My furgone watching. Wipe the frame clean Ready to remove the rust.

Slides:



Advertisements
Similar presentations
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Advertisements

1.Cable management cover ( cpu only ) 2.Wired barcode scanner holder (optional) 3.Mouse holder and tray 4. Removable rear technology panel 5. Power cord.
Of the 3,867 California Specials that were made in 1968, approximately 100 were shipped to dealerships in the Midwest. Two of those cars had manual steering.
Driveshaft installed. Bits and pieces – new oil seal.
Drawing furniture using One Point Perspective
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
VESPACAR P501 MPR2T TAKE ME TO BAYFIELD KEN THE BUYER.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Put a drop of oil inside the wire holder caps – stops rust.
The Datsun Roadster Book TM Our Car Here are some pictures of some of the second restoration effort on our 2000started in 1974 and is presented elsewhere.
Sandblasted, repainted fender brackets. Mudflaps and rubber buttons to attach them.
Say what you have done: Example: Open the door!
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Cobwebs and ladybugs. Pulling the gas tank and other parts.
Medical Ambulance Bus Patient Loading. Inside Right of MAB looking forward.
1 TRAILER Pictures of Rusted Parts and Areas 2 TRAILER TIRES Before Sandblast and Prep.
These are the first sketches I drew when we were searching for different types of mice.
Vent window installed. Install door frame side latch.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
The Pole and Barn Paradox
Canadian Signcrafters shop – Pete applies the logos.
Ladybugs spending the Winter on the brake hub and inside the wheel rim.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
James Tam Quirky Designs Some of these designs come from while others I simple took pictures of while going about my daily business.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
Pollution Prevention for Paint & Body Shops Miami-Dade County Department of Environmental Resources Management.
Cabin beading ends. Cracked cabin beading No rust to speak of.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
Middle school camp! A.K.. Before Camp We were going to Sovereign Hill! Everyone was exited. We had to get to school before nine o’clock because that was.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Outside the body shop. Ready for the ride home Finished doors.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Introduction Thank you for taking the time to view this slideshow, it will walk you through the re-assembly and pieces of your watch. To skip a slide simply.
Screen Printing Steps “Rembrandt Tulips” Edition of 25 By Dorothy Markert, 2007 Creating an original print with one screen.
NGfL CYMRU GCaD PRESENTATION PAINTING & DECORATING PAINTING & DECORATING.
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
Unit 16 Clean the Classroom. Where are my balls? Where are my little balls? In, in, in, in the box. On, on, on, on the box. Under, under, under, under.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
LOOKING GOOD. WHY TO KEEP A CLEAN CAR  Regular care and cleaning will prolong vehicle life by...  Preventing rust  It will give you a chance to notice.
Slide Show: Using Idea Machine Templates
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Classroom Expectations
Bicycle Mechanics and Repair Decal Mechanical Engineering 98/198 spraang 14 Lecture 11.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
MSET Jeff Chorn. Rule of Thirds Leading Lines.
Miss Daniels’ Detective Club Mystery #2: Who moved the bike??
MG Car 7676 PRE-PAINT SEND OFF. Sitting in Stuart’s garage – just waiting. Almost a “frame off” restoration, everything to be painted is off the car for.
Hold the thread on the spool with your right hand. With your left hand, pull the thread to your left past the spindle. Keep the thread towards the front.
Introduction Thank you for taking the time to view this slideshow, it will walk you through the re- assembly and pieces of your watch. Thank you for taking.
Paint bottom first. Two coats of paint Paint the top last.
BRC COACH & TRANSIT 2010 TRANSIT BUS REFURBISHMENT PROGRAM.
Drawing Alcoves using One Point Perspective
Fluffy plays with prepositions!
Assembly And Installation Of Ikea Kitchen Cabinets
Unit 1 My classroom 第1课时.
BY HERBER.
LIGHTING OVEN Steps to Follow.
Arrows inside the frame suggest movement of subjects
School Shop.
Student Name English IV 3A Teacher
1 / 13 hallway. 1 / 13 hallway 2 / 13 living room.
1057 G Street, Burwell, ne Location:
At ridge height for family room
Introduction to PowerPoint
1 / 13 hallway. 1 / 13 hallway 2 / 13 living room.
BY HERBER hallway 1 / 13 2 / 13 living room 3 / 13 dining room.
Presentation transcript:

My furgone watching

Wipe the frame clean

Ready to remove the rust

Back into the shop

Left floor pan

Right floor pan

First coat of paint

New threads using a tap

Tap and die set

Rear frame painted first coat

Rubber coppia tamponi

Bayfield Garage

Ready to go to DenWay

In transit

Arrival at DenWay

Pushed into a bay

Ready to start

Beside the calendar

In the paint booth

Door on a hook

The other door

The painters

Bright lights

With camera flash

Left front – without camera flash

Right front without camera flash

Cabin is finished

Sandblasted

Upper tailgate sandblasted

primed

Tailgate primed

Van box inside