Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director.

Slides:



Advertisements
Similar presentations
Implementing Quality Concepts
Advertisements

Bringing the Powerful Application of Outsourced Manufacturing… …to the Solar Industry.
Factory Objectives Value of Asset Management Strategies.
Lean Manufacturing.
OPERATIONS MANAGEMENT HOW NOTEBOOKS ARE MADE. Introduction The Video Analysis & Methodology Analysis of the Supply Chain Lean Systems Quality Control.
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
Total Productive Maintenance and FTM From Werardt
ISO 9001 : 2000.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Productive Maintenance
Total Productive Maintenance (TPM)
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
TOTAL PRODUCTIVE MAINTENANCE
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
The Internal Organization Resources, Capabilities, Core Competencies, and Competitive Advantages Pages
T h e Y i e l d M a n a g e m e n t C o m p a n y Service Business Rich Ruiz Director, Global Provisioning GSS Service Supply Chain Mgmt.
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Building Competitive Advantage Through Functional-Level Strategy
©2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Building Competitive Advantage Through Functional-Level Strategy
Quality Assurance VS Quality Control
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
Quality, Quality Control Lee Buddress, Ph,D., C.P.M. Robert G. Gleason Professor and Director Supply and Logistics Program Portland State University.
Key Performance Indicators - KPI’s
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
Total Productive Maintenance (TPM)
NE Process Industry Productivity Benchmark th March 2010.
Global Quality Operations Sustaining Quality ^ : Why is Quality Good for Business? Diane E. Bergeron Vice President Global Quality Operations Schering-Plough.
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
Quality Prepared By: Ali Siddiqi.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 8 Performance Measurement and Strategic Information Management.
DRIVING INNOVATION © Poclain Hydraulics – 2010 Confidential.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Your LogoYour own footer. Production & Operations Management Chapter : The Role of Operations Management Business Process Reengineering Inventory Management.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
1 © The Delos Partnership 2004 Supply Chain Workshop – 21/22 April 2004 Starting the journey.
No 1 Mr Ram Mohan & Dr Sarita Nagpal Presentation to PMMAI 25 th July 2014 CII’s New Manufacturing Sector initiative.
Total Productive Maintenance (TPM)
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
Objectives of Performance Measures 1.Establish base line measures and reveals trends 2.Determine which processes need to be improved 3.Indicate process.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
ES4C9 – Supply Chain Management
Kaizen Eventing: The process of observation and the elimination of waste in a process.
ABSOLUTES OF QUALITY Definition Conformance to Requirements
Building Competitive Advantage Through Functional-Level Strategies
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
TOTAL PRODUCTIVE MAINTENANCE
Semester 8th (Self Support)
Cost of Poor Quality Cost of Poor Quality.
Balanced Scorecard: Quality, Time, and the Theory of Constraints
36.3 Inspection to Control Quality
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Lean Manufacturing Series
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
Operations Management
LEAN ORGANIZATION SUMMARY
IENG 451 / 452 Stability: Total Productive Maintenance
Kaizen Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka
Green University of Bangladesh
Procurement’s Impact on Logistics.
PDCA Problem Solving Guide
Safety Self-Inspections
Introduction to Quality
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Presentation transcript:

Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director

2 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement FCI b ackground and profile Creation in 1988 by Framatome for diversification outside nuclear field 20+ acquisitions and 20+ years later, FCI is one of the largest global connector manufacturers November 3, 2005: FCI is acquired by Bain Capital, a private investment fund With operations in 30 countries and a turnover of 1.3 billion € in 2010, FCI is a leading connector manufacturer Its 14,000 employees are committed to providing their customers with high-quality and innovative products for a wide range of consumer and industrial applications

3 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement A variety of solutions and products Microconnections connectors Motorized Vehicle connectors Electronic connectors

4 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement 24 manufacturing sites and 14 R&D centers Europe 7 manufacturing sites 1 Corporate Research Center 6 R&D centers Americas 5 manufacturing sites 2 R&D centers Asia 12 manufacturing sites 6 R&D centers

5 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement FCI Lean Initiatives Every department is monitoring a continuous improvement process contributing to customers satisfaction and costs reduction People Empowerment for Accidents, Absenteeism and Turnover Quality for Customers Complaints and Non Right First Time Supply Chain for Late Deliveries, Inventory and Distribution Lead Time Supplier Development for Receiving Frequency, Complaints, Gap to AVL Process Design for Bottlenecks and Idle equipments Product Development for Time To Market and Design Changes Customer Focus for Time To Quote and Customers Disappointments

6 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Continuous Improvement on Quality

7 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Customers Quality Feedback We discover our actions impact 3 months later

8 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Quality Improvement Tools Complaint 8D and Quality Wall In case of complaint, 8D to make sure this type of problem won’t occur anymore For any Quality risk identified, make sure people are able to check all parts Red Bin Review and Quality Workshop Review daily every red bin, to solve quickly many stupid defects Workshop to test root cause hypotheses on most complex problems Go 1 st Part and 1 st Defect Stop Before starting to produce, check if there is a fair chance to produce good parts While producing, stop at 1 st defect to allow people to investigate the cause

9 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Quarterly 8D audit of shop floor evidences D1: Team Cross-functional including operators D2: Problem Defective parts available and data on “who, when, how many, what, where, how, why” D3: Containment (within 24 hours) Inspect all stocks, implement Quality Wall, 1 st Defect Stop, and Red Bin Review Analyze several non-detection causes from “man, machine, material, method, environment” through 5 Why and test of hypothesis to reproduce non-detection D4: Root causes Quality workshop to analyze several causes from “man, machine, material, method, environment” through 5 Why and test of hypothesis to reproduce defect D5: Corrective actions Robust actions (poka yoke) implemented on time D6: Effectiveness Actions correctly implemented and measurable impact D7: Prevention Risk analysis, Go 1 st Part, Preventive Maintenance, Training check, Mgt routine... Applicable on similar product and process D8: Closing By management based on shop floor evidences

10 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement 8D benchmark From 52% to 87% of rigor definitively fixes many problems and develops customers confidence

11 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Quality Wall Visible and Standardized Inspections

12 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement 22% DL inspecting with 3% in Quality Walls Overall less inspections (+233 quality wall -441 random) Less people, but better controlled inspection

13 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement The Red Bin is a tool: by looking into it, we see lots of simple and stupid problems easy to fix quickly Red Bin Review and Quality Workshop At the Pareto “head” we have well known problems occurring very often but complex to fix Usually manufacturing is adapted to avoid customer complaints (containment actions, in line inspection, people awareness), but it costs At the Pareto “tail” we have rare and stupid problems, but customers often received such defective products Lots of Internal PPM: Quality Workshop Lots of Complaints: Red Bin Review Typical internal defects Pareto

14 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Go 1 st Part working standard checklist

15 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement 1 st Defect Stop with on line detections

16 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement First defect stop and red bin review implementation on Machine 57 PPM before: PPM after: OEE before: 77 % OEE after: 78 % Epernon factory example

17 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Main difficulties: Needs of resources to quickly implement the corrective actions Cannot be done on bottleneck machines since temporarily reducing the output Organization modifications: Dedicate 2 persons to work on 1st Defect Stop implementation: 1 for machine software modification and immediate actions 1 for immediate actions They move from one machine to another after 2 weeks Epernon factory example

18 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Besancon factory example Video on 1st Defect Stop and Red Bin Review

19 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement Immediate feedback from on line detection Process design minimum requirements for Jidoka: 1- Detections exist for every occurring defects On product, on process, manual inspection, sampling (non-random defect) 2- Detections are capable Reliability & Repeatability analysis 3- Detections are done at every process step Before adding more value to the defective part 4- First Defect Stop Immediately before the clues disappear 5- Defective parts removed manually To get a chance to go and see the defect causes

20 Yves Mérel, FCI Group Lean Director, 20 May 2011, Jidoka for Quality Improvement 150 to 40 complaints/month within 3 years 8D - Quality Wall - Red Bin - Workshop - Go 1 st Part - 1 st Defect Stop