1. PHILIPPINE POWER RATES: ASIA’S HIGHEST PHILIPPINES US$0.2460/kWh Japan US$0.243/kWh Singapore US$0.22/kWh Indonesia US$.092/kWh.
Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
Achievable Power Cost Reduction in the NCR and Calabarzon Areas Matuwid na Singil sa Kuryente Consumer Alliance Inc. MSK 8 October 2014 Presented by: David.
Amendment 3/5 Workshop.
1.  Philippine Independent Power Producers Association, Inc. (PIPPA) o An association composed of 28 independent power producers supplying more than.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
RENEWABLE ENERGY HAS BEACHED IN BARBADOS INTEGRATING A HIGH SHARE OF RENEWABLE GENERATION IN THE BARBADOS GRID WILLIAM HINDS CHIEF ENERGY CONSERVATION.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Barriers to Developing Small Scale Hydropower in the Philippines A Presentation for the Climate Change Information Center Dec. 10, 2002.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
SOLAR RENTING (PTY) LTD WHY SHOULD A CUSTOMER BUY SOLAR, IF HE CAN RENT? THEY CAN RATHER USE THEIR MONEY TO MAKE MONEY!
POLICIES AND PROGRAMS ON RENEWABLE ENERGY Prospects for Small Scale Clean Development Mechanism Department of Energy.
Renewable Energy Sector
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
Electricity in the Philippines: Concentration, not Competition by Maitet Diokno-Pascual Presented at the ACF-FES Conference on “ENERGY SECURITY: Reshaping.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT.
The Privatization of Essential Services in Asia and the experience of Power Privatization in the Philippines.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
MSK Petition for Rule Change on Contracting for Bilateral Contracts For ERC To Pass a Resolution Mandating that the Bilateral Contracts for Power Supply.
a market structure in which there is only one seller of a good or service that has no close substitutes and entry to the market is completely blocked.
GROUP 2 Facilitator: Prof. Harry Francisco Reporter: Prof. Emerita Fuente.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
NAGKAISA! Laban sa EPIRA Wilson M. Fortaleza Training/Workshop September 24, 2012 ALU Mariners’ Court, Cebu City.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Community Choice Energy as a Community Development Strategy for Oakland March 30, 2010.
Catanduanes, Philippines Lower Dugui Mini Hydro Power Plant.
PECO-PEDC Electric Power Purchase Agreement EXPOSITORY PRESENTATION 9 September 2010.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
Chapter 15 McGraw-Hill/IrwinCopyright © 2010 The McGraw-Hill Companies, Inc. All rights reserved.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Outline 1)Power rates have doubled with EPIRA 2)EPIRA has re-concentrated ownership of the power industry to a few 3)EPIRA legitimized onerous contracts.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Government Service Insurance System GSIS stand on the By WINSTON F. GARCIA President and General Manager meralco issue.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
SOLAR RENTING (PTY) LTD WHY SHOULD A CUSTOMER BUY SOLAR, IF HE CAN RENT? THEY CAN RATHER USE THEIR MONEY TO MAKE MONEY!
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
CALIFORNIA ENERGY COMMISSION Outlook for California’s Electricity Supply and Land Use Implications BLM National Lands Conference David Maul Chris Tooker.
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
Overview of Market Reforms and the WESM
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
A people’s review on the impact of the Electric Power Industry Reform Act of 2001.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Copyright © 2015 GRS – All rights reserved. RTD/ATU 1001 Pension Plan January 13, 2015 Pension Fund Status As of January 1, 2014.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Philippines’ Electric Power Regulatory Framework
REVISED UNIFORM REPORTORIAL REQUIREMENT (URR)
Damitha Kumarasinghe Director General
All our strategies are aligned with our Vision which is to become Asia’s benchmark of excellence in power regulation, and our Mission to promote and protect.
2nd District, Oriental Mindoro
Typical power transmission and distribution costs
Presentation transcript:

Mr. Luis Manuel Corral Co-Convenor Alliance for Consumer Empowerment (ACE) Member, Laban ng Mamamayan para sa Katotohanan at Katarungan (Lampara) April 2, 2012

HOW TO CREATE A POWER SHORTAGE?

DOE: MONITORS NGCP: Releases Power PSALM RUNS NPC March repair Agus4 (P2.97 kwh) NPC: Agus 5- 7 Less water PSALM sells NPC PB 101, 102, 103, 104 EDC: Siphons profits Power ABOITIZ: Available PB Power Expensive (P15 kwh)

Mindanao Power Crisis: Man- made or Artificial The DOE just monitors the power industry NGCP Reserve Requirements (One Taipan/Sy)-Unusually high/ less power dispatched PSALM runs NPC thru OMA PSALM –NPC Agus 4 repairs -Spotted 2 years ago -Spotted last year, should be repaired December -Instead repaired March/wrong time schedule (And yet water level as high as 5 months ago)

PSALM-NPC Downward units Agus 5, 6, and 7 Less water cascading from Agus 4 so less power Therma Marine (Aboitiz) Power Barges 117 & MW (Available and very expensive) Price: P11-P14 per kwh

EDC (Lopez) Investing more in new capacity In Chile and Peru PSALM Privatization of NPC Barges 101, 102, 103, 104

The problem according to the NGCP is that there is 401 MW power supply deficit in Mindanao. (a)(b) (c) = (a) – (b) (d) (e) = (b) + (d) (f) = (e) – (b) Available Capacity (MW Peak demand (MW) Surplus/de ficit (MW) Required reserve margin (MW) Peak demand + Required reserve margin (MW) (W/reserve margin) Surplus/ deficit (MW) 1,1491,300(151)2501,

According to the DOE: It’s the Supply Problem Stupid! DOE Proposal: Focus on Supply Repair Agus 4 (one month) Rush ERC to decide favorably contracts between 8 electric co-ops and 2 Therma Marine (Aboitiz) power barges (200 MW) Privatize four remaining power barges 101, 102, 103, 104 and reposition them in Mindanao

According to Consumers: It’s the supply and cost of power Stupid! THE MINDANAO PEOPLES SOLUTION: FOCUS ON SUPPLY AND COST OF POWER Cheap hydro-power was intended to drive growth of Mindanao which faced insurgencies, underdevelopment and separatist movements

According to Consumer: It’s supply and cost of power Stupid! Cheaper power intended to drive commerce, industries and jobs creation Expensive power will cause investors to shun Mindanao, drive away current industry and commerce, and perpetuate poverty in Mindanao

CRITIQUE OF DOE SOLUTION Palace signalling fast-track ERC approval of expensive contracts (P8 to P14 per kwh) for power coming from Aboitiz-owned Power barges 117 and 118. What about consumer interest? What about inclusiveness and participation of consumers in ERC to keep profit level of Therma Marine (Aboitiz) Reasonable?

CRITIQUE OF DOE SOLUTION Privatizing last-resort power barges leaves us with no resort to address similar shortages occurring in Luzon and Visayas All Philippines- not just Mindanao – left to mercy of power producers who can deliberately refrain from investing in additional power capacity to create “shortages” “Shortages” will require solutions involving expensive power

Proposed Solution No. 1 NAPOCOR Power Barges Power Barge Maximum Installed Capacity (MW) Present Location Brgy. Obrero, Iloilo City Brgy. Obrero, Iloilo City Brgy. Botongan, Estancia, Iloilo Holcim Compound, Ilang, Davao Cty Total Capacity128

PB 104 is already part of the Mindanao grid but it’s available capacity is only 10 MW as there is a need to rehabilitate to reach 32 MW full capacity Do not sell the power barges. Instead transfer PB 101, 102, and 103 to Mindanao and fully utilize their maximum installed capacity (96MW) and also fully utilize PB 104 (32 MW). If PSALM/NPC/DOE will follow our recommendation, then, an additional 118 MW will be available for the Mindanao grid.

Proposed Solution No. 2 NPC Agus-Pulangui Hydro-Power Plants Installed Capacity: 982 MW Available Capacity: 622 MW Do not sell the Agus-Pulangui hydro-power plants. Rehabilitate the Agus-Pulangui hydro-power plants and fully utilize their installed capacity of 982 MW. If that is done, an additional 360 MW will be utilized by the Mindanao grid.

Additional power supply 118 MW (from PBs 101 (32 MW), 102 (32 MW), 103 (32 MW), 104 (22 MW)) MW (from the full capacity utilization of Agus-Pulangui hydro-power plants) = 478 MW (additional power for Mindanao grid)

Proposed Solution No. 3 NGCP to reduce the 250 MW reserve capacity to only 100 MW and dispatch the reserve 150 MW for the Mindanao grid to increase supply.

Proposed Solution No. 4 Operational Management Agreement (OMA) contract which allows PSALM to run the NPC as its own, be rescinded. The OMA obligates NPC to remit its gross receipts to PSALM for the latter to pay the stranded costs of NPC to international creditors. NPC must be able to recover all its gross receipts, to be able able to allocate sufficient funds to the flushing and cleaning up of the siltation that is apparent in the Agus-Pulangui hydropower complex area and to expand or put up new hydropower plants.

Proposed Solution No. 5 Mindanao-based electric cooperatives (distribution utilities) to register with the Cooperative Development Authority (CDA) because it will reduce power rates in their respective franchise areas. Allow electric cooperatives to generate their own electricity

Electric cooperatives which are registered with CDA are exempted from paying those additional taxes such as VAT on distribution charge and national and local taxes. That will mean substantial rate reduction.

Proposed Solution No. 6 Require all power firms entering the Philippines to invest a set percentage of their annual earnings to the development of the baseload of Mindanao as part of their cost of doing business in the country.

Proposed Solution No. 7 Government to conduct of multi- stakeholders Mindanao Power Summit to craft the Mindanao Electricity Roadmap and the possible creation of the Mindanao Power Corporation to operate Agus-Pulangui hydro-power complex and other government-owned power generators in Mindanao.

Proposed Solution No. 8 Review and amend the EPIRA. The EPIRA has not met its expected or promised results even after eleven years of its enactment. We cannot leave to private generators task of planning and investing in power. Not in their interest.

Rate-making formula (PBR) and captured ERC making us most expensive in power in Asia, number 5 in the world We will miss out on investments and jobs they create

Proposed Solution No. 9 Focus on the development of more hydro-power plants and biomass-fired power plants which are cheaper renewable energy (estimated P5/kwh for hydro and P6/kwh for biomass)