PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.

Slides:



Advertisements
Similar presentations
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
Advertisements

CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Why we need an improved LASER calibration system
University of Wisconsin
LKr status R. Fantechi.
T1 status (a selection from EDR presentations)
Preparation for CERN test beam
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
Quick link: cern.ch/cmstb04
UK ECAL Hardware Status
Preparation of the CLAS12 First Experiment Status and Time-Line
Status of CO2 Cooling tests at CERN for Pixel phase 1
4x5 SC array for the test beam in Apr 2007
UK CMS Oversight Committee Mtg
E. Garutti - Main Meeting
PROGRESS on EE VPTs, Dees D Cockerill
Presentation transcript:

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March 2008 April 2008 – Oct 2010

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 2 VPTs Continued mass production testing to ~Sep 2006 Main contract Replacements contract Database RAL – CERN to ~Dec 2006 VPT sorting to ~ Dec 2006? Shipping to CERN – all by Dec 2006? People Bruce, Joolz, Martin, Laurie (only to 31 March – X, 2006!) VPT Production

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 3 HV cards/Umbilical/Motherboards/VFE cards Components fully specified by Jan 2006 Preproduction for Dee4, 20 SC sets by Spring 2006: HV cards - 20 umbilicals - 20 Motherboards VFE cards People Claire, Ken, Bob, (Matt, Mark, Werner) SC Front End Thermister calibration 20 calibrated thermisters needed for Dee4 SCs by Spring 2006 Total of 560 calibrated thermisters, evenly to end 2007 People Paul, Joolz RAL PPD/RAL ID ETH-Z

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 4 VPT HV HV distribution Preparation for Dee4 CAEN HV supply + prototype distribution box by April 2006 HV software drivers tested with SC01 at RAL HV distribution method defined WITHIN a Dee, by April 2006 People Claire, Ken, Bob, Philip, Barbara, (Tony)

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 5 VPT HV HV test box Test pre-production HV card/umbilical assemblies for Dee4 Measure/check continuity, i L at 1500V Construction by RAL PPD, by March 2006 Test of first 20 assemblies by April 2006, ship to CERN People Claire, Ken, Laurie, Joolz, Barbara, (Tony)

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 6 Mass production of HV cards/umbilicals, summer 2006 – spring 2007 Procurement RAL PPD Tests of HV cards/Umbilical assemblies with HV test box (Motherboards/VFE cards ETH-Z) Tests for correct trigger mapping to the motherboards, before mounting on Dees RAL PPD/Virginia ?? People Claire, Ken, Laurie, Joolz, Barbara, Dave, (Tony) VPT HV mass production

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 7 VPT LED Stability pulser Prototype LED firing box for Dee4 by April 2006 Up to 5 fibre outlets needed for Dee4 People Paul, Bob, (John Hill/Tony, fixing to patch panel, fibre routings) Collaboration with Virginia – decide who does what, by Jan Newer/better LEDs/improved coupling - LED driver - Complete drive boxes - Interface to ECAL DAQ As an alternative monitoring system, by summer can we get to 50, 100 GeV equivalent?? People Paul, Bob, Ken, Dave, (Tony)

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 8 Dee4 at CERN Dee4 assembly/tests Spring/Summer/Autumn 2006 SC soak test stand by March 2006 Oversight of Dee assembly: SC assembly/mounting on Dee4 Dee4 test stand - collaboration with Virgina for front light injection tests - use prototype HV distribution system - tests of motherboard trigger configuration - learn to operate ‘mobile’ ECAL electronics test stand - analysis of data - VPT LED stability pulser People. Dave, Claire, Barbara, Joolz, Paul, (Matt, Tony) at CERN

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 9 Dee4 in beam at CERN Dee4 in test beam October 2006 and/or April 2007 Installation at H4 Debugging Shifts Analysis Proof of VPT stability People Dave, Ken, Claire, Bruce, Barbara, Joolz, Paul, Bob

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 10 Dee1 – Dee4 Dee1 – Dee4 from Summer 2006 – March 2008 Bare SC assembly from Q onwards SC mass production from summer 2006 – Feb 2008 RAL PPD - responsibility for SC soak tests - analysis of test stand data - continuity/HV/trigger tests on Dee, in collaboration with Virginia - analysis of Dee4 test data - VPT LED pulser systems/checks, in collaboration with Virginia People Dave, Claire, Bruce, Barbara, Joolz, Paul, Bob, (Tony, John) Mounting of Dees on HE±, 2007/2008 People Ken, (John, Tony)

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 11 Dee1 – Dee4 Complete HV distribution systems - needed for bldg 867 integration tests - Full Dee4 system by Feb 2007 (keep in 867) - Dee1-3 systems by Dec 2007 People Claire, Ken, Joolz, Barbara, (Tony) Mounting of Dees on HE±, 2007/2008 People Ken, (John, Tony)

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 12 The Transition March Dees installed in CMS Need to Shepherd our resources as the group’s Brownian motion diminishes What do we do? My personal opinion, particularly for the first (EE) LHC run : PPD – duty to show EE working as expected duty to show VPTs are stable (does not necessarily imply continuous calibration responsibility) People Dave, Ken, Claire, Bruce, RA1, RA2

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill years of LHC running Hardware PPD – responsibility for all things ‘VPT’ keep it all running during LHC on periods interventions/repairs/upgrades during short/long shutdowns -Special care/analysis at each substantial luminosity increase VPT leakage currents, stability, noise……. -Analysis of data – to check EE performance People Dave, Ken, Claire, Bruce, RA1, RA2 CMS run control Ken

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 14 Is that all ????? Rumours that the Great Bear in the East is Stirring !! We may be confronted with all this much sooner than expected !