East – West Corridors RTA Southern Region April 2007.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Idaho/Canada Border Issues Transportation Border Working Group Meeting Coeur d’Alene, ID April 22-23, 2008.
Transport Challenges in Wellington Shire
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tim Pallas Minister for Roads and Ports National Local Government Asset Management Conference 13 May 2010.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
The Integrated Transport and Land Use Plan and Regional Mining and Infrastructure Planning Project Rod Hook Chief Executive Department of Planning, Transport.
13 June 2007 Securing the lifeblood of the NSW economy Presentation to the BTRE Transport Colloquium Presentation by Greg Martin Chief Executive Sydney.
Moving Freight in the Urban Environment – Looking Beyond the Dollar National Local Roads & Transport Congress 11 July 2006 Stuart St Clair Chief Executive.
High Productivity Vehicles Why has the take up been so slow? Damien Hense Freight Industry Liaison Manager ARRB Group.
Regional Transport Networks – What’s needed THIS IS TODAY IS THIS TOMORROW ?
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Page 1© QR 2007 All Rights Reserved Unlocking Australia’s Export Supply Chain Bottlenecks Stephen Cantwell Group Executive General Manager, QR Freight.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Transportation Planning Analysis UnitPNREC 2006 Transportation Modeling in Oregon: Overview of ODOT Statewide Integrated Model Pacific Northwest Regional.
Department of Infrastructure, Energy and Resources COTMA Conference August 08 Craig Hoey Rail Safety Unit.
Beyond Nerriga Route Options Study SEATS Meeting 7 November 2013 at Queanbeyan Image placeholder.
South East Australian Transport Strategy Inc. A Regional Perspective on Transport & Economic Development.
Compendium of Best Practices and Benefits of National Logistics Associations in Selected APEC Economies First Workshop, Oakes on Collins Melbourne, 5-7.
IRSC Vancouver 2013 Theme 1 - Components of a Robust Safety Management System Vancouver, Canada 8 October 2013 Vancouver, Canada 8 October 2013 Why is.
Transport Investing in Regions SEATS Meeting 17 February 2012.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Runways – 7 July Paul Harwood
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
Western Australian Regional Freight Transport Network Plan- Implementation Priorities Presentation to the Freight and Logistics Council Steve Beyer, Executive.
Carrying the Freight: The Trucking Industry Perspective 13 June 2007 Stuart St Clair Chief Executive Australian Trucking Association.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
The impact of traffic on the Catherine Hill Bay area.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Southern Bridge Project Brown County Executive
4. GEOMETRIC DESIGN OF HIGHWAYS
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
South East Truck Safety Committee. Truck Safety Committee members SEFE Forests NSW VicForests Pentarch RoadsVictoria NSW Roads and Traffic Authority WorkCover.
Population distribution of India. Index What is it? What is it? Where is it? Where is it? Regional Map Regional Map Statistics Statistics Population Distribution.
Click to edit Master title style Click to edit Master subtitle style BUREAU OF TRANSPORT & REGIONAL ECONOMICS-TRANSPORT COLLOQUIUM 05 Future Opportunities.
Melbourne Sydney Brisbane Wellington Johannesburg Cape Town Windhoek Australia’s Supply Chains – Innovate or Fail! 18 June 2008 Liesbet Spanjaard Director,
Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012.
8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002.
Road freight productivity – trends and prospects Jack McAuley, BTRE BTRE Transport Colloquium June 2007.
Maritime Saudi Arabia 2010 Agility Logistics.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
A-DOUBLE PRESENTATION Freight Council 31 March 2016.
Australian Road Federation November Meeting Our Transport Challenges (MOTC) Meeting Our Transport Challenges (MOTC) sets out a strategic, long term.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
TfN Freight AND RAIL UPDATE
Norman CTP Subcommittee Meeting #3 - Needs and Projects March 25, 2013
Australian Freight Railways for a New Century
Downtown Valdosta Truck Traffic Mitigation Study
Community Amenity Versus Economic Productivity
DFT Study: Future Potential for Modal Shift in the UK Rail Market
VicRoads – Movement & Place
Draft Transportation Element September 6, 2017
VicRoads – Movement & Place
Downtown Valdosta Truck Traffic Mitigation Study
East Coast Route Study November 2016 update.
Gippsland Regional Road Group
Southern Bridge Project Brown County Executive
KEYNOTE STAGE SPONSOR.
Manilla Low Level Crossing Project
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Lourens de Beer; Supervisor: Prof. C Venter
Presentation transcript:

East – West Corridors RTA Southern Region April 2007

SYDNEY Wollongong Nowra Batemans Bay Bega ACT VIC Southern Region North – South Corridors ›Three main North – South Corridors: »Princes Hwy »Hume Hwy »Federal & Monaro Hwys ›AUSLINK: »Princes Hwy NO – (SYDNEY TO GWNNEVILLE) »Hume Hwy YES – (SYDNEY TO MELBOURNE) »Federal Hwy YES – (SYDNEY TO ACT) »Monaro Hwy NO

The need for efficient East – West Corridors ›Limitations exist for freight on the Princes Highway »Sydney to Wollongong AUSLINK corridor (allowing HML / CML) extends only to Gwynneville & does not include the Princes Hwy »25m B-doubles can not legally utilise Princes Hwy between South Nowra & Bega (H4), gazetted as “general access” only ›Other main north – south routes are less restrictive »Hume & Federal Highways are AUSLINK corridors, with provision for HML / CML operation »Hume, Federal, & Monaro Highways are all gazetted to allow use by 25m B-doubles »The inland routes are therefore the preferable north – south corridors for freight ›Utilisation of north – south (Sydney – ACT – Melbourne) corridors from the Illawarra & the NSW south coast therefore requires access to safe & efficient east – west corridors

Southern Region East – West Corridors ›Four main regions of linkage: »Access to & from Wollongong »Access to & from Shellharbour / Shoalhaven »Access to & from Eurobodalla »Access to & from Bega Valley ›Each region has different characteristics presenting their own unique challenges: »Differing freight tasks »Differing topography »Differing availability of alternative routes »Differing regulatory constraints »Differing traffic mixes & road safety risks ›Most east – west corridors traverse an escarpment crossing Wollongong Shellharbour Kiama Nowra Batemans Bay Ulladulla Bega Eden Narooma Queanbeya n SYDNEY ACT Jindabyne VIC Bombala Cooma Goulburn Bowral Braidwood

East – West Access to & from Wollongong ›DEMAND: »Coal & steel industry, and Port Kembla port »Major urban expansion at West Dapto »Proximity to Sydney ›SUPPLY: ›Two inland east – west routes: »MR177 Appin Rd »MR95 Picton Rd ›Two coastal escarpment crossings: »Mt Ousley »Bulli Pass MR95 Picton Rd MR177 Appin Rd Wollongong Port Kembla Bulli Helensburgh Mt Ousley Appin Wilton West Dapto

Inland East – West Routes MR95 Picton Rd ›MR95 Picton Road »Currently carries approx. 14,000 veh/day with 20% heavy vehicles »High incidence of crashes due to limited overtaking opportunities & high mix of heavy vehicles »At present this route appears to be the preferred freight connection between the Illawarra / Port Kembla & Sydney / HW2 Hume Hwy / M7 Sydney Orbital »Freight volumes are expected to increase as the Port Kembla port expands – 2008 onwards »The traffic mix on MR95 needs to be monitored & managed given the high percentage of freight & increasing residential development (Macarthur area – Wilton) ›Potential »While not an AUSLINK corridor, there are provisions in the 2004 White Paper for MR95 to be considered as a “transport link of regional significance” »This could see MR95 carrying HML / CML freight in the near future »Funding may become available to provide infrastructure upgrades: Short term – additional overtaking lanes Long term – upgrade to two lanes in each direction

Inland East – West Routes MR177 Appin Rd ›MR177 Appin Road »Currently carries approx. 11,000 veh/day with 14% heavy vehicles »The route has attracted attention in the past due to high crash rates »Together with MR95, this route serves as a freight connection between the Illawarra / Port Kembla & SW Sydney / Campbelltown »Traffic mix on MR177 needs to be monitored & managed given the high percentage of freight (Port Kembla & collieries) & increasing residential development (Macarthur area – Appin) ›Potential »The route could replace MR95 as the preferred freight connection to the Hume Hwy / SW Sydney if Appin were to be bypassed & improved connectivity provided to the Hume Hwy »While not an AUSLINK corridor, there are provisions in the 2004 White Paper for MR177 to be considered as a “transport link of regional significance” »This could see MR177 carrying HML / CML freight in the near future »Funding may become available to provide infrastructure upgrades: Short term – additional overtaking lanes Long term – two lanes in each direction, possible Appin bypass & link to Hume Hwy

Illawarra Escarpment Crossings MR95 Mt Ousley ›MR95 Mt Ousley »Catering for approximately 40,000 veh/day, this is the main escarpment crossing in the Illawarra & is part of the AUSLINK network »Extensive de-watering systems constantly monitor & manage potential slip issues »Little practical scope to provide more lanes ~ what we have is what we’ve got »Any strategies to manage future traffic on Mt Ousley need to incorporate planning at other escarpment crossings (Bulli Pass) ›Potential »Given its AUSLINK status, the route is likely to be utilised for HML / CML »Short term - funding may become available to investigate region wide escarpment crossing strategies »Long term - possibility of upgrade to Old Mt Ousley Rd junction at base of Mt Ousley

Illawarra Escarpment Crossings HW1 Bulli Pass ›HW1 Bulli Pass »Currently carries approx. 12,000 veh/day »The route is gazetted ‘general access’ only ~ no access to 25m B-Doubles »Provides link between northern suburbs of Illawarra & Sydney via Southern Fwy & Appin Rd »Improvements to the Northern Distributor likely to increase pressure on Bulli Pass as an alternative to Mt Ousley ›Potential »In the event of upgrades to MR177 (two lanes each direction, Appin bypass, improved linkage to Hume Hwy), Bulli Pass would become a network constraint adjacent the upgraded Northern Distributor »Pressure on the capacity of Mt Ousley may attract attention to Bulli Pass as an alternative »Short term - funding may become available to investigate region wide escarpment crossing strategies »Long term - a corridor has been reserved for a possible new Bulli Pass alignment - current freight restrictions may not apply if a new alignment were to proceed

East – West Access to & from Shellharbour / Shoalhaven ›DEMAND: »Local industry (dairy) & quarries »Growth at West Dapto & Nowra »Connectivity to Hume Highway ›SUPPLY: ›Three inland east – west routes: »HW25 Illawarra Hwy »MR264 Jamberoo Mountain Rd »MR261 Nowra to Bowral Kiama Shellharbour Moss Vale Bowral Mittagong Kangaroo Valley Nowra Berry Robertson Wollongong West Dapto HW25 Illawarra Hwy MR261 Nowra to Bowral MR264 Jamberoo Mtn Rd

Inland East – West Routes HW25 Illawarra Hwy ›HW25 Illawarra Highway »Currently carries approx. 3,000 veh/day with 7% heavy vehicles »Escarpment crossing at Macquarie Pass impedes freight access & observes high crash rates »Route is gazetted ‘general access’ only, however this does not restrict use by 19m B- doubles < 50T, semi trailers, or buses »Use of Macquarie Pass by such vehicles is undesirable, however can not be regulated due to road classification »The expansion of Port Kembla & increasing proposals for ‘inland ports’ in the Southern Highlands is expected to increase desire for use of the route by heavy vehicles ›Potential »Alternative escarpment crossings at Macquarie Pass are impractical »Any strategies to manage future traffic on Macquarie Pass need to incorporate planning at other escarpment crossings »Discouraging future freight use on Macquarie Pass without the ability to regulate beyond ‘general access’ will be a challenge

Inland East – West Routes MR261 Nowra to Bowral ›MR261 Nowra to Bowral »Currently carries approx. 3,000 veh/day with 6% heavy vehicles »Route is gazetted ‘general access’ only »Two escarpment crossings – Cambewarra Mountain & Barrengarry Mountain »42.5T load limit exists for Hampden Bridge (Kangaroo Valley) »Nowra is one of the fastest growing centres in NSW, increasing pressure on this route »Increasing complaints by the public over the use of the route by heavy vehicles ›Potential »Heavy vehicle accessibility on the escarpment crossings could be reviewed, however there are few plans for potential upgrades at this stage

Inland East – West Routes MR264 Jamberoo Mountain Rd ›MR264 Jamberoo Mountain Road »Currently carries approx. 4,000 veh/day with 4% heavy vehicles, with only 1,000 veh/day traversing the escarpment crossing »25m B-doubles permitted only between Robertson & Kangaroo Creek (above escarpment) »Escarpment crossing is extremely narrow & winding ~ less accessible than Macquarie Pass »Mainly recreational traffic ›Potential »Heavy vehicle accessibility on the escarpment crossing is extremely limited, however there is little demand for improvement

East – West Access to & from Eurobodalla ›DEMAND: »Queanbeyan & Nowra high growth areas »HQJOC »Limited alternative routes »Recreational trips ›SUPPLY: ›Two inland east – west routes: »Main Road 92 »MR51 Kings Hwy Queanbeya n Braidwood Captains Flat Bungendore Ulladulla Batemans Bay Nowra MR51 Kings Hwy Main Road 92

Inland East – West Routes MR51 Kings Hwy ›MR51 Kings Highway »Currently carries approx. 4,000 veh/day with 6% heavy vehicles »Escarpment crossing at Clyde Mountain impedes freight access & observes high crash rates »‘General access’ between Batemans Bay & Braidwood (incl. Clyde Mountain) »Gazetted for 25m B-doubles between Braidwood & Queanbeyan »Limited availability of alternate east – west routes, therefore only practical route for freight, commuters, & recreational traffic (ACT to Batemans Bay / coast) »Dept of Defence HQJOC currently under construction will increase pressure on capacity between Bungendore & the ACT / Queanbeyan »Main Road 92 will increase heavy vehicle traffic ›Potential »The corridor was one of several CPoM ‘pilot’ studies undertaken across NSW »Strategic outcomes from pilot study are under review using latest available data & software »Potential projects include provision of overtaking lanes, junction & road safety treatments »Consideration could be given to uncoupling bays to assist accessibility across Clyde Mountain

Inland East – West Routes Main Road 92 ›Main Road 92 »The route will form a connection between Nowra & the ACT / Queanbeyan, two of the fastest growing regional centres in NSW »Currently undergoing enhancement to improve accessibility ›Potential »The route will be monitored to gauge its effect on MR51 & the Princes Hwy at Nowra

East – West Access to & from Bega Valley ›DEMAND: »Timber, fishing, & local industries (dairy) »Access to forestry areas ›SUPPLY: ›Three inland east – west routes: »HW4 Snowy Mountains Hwy »MR91 Pambula to Bombala »Imlay Rd (Forestry controlled) HW4 Snowy Mtns Hwy Imlay Rd MR91 Pambula to Bombala Bega Eden Bombala Cooma Bermagui Pambula

Inland East – West Routes HW4 Snowy Mountains Hwy ›HW4 Snowy Mountains Highway »Currently carries approx. 2,000 veh/day with 12% heavy vehicles »Escarpment crossing at Brown Mountain impedes freight access & observes high crash rates »Brown Mtn gazetted for 19m B-Double CML (55T) »Access by 25m B-doubles is restricted, with uncoupling bays provided either side of Brown Mountain »B-double accessibility on HW4 west of Monaro Hwy (Cooma) restricted to ‘general access’ ›Potential »There is no short term likelihood of upgrading HW4 west of Monaro Hwy to 25m B- double status given length of road requiring upgrade & a number of bridges that would need to be replaced »Brown Mountain uncoupling bays are believed to be a satisfactory solution to improving access across Brown Mountain (& a similar solution could be considered for MR51 at Clyde Mountain)

Inland East – West Routes MR91 & Imlay Rd ›MR91 Pambula to Bombala »Currently carries approx. 1,500 veh/day (less in regional areas) with 8% heavy vehicles »25m B-doubles are gazetted to the west near Monaro Hwy, but restrictions exist elsewhere »Potential – the restricted sections are not deemed suitable for heavy vehicles ›Imlay Road »The route mainly services forestry vehicles travelling between the industry on the coast & Bombala »Approx. 300 veh/day, carrying 450,000 to 500,000 Tonnes/yr »Equates to an estimated figure of approx. 15% heavy vehicles »Potential – Imlay Rd is a Forestry controlled road

Summary of Challenges ›Escarpment crossings are prevalent on all east – west routes »Road safety, traffic efficiency, & freight accessibility on all escarpment crossings »Limits to potential for upgrades on Mt Ousley mean other escarpment crossings such as Bulli Pass may need to be upgraded »Uncoupling bay strategy (similar to Brown Mtn) could be a solution to improving accessibility on Kings Hwy (Clyde Mtn) ›Increasing industry & expansion of Port Kembla consume spare capacity »Additional overtaking lanes could be considered for routes such as Kings Hwy, and Picton & Appin Rds »Alternative to Mt Ousley could be an upgrade to Bulli Pass »Timber logging routes need to be managed ›Industrial development places pressure for freight on unsuitable routes »Macquarie Pass

Summary of Challenges ›AUSLINK & selected routes will allow HML / CML »Bridge & pavement maintenance concerns on all routes ›Network upgrades attract freight to deficient links »Bulli Pass (in the event of Northern Distributor & Appin Rd upgrades) »Kings Hwy (due to Main Road 92) ›High growth areas increase freight on existing routes »Sydney, Port Kembla – Mt Ousley, Bulli Pass, Picton & Appin Rds »ACT / Queanbeyan, Nowra – Kings Hwy & Main Road 92