1 NETWORK PLANNING TASK FORCE FY’06 “ Final Session – Setting the Rates” 12/5/05.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

1 NETWORK PLANNING TASK FORCE August 2, 2004 “SUMMER FOCUS GROUP SESSION ”
1 10/31/05 NETWORK PLANNING TASK FORCE Information Security.
1. Funding model for telecom services  FTE funding model  Blue Ribbon Committee on IT Excellence Horizontal wiring upgrades 2.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
1 Information Security Vision Part II Network Planning Task Force 10/8/2003 Deke Kassabian and Dave Millar.
11/29/20041 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”
1 NETWORK PLANNING TASK FORCE August 16, 2004 SUMMER FOCUS GROUP SESSIONS “SETTING THE AGENDA”
1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSIONS ” 8/01/05.
Lesson 11-Virtual Private Networks. Overview Define Virtual Private Networks (VPNs). Deploy User VPNs. Deploy Site VPNs. Understand standard VPN techniques.
1 11/21/05 NETWORK PLANNING TASK FORCE FY’06 Final Strategy Meeting.
CNIL Report April 4 th, CNIL Report (Apr 4 th, 2005) Two Major Goals: –Improvement of Instructional Services –Strengthening research IT infrastructure.
NPTF Wireless Discussion. 3/3/20032 Agenda Goals Strategy Current status Future plans Challenges Options.
1 NETWORK PLANNING TASK FORCE FY’06 Network Strategic Discussions 11/7/05.
12/1/20031 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”
Network Planning Task Force Special Spring Session.
1 NETWORK PLANNING TASK FORCE FY’07 “ Setting the Rates” 11/20/06.
Business Data Communications & Networking
Network and Systems Security Security Awareness, Risk Management, Policies and Network Architecture.
Wireless LANs A Case Study of Baylor University’s Wireless Network Copyright Bob Hartland 2002 This work is the intellectual property of the author. Permission.
EDUCAUSE Security 2006 Internet John Brown University.
November 2009 Network Disaster Recovery October 2014.
1 NETWORK PLANNING TASK FORCE Fall Agenda Setting and Focus Group Planning
Server Virtualization: Navy Network Operations Centers
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
TECHNOLOGY AND THE BOND PROGRAM TECHNOLOGY PLAN
::1:: ResNet 2008 ResNet Changes at Indiana University Changes for the Last 2 Years and for the 2008 Fall Move-In.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
Oracle Open World 2014 Integrating PeopleSoft for Seamless IT Service Delivery: Tips from UCF 1 Robert Yanckello, Chief Technology Officer University of.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
Communications Pool FY ’06 Marla Meehl Friday, 10/21/05 NETS – Network Engineering & Telecommunications Section Enterprise Services Computer Security.
1. 1. Overview: Telecommunications Project  Planning and implementation (2007-today) 2. Discussion: Proposal to Improve Infrastructure  Upgrade horizontal.
Talking points Attacks are more frequent, more aggressive, require more time to repair and prevent Machines get compromised in 2003 for the same reasons.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
FY ‘08 NETWORK PLANNING TASK FORCE Strategy Discussions
Onboarding: Enable Success or Failure Lindsay Dick Director of Sales.
The University of Texas at San Antonio The Office of Information Technology Network Upgrade Overview.
Updated Technology Purchase Plan Purchases to be split between the remaining funds in ($52,000) and the capital request for ($60,000) Projects.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
Network and Systems Security Security Awareness, Risk Management, Policies and Network Architecture.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
1 Financing IT Services Recharging & Core Funding Strategies Common Solutions Group J.W. McCredie February 3, 2000.
Information Technology Study Fiscal Crisis and Management Assistance Team (FCMAT) Las Virgenes Unified School District Presented By: Leslie Barnes Steve.
Natick Public Schools Technology Update April 23, 2007 Dennis Roche, CISA Director of Technology.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Identifying Application Impacts on Network Design Designing and Supporting.
1 Second ATLAS-South Caucasus Software / Computing Workshop & Tutorial October 24, 2012 Georgian Technical University PhD Zaza Tsiramua Head of computer.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
Network and Perimeter Security Paula Kiernan Senior Consultant Ward Solutions.
Update on Campus Networks December 2009 Bruce Campbell Director, Network Services Information Systems and Technology.
VolNet2 Bill White Network Services. September 20, 2004OIT Fall Staff Meeting Why Volnet2? Based on the Security Assessment findings Insecure protocols.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Introducing Network Design Concepts Designing and Supporting Computer Networks.
STRATEGY SESSION SEPTEMBER 15, YEAR SECURITY DISCUSSION 1 NETWORK PLANNING TASK FORCE.
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
FY ‘09 NETWORK PLANNING TASK FORCE Final Rate Setting
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Introducing Network Design Concepts Designing and Supporting Computer Networks.
Core IT Assessment Approach Common Solutions Group IT Governance and Funding Workshop January, 2006 Philip Long Yale University.
Rob Davidson, Partner Technology Specialist Microsoft Management Servers: Using management to stay secure.
FY ‘08 NETWORK PLANNING TASK FORCE Rate Setting
Campus Deployment of Wireless Technology Presented to Information Services Committee November
12/15/20031 Network Planning Task Force “Consensus Building: Final Rate Setting for FY ‘05”
NETWORK PLANNING TASK FORCE FY ‘08 Planning Session I 1.
Campus Data Storage & Services Task Force Update IT Pro Forum 9 November 2011.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Creating the Network Design Designing and Supporting Computer Networks – Chapter.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Printing (Net-Print) Joanne Button August 23rd 2016.
Strategy for Complex Networking, IT, & Telecommunication Decisions
Information Technology (IT) Department
Firewalls.
Enterprise Content Management Owners Representative Contract Approval
Fy ‘08 NETWORK PLANNING TASK FORCE
Presentation transcript:

1 NETWORK PLANNING TASK FORCE FY’06 “ Final Session – Setting the Rates” 12/5/05

2 Meeting Schedule – FY 2006 ■Summer Planning Sessions (2)  July 18  August 01 ■Fall Focus Groups (2)  September 19 ■Fall Meetings (6)  October 03 – Security Priority Setting  October 17 – Network Priority Setting  October 31 – Strategic Security Discussions  November 07 – Network Strategic Discussions  November 21-Final Strategic Discussions/Summary of needed decisions  December 5 – Consensus/Prioritization/Rate Setting

3 Agenda FY’07 Security Initiatives Financial Summary  Network Financial Health  Setting the CSF Rate  Other Proposed Rates

4 FY’07 Security Initiatives Architecture Local firewall support Edge filtering Needed decisions  Scan and Block  Monthly scanning

5 Security Architecture

6 Local Firewall Support Recommendations  ISC recommended firewall is NetScreen, from Juniper Networks (  Recommend external consultants. (February 2006)  ISC for-fee firewall consulting service. (May 2006)  Streamline ISC intake for this service to coordinate with TSS, Networking and Security. (In progress)

7 Edge Filtering Recommendations:  By July 1, 2006, Block NetBios at PennNet edge, other than in a reserved range of addresses. External traffic bound for Netbios services on all other Penn IP addresses would be blocked. NetBios would be remotely available for machines in the subnet and….  FY’ 08: Encourage replacement of remote access to NetBios services with functional equivalents that don’t use NetBios – e.g. Exchange Server 2003 RPC over HTTP and new file service options. Planning Assumption:  Requires technical/communications planning and information gathering now. School/center support.  WINS server information necessary  DHCP ranges  Windows browsing requires configuration  Campus-wide communications would need to begin soon. (ITR)

8 Scan and Block Recommendation  Deploy a “scan and block” system to help prevent network access by compromised or vulnerable computers. Authenticated wired and wireless network access, with brief scan of hosts for major vulnerabilities at connection time. Quarantine those with problems found, until they can be patched or repaired. Allow those that “pass” the scan to access the network. Schedule deeper scans once connected. Solution Options Preferred Option: Solution from Lockdown Networks   Currently working with vendor on key elements, with final go/no-go in mid- December Second Option: Locally developed solution  Needed if Lockdown cannot fully meet requirements  Large software development project, requiring approximately 1 person-year  Server hardware to handle scanning/logging Third Option: Shared solution  Exploring options with Cornell in the hope of "sharing a solution"

9 Scan and Block Estimated Costs  One-time cost for residential system and public wireless networks is, $300,000 for options one or two.  Approximately $100k ongoing costs to start in FY ’08 and may increase the Central Service Fee. (Conceptual decision needed today.) Planning Assumptions  To do Scan and Block wireless access points must be upgraded to Cisco 1131 and 1232 models.  Implementation in the residential system (wired and wireless) is scheduled for August 1,  Deploy Scan and Block for 1-2 campus wireless networks in the Summer (Law).  ISC to fund and upgrade all ISC-managed wireless access points in FY’ 07 and to expand Scan and Block capability to some wireless networks.  ISC to provide one-time funding for major strategic initiatives such as this, as it has in the past with Intrusion-Detection and Central Wireless Authentication.  CSF to support ongoing costs starting FY ’08.

10 Timeline Goal of deployment in residential buildings for start of Fall Could be expanded thereafter. Jul 04 Jan 05 Jul 05 Jan 06 Jul 06 Solutions Design Scan & Block Evaluations Purchase & Integrate, or Build Planned Deployment Initial SUG And ITR Talks NetReg, &.1x pilot

11 Security Scanning Frequency/Intensity Background  Two types of scans: Vulnerability–scan for anywhere from a few, up to practically a limitless number of possible vulnerabilities  Pros: Low false positive rate, when used for a limited set of vulnerabilities Proactive  Cons: High false positive rate for many other vulnerabilities, making interpretation time-consuming Compromise– scan for signs of hacked machines  Pros: Low rate of false positives, little interpretation required  Cons: Reactive, rather than proactive  Current practice is two compromise scans annually and vulnerability scans on request.  Proposed policy requires monthly scanning of critical hosts. ISC to work with schools/centers on scanning of critical hosts behind firewalls. Recommendation  Vulnerability scan twice annually and compromise scans monthly. Cost  $25K annually. (Decision needed today to include in CSF for FY’07.)

12 FY ’06 – ’11 Network Financial Health

13 FY ’07 Revenue Sources

14 FY ’06 Current Central Service Fee Rate

15 FY ’07 Projected Central Service Fee Rate

16 Proposed New Rates (FY ’07) 10Mbps 100Mbps Wireless  Installations  Monthly Support Fees Voice including VoIP Video

17 FY’07 Proposed Rates

18 Wireless Proposal FY ’07 ISC to capitalize access point hardware, using a 3-year depreciation schedule. Deploy next generation of wireless technology. ISC to replace all existing APs under ISC support by the end of FY ’07. Law to be completed in July Costs for hardware depreciation, hardware/software support, staff, etc. will be $27/month per AP.  It is currently $27/month without hardware depreciation. More public wireless IP addresses in schools and centers will be subsidized.

19 Estimated Wireless One-time Costs Site survey/plan 2 Techs 2hrs Equipment config and activation1hr vLAN config and testing1hr Final survey (2 Techs)1hr Documentation & Net Mgmt1 hr Total ($55/Hr)6 hrs = $330 Wiring (If necessary) $400 Enclosure (If necessary) $ 60 TOTAL $790 * Building Architecture and Coverage Complexity will affect labor and material costs.

20 FY ‘07 Wireless Support Costs (Monthly Fee Per Access Point) Cost Breakdown  Hardware depreciation $13  Hardware/software maintenance $ 5  Staff costs per AP $ 9 Subtotal $27 Port charge per AP$6.03 TOTAL$33.03

21 Next Steps NPTF makes rate recommendations. Rate recommendations presented to Provost and EVP. Final FY ’06 rates established. Rates sent to ABA in late December. Rates published in Almanac on December 20 th.

22 Appendix A - Budget Assumptions for FY ‘07 ■ Security concerns continue to be a high priority as various intrusions, compromises, viruses, worms, etc. have reduced Penn’s productivity levels. ■ The work of the Network Funding Committee evaluating alternative billing metrics in lieu of IP addresses for the central service fee will not have an impact on the FY ’07 budget process. ■ Bandwidth management techniques combined with a good Internet strategy have eased the pressure on developing tiered network connectivity options based on usage. However, this will continue to be explored and evaluated as the need arises. ■ Separate SLAs for College Houses and Greeknet for maintenance and bandwidth exist. ■ 5 year phase-out of allocated monies ($2.317M) to occur from FY ■ Telecommunications surplus, operating efficiencies and increased rates to offset allocated cost phase out.

23 Budget Assumptions for FY ’07 (Continued) ■ The FY2006 budget assumed Next Generation PennNet project funding at $700k/year. Funding source is Telecommunications surplus. Funding for NGP is budgeted at $700k from FY ’07 – ’11. ■ No rate increases for existing Telecommunications services in FY ’07. Some Video service rate increase in ’07. VoIP pilot rates are at: ■ For FY ‘07 College House students will continue to be billed indirectly as part of housing fees for baseline PennNet and Penn Video Network services and Wireless. ■ Building entrance and router equipment are on a four-year replacement cycle. ■ Closet electronics and network servers are on a three-year replacement cycle. ResNet moves to a 4-year replacement cycle due to complete wireless connectivity in all College Houses and Sansom Place. ■ Penn will continue to operate MAGPI, the Internet2 gigaPop with primary purpose to help lower Penn’s Internet costs and position for Penn’s likely need in the future for the National Lambda Rail (Internet3).

24 Budget Assumptions for FY ’07 (Continued) ■ The growth rate in IP addresses from the schools/centers is projected to increase by 1000 per year from FY ’06 -’11 with 1200 new in FY ’07. ■ ISC managed wallplates projected to level off from FY’06 –’11. ResNet wall plates to decrease by 2100 in FY ’07. Wireless Access support revenue to replace wired as wireless gets more ubiquitous from FY ’06 –’11. ■ The CSF subsidized approximately 900 wired, public lab connections that have computers attached in FY ’06. Subsidy will continue in FY ’07. ■ The CSF subsidized approximately 1100 wireless public IP connections in FY’06. Subsidy will continue in FY ’07. ■ The NPTF decided to do school-based IP wireless subsidies for FY ’06. Subsidies to be expanded in FY ’07.

25 Budget Assumptions for FY ’07 (Continued) ■ To retain and recruit appropriate N&T IT staff, 3% compensation has been budgeted from FY ‘06 –‘11. ■ In FY2007 N&T’s overhead rate is 51.5% to cover costs of benefits, rent, training, computers, telephones, etc. ■ The NOC will not be physically staffed (7x24x365) through FY ‘10. It will continue to operate from 6 AM – 11 PM, M-F with the rest of the week covered by technical staff on beepers. ■ N&T total expense budget increases from $22.0M in FY ’02 to only $24.3M in FY ’11. (1.1%/year)