Gun3 2004 summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time New cathode – “yellow” 25 deg SS polished to 1um, 100kV.

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Status of 500-kV DC gun at JAEA N. Nishimori, R. Nagai, R. Hajima Japan Atomic Energy Agency (JAEA) M. Yamamoto, T. Miyajima, Y. Honda KEK H. Iijima, M.
SFB Investigation of pulsed spin polarized electron beams at the S-DALINAC PSTP 2013 PSTP Martin Espig – M. ESPIG, J. ENDERS, Y.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
K 2 CsSb Cathode Development John Smedley Triveni Rao Andrew Burrill BNL ERL needs – 50 mA, 7 mm dia., 1.3 mA/mm 2.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
05/20/ High-Current Polarized Source Developments Evgeni Tsentalovich MIT.
GaAs and CsKSb Photocathodes for DC Gun
Rong Xiang I I Photocathodes for Rossendorf SRF gun Rong Xiang for HZDR SRF-gun team 1 st Topical Workshop on laser based particle.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
PESP2008 Graduate School of Science, Nagoya University M.Yamamoto, T.Konomi, S.Okumi, Y.Nakagawa, T.Nakanishi Graduate School of Engineering,
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Strained Superlattice.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Agenda Cooling finger HV-Prep Valve (2-3/4” vs. 4-1/2“) Puck moves = QE falls Prep vacuum & bakeout Abnormal beam shape and orbit from HV chamber.
PESP 2008 JLAB 1st-3rd Oct Photocathode Preparation System for the ALICE Photoinjector Keith Middleman Vacuum Science Group ASTeC, Daresbury UK.
Measurements of Photocathode Operational Lifetime
Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility M. Poelker,
LAPPD Collaboration Review 12/9/2011 Ossy Siegmund, Sharon Jelinsky, Jason McPhate, Joe Tedesco Experimental Astrophysics Group, Space Sciences Laboratory,
V. Tioukine, Inst. of Nuclear Physics, Mainz, Germany Atomic Hydrogen Cleaning of Super Lattice photo cathodes.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
09/10/2007 Polarized Source for eRHIC Evgeni Tsentalovich MIT.
Preparation chamber 1.Chamber status 2.Preparation methods 3.Results: photocurrent, stoichoimetric control 4.Next step.
High Intensity Polarized Electron Gun Studies at MIT-Bates 10/01/2008 PESP Evgeni Tsentalovich MIT.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Non-conservation of the charge lifetime at high average current R.Barday University Mainz, Germany INFN Milano-LASA 4-6 October 2006.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
Outgassing Test and the Getter Specification
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Beam Loss Issues for High-Power, High-Brightness Electron Injectors Bruce Dunham Cornell University December 18, 2012.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility M. Baylac,
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Paolo Michelato, Workshop on High QE Photocathodes, INFN-Milano LASA, 4 – 6 October Photocathodes: Present status and future perspectives Paolo Michelato.
Photocathode R&D for bERLinPro
Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab MCC 1:30pm Meeting March 30, 2011 Q weak.
A bit of CEBAF polarized source history…
Beam Commissioning Adam Bartnik.
SLSP activated well on April 7th
SUMMER 2017 SUMMER 2018 >= SUMMER 2019
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
GaAs Photocathode Development
DC Injector and Space Charge Simulation Status
Polarized Gun R&D at Fermilab
K2CsSb cathode tests at Jlab
Further Measurements of Photocathode
QWeak Collaboration Meeting
ELIC Injector Working Group High-P, high-I source issues (DC)
Polarized Positrons at Jefferson Lab
Strained Superlattice GaAs
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Injector Studies Using Superlattice Photocathode
Status of Cathode System in FZR
Polarized Source: Recent Activities
Injector Setup for G0 and HAPPEX & Lessons Learned
Shukui Zhang, Matt Poelker, Marcy Stutzman
LLGUN2 Biased Anode Commissioning
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Presentation transcript:

Gun summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time New cathode – “yellow” 25 deg SS polished to 1um, 100kV New cesiator strips Sacrificial bulk w/ large Ta cup Bakeout good – no leaks Bulk activation 4% at 670 nm w/ UHV ~ 5nA baseline (ELOG ) HiPot stalk out 120kV OK vac burst 110kV & stalk in 110kV OK – cathode OK SVT4722#2 loaded No hydrogen cleaning In solder – no heat in air 5 mm polished Ta cup Stalk#4 Loaded into Gun3 on 8/11/04 Bakeout good – no leaks Cathode heat C Activation OK - 5% at 655 nm and 0.65% at 769 nm Preliminary SVT4722#2-GUN3 Status (1/12/05)

Hall A 776 nm Hall B 655 nm Hall C 782 nm Gun3 SVT4722#2 Heat 45 min up Cool Reactivate ~15 yo-yo’s Vacuum < 20 nA Hi-Pot Stalk Out - OK Stalk In - OK Typ. 60  A leakage

Notably good injector setup… Measured beam polarization, surface charge limit, analyzing power Calibrated HVPS against Pcup Early demonstration of possible “Qweak”-type beam

ELOG# SVT4722#3VGUN (Reblochon)

Calibrate laser power vs. attenuator over relevant range… Measure photocurrent vs. laser power twos ways… 200  A ramp 100  A  A ramp

QE vs. laser power at 776 and 782 nm one makes sense, the other less so…

Analyzing power is low, but not zero… A ~ 2.1% B ~ 0.2% C ~ 2.2%

Physics started Saturday, but poor transmission…

No more orbit shifts. Good transmission. Sunday, on-call Corrected orbit at 1I03/1I04 – transmission fully restored (good) Hall B1 picomotor to reach 30 nA – too far (spot move!)

Hall A 776 nm Hall B 655 nm Hall C 782 nm

QE vs. Time (yet), because… Daily charge plot app not working – Bickley will fix… StripTool “archiver feature” does not dump data… Archiver for gun current is running at 5 Hz (eek!) – too much data, too late… Hall B “spot move” New “starting line”

Efficiency numbers… BulkStrainedSuperlattice Max. P 35%75%85% QE* [%/mW] At Max. P 6%0.2%0.6% Sufficient “I” Experiments 12%56%72% Limited “I” Experiments 0.7%0.1%0.4%