Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief.

Slides:



Advertisements
Similar presentations
Fiber Reinforced Plastic beam manufacturing process
Advertisements

Justin Akerman (CE) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
Composite Filament Winding RIT Multidisciplinary Design Project P09226 Shijo George, Alex Sandy, Tiago Santos, Christofer Brayton, Daniel Weimann
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
MSD1 Senior Design Project- Oxygen Gas Sensor P09051 Samuel Shin Jeremy Goodman Sponsor: RIT uE & EE department Project Guide: Professor Slack.
Resin Bath/Feed Eye The Fiber Dip bath bends fiber in and out of a pool of resin for impregnation Rollers are used to reduce fiber abrasion and spread.
P09226 Dept of Mech Eng (Sponsor) Dr. Alan Nye (Faculty Advisor) Alexander Sandy (ME), Christofer Brayton (EE), Tiago Santos (ME), Daniel Weimann (ME),
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
Composite Filament Winding Machine: P09226 Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann Dr. Alan Nye Dr. David Orlicki Electrical.
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
Composite Filament Winding Machine P09226 System Design Review Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Composite Filament Winding Machine P09226 Detailed Design Review Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Composite Filament Winding Machine P09226 System Design Review Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann.
Filament Winding Machine P09226 Budget Presentation.
Filament Winding Machine Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Senior Design.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
Composite Filament Winding Machine P09226 System Design Review Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P09561 – Visible Spectrum Imaging System: Project Update Dave Lewis Steve Sweet Joanna Dobeck Lenny Calabrese Jason Thibado Darrell Draper Customer: Dr.
Low Cost Fundus Camera P15590 December 11th, 2014
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
System Design Review April 5th, 2013 P13623: Conductive Heat Transfer Lab Equipment.
Project Status Update R09220 – Competitive FSAE Autosports Systems
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th :00 AM – 12:30 PM Project
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MSD Project Team P08454 Underwater Thruster Design Anthony Squaire – Team Leader - Industrial and Systems Engineering Alan Mattice – Lead Engineer - Mechanical.
Quality Consulting Module 7 Solution Development.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
P07307: Controls for Dynamic Suspension
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Turbomachinery Flow Visualization P08453
P07203 Dynamometry Laboratory Infrastructure
P13623: Conductive Heat Transfer Lab Equipment
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
P08351: Automated Oiling System
P08002-Automated Parallel Bars
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Project Review P07442: Thermoelectric Demonstration Test Bed
Team P15441 Mini Air Sub-System Design Review
P07122: Autonomous Quadcopter
P09045: Membrane Characteristic Test Stand
P15611: Digital Microfluidics Packaging
P09043: Fluid Smart Lap-Band
Presentation transcript:

Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief Engineer Mechanical Engineer  Sponsored by RIT Mechanical Engineering Department

Project Description A machine to produce composite tubing (i.e. fiberglass, carbon fiber) Market: RIT ME Department Key high level customer needs / engineering specs: o Robust o Quality Control o Ease of use Simple but effective machine that produces limited products Minimize raw materials (resin, fiber) Maintain fiber tension throughout process Fiber volume fraction > 50% Operation procedure simple Easily disassembled for cleanup

Concept Description Creel to hold and tension fiber Resin bath to impregnate fibers Mandrel to wind fibers on Control system for accurate winding Separate Motors to drive spindle and carriage

System Architecture

Technical Risk Assessment Effective Impregnation System Description Fully impregnate fibers, but not soak Ensure quality of product Maintain constant temperature Mitigation Trial & Error Method with mock-up Resistance Heater or Hot plate to heat resin Monitoring System using thermocouples & sensors feedback Controllability of Motors Description Micro-controller compatibility Precise positioning of fibers Ease of use (set & forget) Expandable & Cost Efficient Mitigation Consulting with professors & technicians from suppliers Mock up with any available motors in Department Testing on Anaheim Automation motors

Current State of Design Sponsor obtained with fixed budget of $2,000 Design meets customer needs Design of machine elements completed, driving system & controls selected and unnecessary parts removed Part’s raw materials in house, machinery BOM prepared Design meets engineering specifications for full system and subsystems Project expenses within budget: So far ~ $ 1,000 allocated Behind one week in programming for system’s control Design of spindle’s motor bed still in process Mitigation: -Team effort in catching up with programming control routines -Team is working over the break

MSD 1 Project Schedule Milestones Mar. 20 th (Week 2) – Impregnation, Tension Test complete Apr. 3 rd (Week 4) – Motors and Controls Test complete Apr. 17 th (Week 6) – Complete Machine Build May 1 st (Week 8) – First Composite Part produced (post- debugging) May 8 th (Week 9) – Composite Part test complete (tentative)