2014.
H2020 Finance Presentation
(AS 12) Accounting for Government Grants. Scope This Statement does not deal with: (i) the special problems arising in accounting for government grants.
RCUK fEC Update. Full Economic Costing From 1 September 2005, research grants awarded by the UK Research Councils.
Audit Committee 28 June 2011 Financial Accounts Claire Cook -Assistant Finance Director and Joanne Watts – Head of Finance.
Simplified Cost Options. Organizational structure National Development Agency Internal Audit Cabinet Legal Affairs Communication HR Vice-president for.
Full Economic Costs (fEC) objectives of presentation Full Economic Costs Staff presentation June 2008 overview of fEC and link to TRAC to review fEC -
1 ASEM IFRS SEMINAR Shanghai, March 2006 Impairment of Assets Dr Allister Wilson Technical & Audit Partner Ernst & Young, UK Senior Advisor to the.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing resources Finance – People – Knowledge Part 1 Strengthening Statistics Produced in.
School of Social Sciences Research Costing / Recovery of Overheads Mary White – Senior Management Accountant 23 February 2010.
Full Costing of Research Strategic Issues & Challenges Pierre Espinasse University of Oxford.
Copyright 2001 November 2001 Venture 2002 – introduction to the financial planning model.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
Full Costing An introduction and lessons learnt from the UK and Finland Pierre Espinasse.
6 September 2012 GUIDE FOR APPLICANTS CORE 2012 CALL – ELIGIBLE COSTS AND FINANCIAL ISSUES ANNA FASTYN CHIEF EXPERT SECTION FOR BILATERAL PROGRAMMES AND.
Louis Vervloet, General director, ESF Agency Flanders
1 An introduction to Project Cycle Management PCM DAY 3 Gori, 31/3 – 3/4/2015.
CORNERSTONES TO MANAGING INFORMATION TECHNOLOGY. WHY SERVICE LEVEL AGREEMENTS? Customer Perceptions---Fantasy? Customer Expectations---Reality Customer.
Adult Education and Literacy Budget Development and Cost Allocation.
SESSION 2: ESIF Simplification Workshop – Update on Simplified Cost Options (SCOs) Nicola Lavin, NW Growth Delivery Team Arpley House Warrington
Communication campaign Most common issues identified: - Indirect Costs Thanos BATSILAS FCH JU Financial Officer.
FP7 basic financial issues How much money do I get from Brussels? Kim Kruisinga, Agentschap NL.
1 The simplified cost options: Flat rate for indirect costs, standard scale of unit costs and lump sums OPEN DAYS Workshop 06D06 – Simplification of Cohesion.
Volvox Understanding the Budget Angela Pettit – Contracts Officer.
September Presentations to Staff1 Transparent Approach to Costing (TRAC) : an update.
1 Expert Group Meeting Brussels, 13 March 2015 Study to determine flat-rate revenue percentages for the sectors or subsectors within the fields of (i)
ADB Grant No.0133-CAM/Component 1: PFMRD ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Day 1: June 07,
Profit and Loss Account. Introduction The Profit and loss account is one of the thee most important financial statements The Profit and loss account is.
By Samuel Bediako & Mo Zhang IFRS for Small and Medium Entities(SME)
Introduction “The process which charges fixed as well as variable overheads to cost units”
Future Research Leaders Program Module 5 Financial, Resource and Risk Management.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Simplified Cost Options Impatto della semplificazione sulle attività dei controlli Francisco MERCHÁN CANTOS Direttore Audit DG EMPL Firenze, 21 novembre.
Lancashire Schools Forum School Budget 2015/16, including Recommendations from Chairman’s group on 12 January 15 January 2015.
NACT Peter Holt Head of Finance, London and South East Thursday 25 th February 2016.
© Shutterstock - olly Simplified Costs Options (SCOs) The audit point of view.
Auditing for achievement Does Partnering Work ? Partnerships.
© Shutterstock - olly Simplified Costs Options (SCOs)
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
Cluster Host Preparation Meeting Autumn Term 1a Overview and Action Planning Judith Carter Senior Adviser Complex Needs/Vulnerable Learners
Customer Charge On behalf of all DNs 19 November 2010.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Joint Finance Day Jenni Field Head of Finance Strategy.
THE BIGGEST WINNER Uniform Guidance. Test Your Knowledge UG Basics Equipment & Facilities Shared Costs Items of Cost Bits & Pieces
High Level Policy on Means Testing
Simplified Cost Options: DG EMPL audit approach
Leader ECA audit findings and possible simplification
The Second Stage Consultation on Fair Funding for Schools
New SEN Funding Arrangements 13/14
Simplification in ESI funds for
INTERREG IPA CBC “GREECE ALBANIA ”
Role & Responsibilities
Use of SCOs in the ESI funds: Survey of OPs 2017
Eurostat Management Plan 2015 for Regional and Urban statistics
Funding the full economic costs of research
Philippe Stauffer 29th IARIW Conference Session 7 A SNA (2)
ESF Eligibility Rules Tom Whelan ESF Certifying Authority in Ireland.
University of Pittsburgh
Presentation transcript:

Director, Northwest Universities European Unit ERDF Overheads Neil Clatworthy Director, Northwest Universities European Unit www.nwueu.ac.uk 24th April 2014

Increased scrutiny of overheads: Recent DG Regio and ECA audits have highlighted the fact that in many cases, ineligible costs have been included in the calculation of overheads for ERDF projects. “The inability of the organisations concerned to provide an audit trail for overheads tested through to defrayal, or use of apportionment methods not acceptable to the EU resulted in significant percentage of allocated funds being clawed back”. “Due to the complexity of calculating and accurately recording and reporting overhead costs, Grant Recipients are strongly advised to consider whether their inclusion will add value to the ERDF project”. National ERDF Handbook states: DCLG is therefore minded towards adopting a flat-rate approach for 2014-20. In our view there is a strong argument that for the HEI sector it is still worth the cost of calculating an eligible ERDF overhead rate.

Direct charging or overhead? Wherever possible it is simplest to charge as many items/types of expenditure as direct costs: Can provide a better cost recovery against some items. Can provide a simpler and more direct audit trail. However not all costs or services (for example finance office, HR, estates & utilities, IT support etc.) can be easily charged on a direct basis especially when costs need to be linked back to defrayment. For HEIs, relevant indirect costs can however be charged against an ERDF project via agreed methodologies for fair and equitable apportionment.

Why are Indirect costs important? Indirect costs for HEIs are relatively significant and need to be reflected in project costs. They are after all real costs! Maintain consistency with in-house finance systems and audit trails. The agreed methodologies for calculating indirect costs are all based on the process for Full Economic Costing that all HEIs undertake annually to calculate overhead rates for related activities (e.g. research). There is however additional effort required due to the need for extra ‘filtering’ of ERDF ineligible costs: – you do need to make friends with your colleague(s) in Finance responsible for TRAC!

Ability to alignment with in-house financial systems - TRAC TRAC is designed to enable HEIs to demonstrate the ‘true cost’ of their activities. TRAC is a methodology that consolidates all central costs – e.g. Finance, Estates, HR, IT services etc. – enabling the calculation of an annualised indirect cost per FTEs. TRAC rates are calculated annually by every HEI based on institutional annual accounts.

Current HE ERDF Overhead Methodology: For ERDF activities HEIs derive a rate using the TRAC methodology as a basis and then apply extra filters to remove ERDF ineligible elements – for example: Amounts charged to ineligible or irrelevant cost centres/activities through the TRAC model. Any direct staff and non-pay costs charged directly to projects The charge for buildings depreciation funded from the release of deferred capital grants. The cost of Capital and Infrastructure adjustments Any items that are deemed ineligible for ERDF grant support. Any items which cannot be evidenced as relating to/consumed by the project.

‘Real’ cost or Flat rate - Key Pros / Cons Lancaster University & NWUEU have helped a number of wider HEIs derive compliant methodologies across the country – rates vary between HEIs, with some higher for more urbanised HEIs (Greater London). Once you have derived the internal filters it’s a relatively simple process to update and re-run on an annualised basis.

Is it worth it? The view by a number of HEIs is that the initial ‘pain’ is worth it – better recovery / ability to use overheads as match should not be underestimated. For many Universities losing the ability to match overheads at the ‘real’ rate would mean their ERDF projects/proposals would be unviable. It is recognise that for many institutions a fixed rate methodology suits them better and is a viable option. Under the current DCLG guidance HE has a choice of either option – this should be retained. There needs to be a better collective understanding of HEI indirect costs and minimisation of potential future issues on audit. We must to work more closely with our internal (Finance) colleagues and DCLG Better interpretation and application of European regulations on the eligibility of project costs. It’s all about better partnerships!

Future direction? We welcome the drive for greater simplification however retention of existing good practice is equally important. Key message: let individual HEIs have the choice – let’s not get taken down a single methodology option. THANK YOU

Questions?