February 17-18, 2010 R&D ERL David Pate R&D ERL Photocathode Deposition and Transport System David Pate February 17-18, 2010 Photocathode Deposition and.

Slides:



Advertisements
Similar presentations
Development of Bialkali Transfer Photocathodes for Large Area Micro- Channel Plate Based Photo Detectors 1 Argonne National Laboratory, Argonne, IL 2 University.
Advertisements

February 17-18, 2010 R&D ERL Andrew Burrill R&D ERL SRF Electron Gun Andrew Burrill February 17-18, 2010 SRF Electron Gun.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
1 “The Gatling Gun” A High Current Polarized Electron Gun System John Skaritka Collider-Accelerator Department Brookhaven National Laboratory.
Overview of Vacuum Systems Tejas Deshpande 24 July, 2014.
Progress and Plan for Superconducting RF Cavity RF Group.
K 2 CsSb Cathode Development John Smedley Triveni Rao Andrew Burrill BNL ERL needs – 50 mA, 7 mm dia., 1.3 mA/mm 2.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Rong Xiang I I Photocathodes for Rossendorf SRF gun Rong Xiang for HZDR SRF-gun team 1 st Topical Workshop on laser based particle.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
An Inductively Coupled Plasma Etcher
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
LAPPD Collaboration Meeting 12/10/2011 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley 20cm Sealed.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
PESP 2008 JLAB 1st-3rd Oct Photocathode Preparation System for the ALICE Photoinjector Keith Middleman Vacuum Science Group ASTeC, Daresbury UK.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
LAPPD Collaboration Review 12/9/2011 Ossy Siegmund, Sharon Jelinsky, Jason McPhate, Joe Tedesco Experimental Astrophysics Group, Space Sciences Laboratory,
500kV Gun development at KEK M. Yamamoto, Y. Honda, T. Miyajima, K. Sato, T. Muto, T. Uchiyama, Y. Saito, M. Kobayashi KEK R. Hajima, N. Nishimori, R.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Global Design Effort 1 Polarized electron source update Axel Brachmann, John Sheppard, Feng Zhou, Takashi Maruyama, -SLAC- Matt Poelker -Jlab- LCWS/ILC.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Outgassing Test and the Getter Specification
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Alkali-antimonide photocathodes using co-deposition and an effusion source Md Abdullah A. Mamun Carlos Hernandez-Garcia Matthew Poelker P3 Workshop : Photocathode.
Multialkali photocathode Luca Cultrera. Outline Motivations; State of the art; Alkali antimonides photocathodes; Growth UHV chamber; Load lock for photocathode.
COPPER PHOTOCATHODES DEVELOPMENTS AT ASTEC R. Valizadeh Accelerator Science and Technology Centre Science & Technology Facility Council, UK.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Photocathode R&D for bERLinPro
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
GaAs Photocathode Development
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Charlie Sinclair Cornell University (ret.)
Study of bialkali antimonide photocathode on NB substrate at Jlab
K2CsSb cathode tests at Jlab
Corial 200R 11/17/2018 Simplicity, performance, and upgradability in a system designed for R&D environments RIE capabilities over a variety of materials.
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Study of bialkali antimonide photocathode on NB substrate at Jlab
Easy-to-use Reactive Ion Etching equipment
Anisotropic RIE etching supported by a wide range of processes
Easy-to-use Reactive Ion Etching equipment
Status of Cathode System in FZR
Carlos Hernandez-Garcia Don Bullard February 2, 2017
Hydrogen and Ultra-High Vacuum
(WBS ) Alan Wootton, LLNL April 24, 2002
CRYOMODULE FINAL ASSEMBLY
BNL Photocathode R&D An overview of research on high quantum efficiency photocathodes and associated laser systems Andrew Burrill HPHB Workshop Nov 9,
Development of “green” photocathode at INFN LASA Sandeep Kumar Mohanty, D. Sertore, P. Michelato, L. Monaco, G. Guerini Rocco, C. Pagani EWPAA 2019, Switzerland,
Presentation transcript:

February 17-18, 2010 R&D ERL David Pate R&D ERL Photocathode Deposition and Transport System David Pate February 17-18, 2010 Photocathode Deposition and Transport System

February 17-18, 2010 R&D ERL David Pate Photocathode Deposition and Transport System 2

February 17-18, 2010 R&D ERL David Pate Outline Design criteria and principles Subsystems description Photos Status and overall schedule

February 17-18, 2010 R&D ERL David Pate Design Criteria and Principles Deposit CsK 2 Sb photocathodes on the end of a removable cathode stalk for use in our 704 MHz SRF injector. –Additional capabilities for manufacturing and testing cesium dispenser photocathodes being developed by University of Maryland. Install, remove, rejuvenate, & replace cathode without exposing source or cathode to atmosphere. Deposit Cs, K, & Sb on cathode tip surface at pressures in the to 10-9 Torr range. Heat cathode as high as 850ºC for cleaning and maintain 130ºC to 150 ºC during deposition. Remove & replace deposition sources without breaking deposition chamber vacuum. Be able to negotiate BNL ERL facility labyrinth. Provide capability for in-situ QE measurement.

February 17-18, 2010 R&D ERL David Pate Subsystems Description Deposition System Deposition sources for Cs, K, and Sb All-metal construction including gate valves-all bakeable to 250 o C 250 l/s ion pump with (2) NEGs, predictable base pressure torr range after bakeout Radiant heater for cathode tip cleaning

February 17-18, 2010 R&D ERL David Pate Subsystems Description Cont’d Deposition System Cont’d SAES alkali metal dispensers for Cs & K; heated baffled box for Sb Rough pumping by oil-free TMP Deposition process controlled by quartz crystal monitor Laser port and collector for QE measurement

February 17-18, 2010 R&D ERL David Pate Subsystems Description Cont’d Transport System Two vacuum crosses separated by long stroke bellows 200 l/s Ion pump on front cross; 40 l/s pump on rear cross (additional NEGs) All metal construction, all components bakeable to 250 o C (2) Dedicated transport carts for cathode assembly

February 17-18, 2010 R&D ERL David Pate Photo of Deposition and Transport System

February 17-18, 2010 R&D ERL David Pate Status and Overall Schedule Deposition System Deposition system delivery from AES All systems tested and modified where necessary Redesign K and Sb source arms completed Base pressure of 3.2 x torr established Awaiting source installation and C bake

February 17-18, 2010 R&D ERL David Pate Status and Overall Schedule-Continued Transport Cart-1&2 Delivery of both transport cart from AES Unable to obtain base vacuum pressure Both transport carts dissembled by BNL and AES Parts cleaned at AES, vacuum baked at BNL Ion pumps returned to GAMMA for rebuild Redesign of cathode flexible cooling lines and TCs Redesign of cathode stalk guide tube Order placed for addition of NEG pumps

February 17-18, 2010 R&D ERL David Pate Commissioning Plan The production of a cathode requires a transport cart tested and operational. We look forward to producing a cathode and testing the deposition system when a transport cart becomes available, which we anticipate will be first quarter 2010.

February 17-18, 2010 R&D ERL David Pate Operation Instructions Will be developed using an initial recipe for cathode production developed from the second generation deposition system The AES deposition system uses similar technology to the second generation deposition system