1Copyright © Xstrata plc Tensionable Tendons Phil Howes Tahmoor Colliery.

Slides:



Advertisements
Similar presentations
Hand tools injury prevention
Advertisements

Peter Zhang, Senior Geotechnical Engineer Scott Wade, Senior Geologist
Self Drilling Rock Bolt System for the Coal Industry Ground Support Services Pty Ltd & Alminco Pty Ltd March 2008.
ACARP Roadway Development Operators Workshops - October 2011
AUSTAR COAL MINE A2 MAINGATE ROADWAY DEVELOPMENT Experiences and Lessons Learned Presenter Glenn Sobey Development Mining Engineer Austar Coal Mine.
Stanley DS11 Diamond Saw.
General Information  Mine Started on :  Extractable reserves: 17.5 MT  Mine leasehold area: 4.6 Sq. Km  Workable seams ==>1. Queen Seam (thickness.
Subpart R Steel Erection
Research Update Automated Bolting and Meshing Project - C17018.
Self Drilling Rock Bolt Technology for the Coal Industry Advanced Solutions Ground Support Services Pty Ltd September 2007.
1 Metallurgical Coal EXPERIENCES FROM THE USE OF IN CYCLE TENDON SUPPORT Richard Campbell Principal Geotechnical Engineer Blackrock Mining Solutions.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
ACARP – Roadway Development 11, 13, 21 September 2007
Road Traffic Accident Procedures (2) Service Delivery 2.
Development Taskforce Presentation
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
OVERVIEW OF ROUND TABLE COMMENTS Mine Roof Safety Seminar.
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Dr Chris Harvey.  First reported outburst: Metropolitan Colliery; 30 th September 1895  First fatal outburst: Metropolitan Colliery; 10 th June 1896.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
OUTBURST SEMINAR Work Force Perspective Management of Outburst Potential Southern District.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Development & Implementation of Strata Control Practices
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
ACARP Roadway Development - Operators Workshop March 2008
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Underground Operations Safe Production through Teamwork Standards and Urgency 1 Crew Management Newlands Northern Underground  Welcome  Glen Donnellan.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Fall Protection.
OMCSA Innovation Award Entry March 2012 “THE RERAILER BAR”
1 Falls Module 2. 2Objectives After this module you should be able to – identify the most common fall hazards – take the steps necessary to avoid those.
MNM Fatal Fall of Roof Accident Fall of Roof Accident April 15, 2011 (Idaho) April 15, 2011 (Idaho) Underground Silver Operation Underground Silver.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
-Kazem Oraee (Prof) - Arash Goodarzi (Eng) - Nikzad Oraee-Mirzamani (Phd) -Parham Khajehpour (Eng) 34th International Conference on Ground Control in Mining.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Nearmiss Presentation
ANCHORAGE. Critical Parameters Bolt Type Strength –Grade –Diameter LengthLength Density (spacing)Density (spacing) PlatesPlates.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
1 Beltana Development. 2 Beltana Overview Process Control Continuous Improvement Summary.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Slim Borehole Scanner (SBS) An Update
Russell Thomas Gas Drainage Coordinator – Appin Colliery November 2014
Experience with Mining through Surface to Seam Large Diameter Boreholes. 26/11/14 Scott Dennis – Appin Mine.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
Grunching Through Potential Outburst Zones Jack Borg – Tahmoor Underground Colliery.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Innovation Intelligence ® SimLab – Show Adjacent.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Unit 4 Lesson 8 Earthquakes Copyright © Houghton Mifflin Harcourt Publishing Company.
Remote Reading Tell-tale Systems in Underground Mines Chris Wagner Strata Engineering (Australia) Pty Ltd.
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
Roofing fall protection
AAC Monthly Report RA-UG Mine September 2016
DEVELOPMENT AND DEPILLARING WITH CONTINUOUS MINER
Challenging Geotechnical Doctrine with Datalogged Instrumentation
Tool removed during cycle Fault #2
Optimisation of LW Installation Road Support Plans
Contents Introduction Identification of the knowledge gap
North Goonyella Mine Longwall Health, 8th June 2017
ACARP Roadway Development Operators Workshops October 2011
Presentation transcript:

1Copyright © Xstrata plc Tensionable Tendons Phil Howes Tahmoor Colliery

2Copyright © Xstrata plc Tahmoor Colliery  Tahmoor colliery is located approx. 30 minutes west of Wollongong.  Mines hard coking coal from the Bulli seam.  Is approx. 450m below the surface.  Average seam height is 2m.  Mining height at the face is 2.7m.  Floor is taken to achieve the required mining height.  Mains & gate road panels suffer extensive floor heave which must be brushed with the CM to regain the 2.7m originally cut prior to the panel advance.  Normal roof support is 1.1m mesh modules & 8 x 2.1 X grade fully encapsulated roof bolts per metre.  4.1 tendons fully encapsulated with chemical resins installed as required.  8m or 10m Mega Bolts fully encapsulated installed outbye as required.

3Copyright © Xstrata plc WHERE IT ALL BEGAN  Brimstone No1 colliery November 1970  Early strata monitoring systems: Props Wooden Wedges Strata sounding Worker awareness (experience)  Strata control: Props Cut poor roof down with CM Half round wooden slabs

4Copyright © Xstrata plc Displacement monitoring  Above monitoring will not replace the traditional awareness of colliery workers & officials, who are still required to observe for, & respond to, changing ground conditions.  Installed every intersection.  Installed half way along every heading. Gates & Mains  Installed half way along every cut through.

5Copyright © Xstrata plc Strata TARP

6Copyright © Xstrata plc Strata TARP Triggers (Face Area) 1.GREEN Level 1 Normal mining (8 x 2.1m bolts per metre) 2.YELLOW Level 2 (8 x 2.1m bolts per metre & 2 x 4.1m tendons each 2m)  Slabbing greater than 200mm to less than 400mm for more than 3m  Minor guttering less than/equal to 100mm.  Minor roof buckles less than/equal to 100mm.  Minor geological structure. Zone of jointing.  Less than 2 bedding separation partings (each less than/equal 100mm) in roof bolt drill hole.  Local road widening for nitch (less than 5.5m).  Pillar split, gas drainage stubs into L/w block.  Minor rib spall associated with geological feature.

7Copyright © Xstrata plc Strata TARP Response  Localised deterioration in conditions, increase support to yellow support pattern.  Install a Tell Tale at the start of the support pattern change/geological.  Control miner guttering with 2.1m spot bolts.  Install additional rib bolts & mesh across geological structure. Pre-existing Tell tales (outbye face)  Total (T) anchor movement greater than 30mm but not exceeding 50mm.  Response in the hazardous zone: Monitor & record readings once/shift where more than 3 consecutive linear rates of displacement are greater than 0 and/or 2 consecutive accelerating rates of displacement.

8Copyright © Xstrata plc Trigger Reverse  Improved conditions go to green.  Authorised by development Superintendant & undermanager or mine manager or Geotechnical Engineer. Triggers (Face Area) 3. Orange Level 3 (8 x 2.1m bolts per metre & 2 x 4.1m tendons per metre). 4. Red Level 4 (8 x 2.1m bolts per metre & 4 x 4.1m tendons per metre). If Total anchor (T) more than 100mm STOP MINING. Secondary support to be installed (8m mega bolts) Strata TARP

9Copyright © Xstrata plc  This type of tendon had been used at Tahmoor for many years.  Was successfully used at the face in conjunction with the primary.  Fully encapsulated using 1000mm plus 800mm chemical resins.  Quick to install.  Able to pre-tension tendon to 10 – 27 tonnes. 4.1m Tendons tensioned with hydraulic tensioner

10Copyright © Xstrata plc EQUIPMENT DAMAGE  Operators rough handling of the hydraulic tensioner.  Not keeping equipment clean & serviceable.  Failure to safely store the tensioner hoses between usage.  Failure to periodically inspect equipment for damage so repair/replacement can be enacted.  All of the above will lead to production loss & has the potential to cause injury to operators.

11Copyright © Xstrata plc OH&S ISSUES  Hydraulic tensioner heavy & difficult to lift above the operators head causing strain injuries to operator.  Potential for tensioner to fall or be forced under pressure from the tendon tail injuring operator.  Tensioner hydraulic hoses with operating pressures up to 10,000psi at operator head height with the potential to cause fluid injection injuries.

12Copyright © Xstrata plc Tendon that can be tensioned with the CM bolting rig  In 2008 ResCo approached me about trailing a fully encapsulated 4.1m tendon (Ultrabolt) that can be installed & tensioned by the miner bolting rig. The cable is tensioned with a dolly spanner by the bolting rig motor.  I was keen to trial this new innovation as we were having ongoing issues with equipment failure & OH & S issues using the 4.1m barrel & wedge tendons that required a hydraulic tensioner.

13Copyright © Xstrata plc Hilti Ultra X Strand

14Copyright © Xstrata plc Tendon Installation Tools and Practices

15Copyright © Xstrata plc Redesigned reamer

16Copyright © Xstrata plc Why use Tendons that can be tensioned with the CM bolting rig  There are four good reasons: 1.OH & S friendly 2.Quick to install 3.Cost effective 4.Increased productivity  a

17Copyright © Xstrata plc How Tahmoor Utilises 4.1m Tendons  The primary use of 4.1m tendons at Tahmoor is to install tendons at the face as soon a TARP is triggered. This is a temporary measure to allow us to complete the current drivage. When we no longer wheel through the above area contractors then move in & install 8m mega bolts to a pattern determined by our geotech team.  The secondary use is to install tendons at the face in areas that have been identified by our geotech team as having the potential to fail soon after we have mined through the area. This slows the strata movement until mega bolts can be installed when S/C wheeling through the area is no longer required.