Eating the Elephant: Stormwater Management for Boone County Georganne Bowman, Stormwater Coordinator – Boone County, MO ----- Christina Luebbert, P.E.,

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
Future of the Construction and Post Construction Water Quality Program
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Integrating LID Into the Development Planning Process.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Energy PUBLIC Running Water: Effective Stormwater Quality Practices Tracy Warner, Municipal Engineer for Ames, IA Josh Shields, Landscape Architect with.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to MS4 Stormwater Requirements (2009)
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
City of Clarksville Storm Water Management Manual Revisions 2014.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Municipal Separate Storm Sewer System (MS4) Permit
Supervisor, RIDEM RIPDES Permitting Program
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Sacramento County Stormwater Quality Program
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Eating the Elephant: Stormwater Management for Boone County Georganne Bowman, Stormwater Coordinator – Boone County, MO Christina Luebbert, P.E., CFM, Project Manager – Shafer, Kline and Warren, Inc.

One Bite at a Time… 1.Build a comprehensive stormwater program for the County 2.Fix the internal processes 3.Develop regulations that encourage stormwater management flexibility and growth

Community Direction  Obstacles – Political Climate  Buffer Regulations  City of Columbia ordinance/manual  Hinkson Creek TMDL – Internal Changes  Legal staff, management, new staff  Minimal standards/codes buried in Road & Zoning Regulations

Community Direction  The good news… –Hinkson Creek project  TMDL development –Additional monitoring – UMC –Partnering efforts with the City and UMC –Stormwater Task Force suggestions  Protection for homeowners from flooding  Stream Buffer protection

Comprehensive Program Common sense approach to compliance Common sense approach to compliance –Fix what needs to be fixed –Do not implement programs just to satisfy the permit

Comprehensive Program  Develop a long-range plan & set priorities  Develop a comprehensive program for each MCM

Comprehensive Program  5-year plans –IDDE  Select the small handful of politically “HOT” chemicals.  Collect some data.  Tell a story about the hot topics.  Bring attention to the IDDE program.  Get more $ next year to do more good stuff, and broaden scope.

Comprehensive Program MCM 3 – Illicit Discharge Detection and Elimination Goal: Develop a program to reduce illegal connections and discharges to the County system   Develop an ordinance   Conduct a Storm Sewer Assessment (priority)   Develop/conduct monitoring   Enforcement   Program review and modification

Comprehensive Program  5-year plans –Construction  Early plan review and issues meetings  Develop guidance  Train inspectors  Track recommendations and changes  Incremental enforcement

Comprehensive Program MCM 4 – Construction Site Stormwater Runoff Control Goal: Develop a meaningful program that meets the intent and requirements of the permit by reducing erosion and sediment from construction sites.   Development ordinance, and guidance manual   Provide construction site oversight, and plan review   Develop a training program   Enforcement   Program review and modification

One Bite at a Time… 1.Build a comprehensive stormwater program for the County 2.Fix the internal processes 3.Develop regulations that encourage stormwater management flexibility and growth

Broken Processes Plan Review Process Improvements Problems identified Problems identified  Cohesion with PZ and PW  Consistent message to design community  Standardize –Getting everyone on the same page

Concept Review More information up front  Work with developers/engineers earlier in process  Identify environmental issues prior to design dollars being spent –Buffer regulations –Karst/sinkhole areas

One Bite at a Time… 1.Build a comprehensive stormwater program for the County 2.Fix the internal processes 3.Develop regulations that encourage stormwater management flexibility and growth

Ordinances Legal Authority  Started with a basic framework –IDDE, Construction, some Post-Construction  Worked with the new County attorney –Reviewed the County authority –Class 1 counties are different from cities

Ordinances Borrowed Resources  CWP post-construction model ordinance  Karst protection from Springfield  Other programs –Tree preservation – King County –Background – Iowa, Wisconsin, Georgia, etc

Design Guidance  Opposing objectives – –Consistent with City of Columbia’s manual –But customized for County style development –Feedback from Development community  issues with City manual –Value rating system –Redevelopment

Design Guidance Stakeholder process  Engineering community  Previous Stormwater Task Force members  Developers  Staff at Planning and Zoning and Public Works

Design Guidance Stakeholder process… Positives:  Early involvement from engineering firms  Open discussion to work out bugs  Expose commission to language Negatives:  Tangents/agendas from stakeholders  Minimal direction/guidance from commission

Design Guidance External Review… Two local engineering firms have agreed to review the ordinance and design guidance for cost differences. Two local engineering firms have agreed to review the ordinance and design guidance for cost differences.Objectives: The current Boone County design standards, The proposed Boone County Stormwater Manual, and The current City of Columbia Stormwater manual.

Stormwater Management Nested Stormwater Approach –Runoff Reduction –Water Quality Volume Treatment –Channel Protection –Flood Control Safety Net

Stormwater Management

Runoff Reduction To replicate pre-development hydrologic conditions, and to promote baseflow, 10% of the water quality volume shall be permanently reduced. –by disconnecting impervious areas, –maintaining sheet flow –infiltration practices where soils conditions allow and/or –collection and reuse of runoff.

Water Quality Volume To protect the receiving waters from NPS, the remainder of the water quality volume that was not removed through runoff reduction, shall be treated through filtration BMPs.

Channel Protection The stormwater system shall be designed so that post-development discharges will not erode natural channels or steep slopes. The stormwater system shall be designed so that post-development discharges will not erode natural channels or steep slopes. Tier 1 less than 5 acres of land disturbance OR less than 20% imperviousness Tier 2 Sites greater than 5 acres of land disturbance OR greater than 20% imperviousness

Channel Protection Tier 1  maintain sheet flow  Use energy dissipaters and level spreaders  Conveyances designed to reduce velocity  Concentrated flows discharged at an elevation that will not cause erosion or require discharge across any constructed slope or natural steep slopes.  Outfall velocities must be non-erosive from the point of discharge to the receiving channel or waterbody where the discharge point is calculated

Channel Protection Tier 2  Site design techniques that decrease runoff volumes and peak flows. This shall be accomplished by controlling the post- development peak discharge rate to the pre- development rate. This criterion shall be met for the 5-year, 24-hour storm event, (or equivalent storm runoff volume using other methodologies).

Flood Control  This criterion shall be met for the 10- year, 24-hour storm event on residentially zoned properties and the 25-year, 24 hour storm event on non- residentially zoned properties.  Stormwater BMPs shall safely pass the 100-year storm without creating damaging conditions downstream.

Redevelopment Land development that qualifies as redevelopment shall meet one of the following criteria:  Reduce Impervious Cover (20%)  Provide Treatment (20% & 100%)  Apply Innovative Approaches  Provide Off-Site Treatment  Address Downstream Issues  Combination of Measures

Conclusion Boone County is currently developing a comprehensive ordinance and guidance  Consider the political and community values  Trying untested approaches, and  Encourage flexibility

For more information: and follow the links to Stormwater Georganne Bowman, Boone County Public Works Christina Luebbert, P.E., CFM – SKW