A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004.

Slides:



Advertisements
Similar presentations
Short Service Worker Program
Advertisements

Will Minter Division Director, Asset Management & Small Business Programs Office November 15, 2006 ITER Project.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
Agency Risk Management and Internal Control Standards Presentation to the Board of Visitors November 14, 2014.
QUALITY ASSURANCE AND IMPROVEMENT PROGRAM (QAIP)
ORP Incorporating Human Performance Improvement Tools into DOE Processes Shirley J. Olinger, Deputy Manager, ORP Brian Harkins, ORP Facility Representative.
What’s New in the FDA’s Pharmaceutical Inspectorate and Risk Based Systems Inspection Rick Perlman Chair Food, Drug, and Cosmetic Division ASQ.
1 Introduction to Workforce Planning and Development in State of Alaska Executive Branch Departments.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
External Quality Assessments
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
OH&S Management System
Internal Auditing and Outsourcing
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Sustainable Design An Overview of the Sustainability Efforts at Oak Ridge National Laboratory.
Oak Ridge National Laboratory: “The Lab of the South” Building a Regional Virtual Laboratory  Geographic Focus  Operating Philosophy  Initial Projects.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
Copyright 2010, The World Bank Group. All Rights Reserved. Training and Procedural Manuals Section A 1.
An Educational Computer Based Training Program CBTCBT.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Authorization and Inspection of Cyclotron Facilities Inspections.
EFFECTIVENESS OF TRAINING Group 5. Effectiveness of Training  What is “effectiveness of training”? Effectiveness means producing an intended result.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Making Zero Field Rework A Reality Workshop
Networking and Computing Technologies Division Becky Verastegui December 6, 2004 RAMS Workshop.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Work-Specific Hazard Checklist (WSHC) May 20, 2013 Mark Berkheimer, CHMM ORAU EH&S Specialist 3/Chemical Hygiene Officer 1.
Oak Ridge Regional Emergency Management Forum David Milan Manager, Emergency Preparedness Department Pollard Auditorium October 26, 2006 Oak Ridge National.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Assuring Safety for Clinical Techniques and Procedures MODULE 5 Facilitative Supervision for Quality Improvement Curriculum 2008.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
DOE-RL Safety Oversight Planning – Documenting - Reporting Rob Hastings, Director Mat Irwin, Team Lead Operations Oversight Division ISM Best Practices.
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
Bob Cochran Chair, EFCOG Energy Facility Contractors Group Achieving Excellence in Management and Operations.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Strength Through Science BESAC Presentation Office of Science Dr. James Decker Acting Director, Office of Science U.S. Department of Energy August 2, 2001.
ISM at the Savannah River Site
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Implementation of ISM within a R&D User Facility Mark Engelhard W.R. Wiley Environmental & Molecular Sciences Laboratory.
OCLC Online Computer Library Center 1 Introduction.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Survey Results – “Raising Visibility and Awareness of Environmental Programs at DOE Facilities”
OH&S Management System
Training Course on Integrated Management System for Regulatory Body
Identify the Risk of Not Doing BA
Readiness Review Course
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
OH&S Management System
Competency Based Learning and Development
Employee Training & Development
How to build your Integrated
Ian Evans SSRL Safety Office
Internal Audit Who? What? When? How? Why? In brief . . .
Presentation transcript:

A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Title_date DOE OA-40 DOE Office of Independent Oversight and Performance Assurance Integrated Safety Management (ISM) System Evaluation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Title_date ORNL Profile  Conduct basic and applied research that provides innovative solutions to complex problems  3800 staff members  Scientific competencies include  Neutron Science  Energy  High Performance Computing  Complex Biological Systems  Advanced Materials  National Security

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Title_date Facilities and Operations Profile  Provides facilities and operating services to support research and development  930 total employees (527 bargaining unit)  Employee types:  Managers  Administrative staff  Engineers  Technicians  Bargaining Unit – Pipefitters, Carpenters, Laborers, Janitors, Painters, Millwrights, etc.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Title_date Facilities and Operations Directorate Chief Engineer Matrix Support F&O Director Reservation Manager Craft Resources Division Fabrication Division Facilities Management Division Facilities Development Division Laboratory Protection Division Logistical Services Division Nonreactor Nuclear Facilities Division Integrated Operations Support Division Facilities Strategic Planning

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Title_date The Request Take the lead in preparing the entire organization for the evaluation and help ensure that the group doesn’t look bad.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Title_date Initial Preparation Thought Mimic upcoming audit Obtain Lines of Inquiry Conduct series of self-assessments Submit a Final Report of findings Schedule/Track corrective actions

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Title_date Field interviews Often unescorted Unannounced interviews with ANY staff member Interviews focused on ISM on the tasked being conducted Not much time spent on procedure reviews The OA-40 audit method

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 Title_date The Problem How do you ensure that 930 employees of different job types understand, and can articulate, how ISM controls are implemented for any job task that they conduct? Training in ISM and work control has already occurred In less than 5 months Minimal disruption of productive time

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 Title_date The Challenge Find an efficient method to simultaneously Assess worker knowledge of actual hazards and hazard controls for the tasks they perform Correct any worker misunderstandings Educate worker on the “how” and the “why” controls are in place

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 Title_date The Solution Mimic the approach to be used by the upcoming evaluation by conducting field interviews of workers to ASSESS worker knowledge And for readiness… CORRECT any misunderstandings and EDUCATE workers on hazard controls The ACE Concept

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 Title_date To deploy our ACE concept, we  Developed a tool to guide the assessment  Conducted orientation sessions to acquaint managers with the procedure  Programmed a database to capture results  Created a performance metric to illustrate areas of opportunity

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 Title_date To develop the tool, we obtained questions from  Other site’s escorts  Our staff members who were previous OA-40 auditors  An analysis of our internal controls  Previous OA-40 reports

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 Title_date Our ACE Card

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 Title_date ACE Procedure  Be acquainted with questions on checklist  Set aside time to conduct field assessment  Select worker, unannounced, while conducting work  Enter into a non-threatening, two way dialog guided by the questions

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 Title_date ACE Procedure (con’t)  Immediately correct wrong responses  Educate worker on the reasons for controls  Thank worker and encourage worker to continue safe performance  Complete online ACE Card

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 17 Title_date ACE Results  Performance metric  Ad Hoc Reports  Corrective Actions

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 18 Title_date OA-40 Feedback Quote from OA-40 final report

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 19 Title_date ACE Concept Benefits  Adapts to different areas  Demonstrates management presence in field  Promotes worker feedback  Assesses actual worker knowledge  Allows trending of opportunities for improvement  Provides a quick, effective self assessment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 20 Title_date