SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
September 28, 2013 Greg Duncan, Assistant Chief Engineer of Operations Anaheim, CA Performance Based Maintenance Contracting in Tennessee (Experience One.
QUALITY ASSURANCE FOR CONTRACTED MAINTENANCE IN ONTARIO, CANADA
Maintenance October 5, District 11 Overview Safety and Move Over Law Adopt-A-Highway Maintenance TOPICS.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
PUBLIC WORKS DEPARTMENT
State of Morrisville Mayor Mark Stohlman July 17, 2014.
6TH ANNUAL CONFERENCE.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Severe Winter Weather Warning and Preparedness 2014 Meg Pirkle, P.E., Director of Operations Georgia Department of Transportation.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Charlottesville Residency Monthly Report 1 April 2004   Mission  Essential Tasks Assessment  Construction & Maintenance  Planning & Traffic Engineering.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Joe Turner, PE Disaster Recovery Engineer. DIVISIONS AND DISTRICTS.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Hurricane Preparedness in South Carolina Jim Feda, P.E. Director of Maintenance.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
6 TH ANNUAL CONFERENCE. Performance Based Maintenance Results Tim Lattner, P.E. Director, Office of Maintenance, Florida Department of Transportation.
Chapter 4. NEVER drive faster than weather or road conditions allow Always slow down On narrow winding roads At intersections or railroad crossings On.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
PRESENTATION OF FLEET AND FUEL CONSOLIDATION BUDGET AND FISCAL AFFAIRS COMMITTEE AUGUST 31, 2010.
FY 2012 President’s Budget Released February 14, 2011.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Trail Funding Sources & General Information
"The Use of Condition Assessments to Improve Maintenance Level of Service in Texas" Joe S. Graff, P.E. Texas Department of Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Hearing the Silence : Putting Maintenance First (A semiosis)
KY Transportation Cabinet The Cabinet & Information Technology James D. Ramsey Director / ITO Division of Technology CTC Governance Team February 24, 2005.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Rules and Regulations for Safe Driving
AT THE CROSSROADS Building for the Next Generation Council of State Governments May 30, 2008 Lexington, Kentucky.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
Georgia’s Intelligent Transportation System
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Transportation Finance Advisory Committee May 18, 2012.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
Traffic Management System Status Update February, 2008.
1. PUBLIC WORKS 2 Traffic in Synch  Synchronization of traffic signals began December 2007  2,300 signals synchronized as of June 2010  On track to.
Incident Management Assistance Patrols (IMAP) In Highway Scene Management.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
VDOT’s Operations Program Update and Opportunities June 6, 2014 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
© 2016 HDR, Inc., all rights reserved. May What make PBMC Unique and Effective.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
PUBLIC WORKS DEPARTMENT
VDOT’s Operations Program Opportunities May 20, 2016
The Key Elements of Developing a Traffic Control Plan
Responsibilities and FUNDING
DESIGN-BUILD PROGRAM OVERVIEW
Presentation transcript:

SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014

2 Outline Overview of Assets History of Contracting Asset Maintenance Current Status Recent Efforts Future Efforts

Overview of Assets  Roadway – 16,592 Centerline Miles 895 Centerline Miles of Interstate  Bridges (State Owned) Movable Bridges – 102  Rest Areas – 10  Ferry Crossings – 5  Traffic Management Centers – 5  Motorists Assistance Patrols – 17  Motorists Assistance Tow Trucks – 3  Signs – Over 1 Million  Signalized Intersections – 3,073  Tunnels – 3  Toll Facilities - 1

History of Contracting Asset Maintenance  1990 – Began Contracting for Mowing and Litter Collection on Interstates Right-of-Ways  1990 to 2000 – Systematic contracting for: Guardrail Repairs Attenuator Repair and Maintenance Interstate Pavement Markings Rest Area Maintenance and Security Mowing and Litter Collection on Major and Divided 4-Lane Corridors Use of Memorandums of Agreement with Local Governments for Mowing/Litter Collection and Traffic Signal Maintenance/Operations

History of Contracting Asset Maintenance  2005 to 2011 – Added Contracts for: Motorists Assistance Patrols Motorists Assistance Tow Trucks Operation of Traffic Management Centers Median Cable Barrier Repairs Sweeping Program Management of LOGOS and Tourists Oriented Destination Signs (TODS) Contingency Contracts for Emergency Operations o Debris Removal, Reduction, and Disposal o Debris Removal Monitoring o Sign Repair o Traffic Signal Repairs

Current Status of Maintenance Contracting  Most Maintenance Activities on the Interstates  Except for Sign Maintenance, Pavement Repair, and Incident Response  All Rest Area Operation and Security  All Motor Assistance Patrols and Tow Trucks  All Traffic Management Center Operations  Total Annual Contract Costs Approximately = $30M  No Performance Based Contracts

Recent Efforts  Consolidation of Short Segment/Small Contracts into Larger Statewide/District-wide/Corridor Contracts  Fence-to-Fence Maintenance Pilot Projects on I-55 In Hammond and I-10 in Lafayette o Unit Price, Low Bid Contract o Work Order Basis o Awarded I-55 Contract Only $3.6M 66 CL Miles 2 year term

Recent Efforts  Movable Bridge Light Maintenance and Operation Pilot Project o Request for Proposals (Qualifications Based Selection) o Awarded in March 2014 o 5 bridges (1-24 hour, 4 on-call) o 1 year term with 3 renewals o $225K Annual Contract Maximum

Recent Efforts  Development of Performance Based Contract Provisions for Asset Maintenance of the I-20 Corridor in Monroe District Low Bid Selection 116 Centerline Miles 5-Year Term with Additional 5-Year Renewal Annual Renewable Bonds Exclusions: o Rest Areas o ITS Equipment o Motorist Assistance Patrols o Bridge Inspections (NBI) o LOGOS, TODS, Outdoor Advertising

Future Efforts  Advertise for Performance Based Asset Maintenance of the I-20 Corridor in Monroe District This Year  Performance Based Operations and Security Contract for all Rest Areas o One Contract for all 10 Rest Areas  Performance Based Regional Asset Maintenance Pilot Project  Expand Movable Bridge Light Maintenance and Operation

Rhett A. Desselle, P.E. Phone: