The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.

Slides:



Advertisements
Similar presentations
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Advertisements

1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Front end test stand — WP2
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
ISIS Accelerator Division
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
Solid Target R&D Programme Colliding the proton beam with a dense target is currently the only known way to produce enough muons for the neutrino factory.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Recent FETS Ion Source Measurements UK Neutrino Factory Plenary Meeting 8-9 June 2010 Rutherford Appleton Laboratory Dan Faircloth Faircloth.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation,
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Neutrino Factory R&D in Europe Rob Edgecock/RAL. Outline Introduction i.e. what has happened since last year European feasibility study Proton driver.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ISIS operational update
UK Neutrino Factory Conceptual Design
The RAL Front End Test Stand
The RAL Front End Test Stand
Accelerator R&D for Future Neutrino Projects
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
1- Short pulse neutron source
Superbeams with SPL at CERN
H- Ion Source Development
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
The SPL-based Proton Driver at CERN
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Presentation transcript:

The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS VICTVM QVAERIT

2 2 CCLRC Council for the Central Laboratory of the Research Councils Member of RCUK (Research Councils UK) BBSRC, CCLRC, EPSRC, ESRC, MRC, NERC, PPARC Provides large facilities for UK science Lasers, neutrons, synchrotron radiation BBSRCBiotechnology & Biological Sciences Research Council CCLRCCouncil for the Central Laboratory of the Research Councils EPSRCEngineering & Physical Sciences Research Council ESRCEconomic & Social Research Council MRCMedical Research Council NERCNatural Environment Research Council PPARCParticle Physics & Astronomy Research Council

3 3 Rutherford Appleton Laboratory ISIS Diamond Daresbury Laboratory SRS 4GLS CCLRC

4 4 ISIS ~270 people total Accelerator Division (~95) Diffraction & Muons Division Instrumentation Division Spectroscopy & Support Division Target Division David FindlayPhotonuclear physics / light nuclei Photofission Radioactive waste Accelerator services Gemstones (in private sector) Medical sterilisation (in private sector) ISIS

5 5 Why a [proton driver] front end test stand? Prove key elements of high power proton accelerators Applications of a RAL test stand Generic Spallation neutron sources Neutrino factories Transmutation machines Tritium generators Energy amplifiers Training / Young people / Real hardware Specific ISIS upgrades UKNF UK academic accelerator community

6 6 ISIS World’s leading spallation neutron source Natural wish to stay at or near front Upgrade strategies / CCLRC funding / ASTeC (ASTeC = CCLRC’s Accelerator Science & Technology Centre) UK Neutrino Factory Strong drive from UKNF community PPARC support for proton driver R&D Synergies with possible ISIS upgrades UK academic community Imperial College - CCLRC joint appointment Lecturer / Senior Lecturer in Accelerator Science Extend university accelerator centres to protons

9 9 What’s in a front end? Ion source, LEBT, RFQ and beam chopper Why does it matter? Where beam quality set for entire machine What has to be tested? New, high performance ion sources, RFQs, beam choppers ISIS 0.16/0.24 MWNow PSI 0.75 MW[not pulsed] SNS 1 MWNear future JPARC 1 MWNear future NF 4 MW — a big step!Further away [ISIS 1, 2, 5 MWPlans]

10 So, planning to build front end test stand at RAL But already had one!

12 ISIS RFQ Test Stand RFQ to replace ISIS Cockcroft-Walton MHz, 4-rod, 35 keV i/p, 665 keV o/p 50 mA / 10% DF design, 30 mA / 2% DF use Test stand built to characterise and soak test Met specifications Soak tested successfully for >2000 hours

19 Proton driver front end test stand at RAL ISIS Accelerator DivisionCCLRC/ASTeC Imperial CollegePPARC Warwick UniversityPPARC + ? + 1½ × ½ SY/year EU (HPRI-CT ) + 5 × ½ SY/year EU (HIPPI/CARE/ESGARD) Mike Clarke-Gayther, Dan Faircloth, Frank Gerigk, Paul Harrison, Alan Letchford, Ken Long,...

20 Relationship with CERN test stand Formal cooperation through HIPPI Two approaches to beam chopper But different CERN test stand for Linac4 then SPL Proton / H – ion sources RAL test stand more generic Differences reflect organisation’s missions

21 RFQ 234 MHz Bunch + accel- erate Chopper Switch in 2 ns for ~0.1 ms LEBT Match ion source to RFQ H – ion source 60 mA 2 ms Beam stop Diagnostics Transverse emittances, energy & energy spectra, bunch widths, halo,... Block diagram of RAL front end test stand 75 keV2½ – 3 MeV

22 H – ion source — Development to ~60 mA required Based on ISIS H – ion source (35 mA) LEBT — Revision of ISIS RFQ LEBT probably sufficient RFQ — Base on ISIS & ESS 4-rod RFQs ISIS RFQ designed for 10% RF duty factor cf. ISIS 2% 75 keV in, 2½ – 3 MeV out, MHz Most expensive item: ~1 – 2 MW RF driver Beam chopper — Development required Based on ESS concept But need ion source, LEBT and RFQ to test beam chopper

Ion source development rig (ISDR) at RAL

H – ion source R&D programme — for future high power proton accelerators (e.g. for future spallation neutron sources) — × ~10 output required 1 inch Important milestone passed Successful thermal modelling of world leading ISIS ion source — extraction of surface temperatures Excellent agreement between calculated and measured thermocouple temperatures Anode 200°C Ab initio calc.Meas.°C Anode t/c – 600 Cathode t/c Body t/c °C Cathode

Close-coupled chopper module 1145 mm Slow switch Fast switch Beam Buncher cavity

Beam chopper R&D programme — specialised hardware — fast, high voltage pulser specified and procured 1½ kV rise in <2 ns

28 RAL front end test stand for: ISIS upgrade Front end of 180 MeV linac MHz DTL to ~80 MeV MHz SCL to 180 MeV (like Linac4 at CERN) UK neutrino factory High power proton accelerators in general

29 New ~180 MeV linac Present 70 MeV linac ISIS half-megawatt upgrade

30 UK Neutrino Factory New ~180 MeV linac

31 With existing funding, at end of three years, i.e. by March 2007, expect to have Dedicated area (in R8 (probably)) Lead shed (shield against RFQ X-rays) Support structure / Stands Operational ~60 mA H – ion source available LEBT assembled Design for RFQ Specification for RF driver Proven electrical design for beam chopper Design for quadrupoles and cavities for chopper Specification of diagnostics

R8

R8, area easily available 290 m² More space available 5 m 12 27½ ½1½ 4½4½ ½5½ 7 RFQChopperDiagnosticsLEBTIon source RF driver area Mag. spectr.

36 Opportunities to take advantage of: Area in R8 already well provided — space, electricity, water, air, crane, loading bay, on main ISIS controls circuit, … Significant existing hardware — high power arc driver and high power extraction pulser for H – ion source, TMPs, gas scattering spectrometer, magnetic spectrometer, emittance scanners, data acquisition systems, 200 kW RF driver,...

– 2007 Overall scheme, design, infrastructure, specifications, some hardware  2007 Complete scheme Hope to demonstrate high quality chopping of ~60 mA H – beams at ~2½ MeV [End]

Novel gas scattering energy spectrometer at RAL

Surface barrier detector + Cs 137 conversion source

Experimental ion source and assembly

RAL beam chopper design Robust design with explicit provision for high power beam collection Slow transmission line Lumped line — thermally hardened ns 8 ns Up to 100 µs