General Manager’s Recommended Budget FY 08/09 Public Works Department Total Operating Budget - $12,657,370 Increase of $407,327 or 3.3%

Slides:



Advertisements
Similar presentations
Protecting Public Safety, Public Health, Public Assets and a Special Quality of Life FY08 Town of Sudbury Budget – Article 3.
Advertisements

PUBLIC WORKS DEPARTMENT
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
Budget Presentation Boone County Fiscal Court Fiscal Year
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
Mayor Brandon Smith City Administrator Kimberly Newman Council Members: Chris Cole, Darby Kneisler, Doug Watson, Bill Patterson, Laura Moore.
Public Works Jack Petkus, Director Informational Overview.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Public Works Historical Staffing Levels  PWD Full-time and 5 Part-time  PWD – 22 Full-time and 4 Part-time 
FY07 Town of Sudbury Town Manager’s Budget Request Protecting Public Safety, Public Assets and a Special Quality of Life.
Budget Presentation March 3, 2015 TOWN OF COLCHESTER Fiscal Year
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
2004 SUMMER UNIVERSITY WELCOME !. AGENDA Overview Granger Center Tour Central Heating & Power Plant Tour Grounds Tour Optional - General Services Bldg.
Five-Year Mass Transit Fund Financial Forecast April 6,
FY12 Budget Priorities FY11 Performance Expectations FY12 Strategy for Performance 8/9/
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
PRESENTATION OF FLEET AND FUEL CONSOLIDATION BUDGET AND FISCAL AFFAIRS COMMITTEE AUGUST 31, 2010.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
FY 2015 Budget Workshop Number I 2014 Accomplishments And 2015 Overview.
1 City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 13, 2009 General Fund Capital Improvement Program.
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
2007 Budget Headlines Two Full Time positions reduced to Part Time One Part time position eliminated Effective collective bargaining negotiations – Total.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
The Villages Golf and Country Club 2009/2010 Operating and Reserve Budget Presentation FINAL DRAFT – APRIL 22, 2009.
What does PWD do for our City?. Administrative Services Engineering Operations.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Merger of Mass Turnpike and Mass Highways January 22, 2004.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
BUDGET Compliance With Levy Limits. You are the next contestant on The Price is not Right Cost Controls from Madison have caused major problems.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
General Manager’s Recommended Budget FY 15/16 Capital Improvement Plan Public Works Department Sanitation Fund 1.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
2014 Budget Expenditures City of Knoxville, Iowa Presentation by Harold Stewart, City Manager Monday, February 11, 2013.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
Department of Public Works FY 2015 Operating Budget May 19, 2014.
City of South Gate FY Proposed Budget. Breakdown of General Fund Reserves Category Reserves Results Reserves Reallocation.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
2017 Public Works Budget September 6, 2016 Donald J. Theisen, P.E. Director.
Facilities Management
TOWN OF HUBBARDSTON FINANCIAL FORECAST
City of Charlottesville
Wakefield’s Financial Picture Finance Committee
PUBLIC WORKS DEPARTMENT
CITY OF NORFOLK, NEBRASKA
Department of Public Works FY 2018 Recommended Budget
Town of Mamaroneck 2015 Preliminary Budget
2018 Staffing Recommendation
TOWN OF CHESTER PROPOSED BUDGET
Dana Heiberg, Senior Planner February 5, 2018
City of Saginaw Curb Side Leaf Collection Update
BUDGET DEVELOPMENT FY TOWN OF WAXHAW BOARD RETREAT January 19, 2017
Department of Public Works FY 2019 Recommended Budget
FY 2018/19 Recommended Budget Town of Manchester, Connecticut
Carleton College Facilities Management
Phoenix Public Works Support Services
General Manager’s Recommended Budget FY 19/20
City of East Lansing Budget Discussion FY 16.
Accomplishments of Your City Council Since September 2016
Presentation transcript:

General Manager’s Recommended Budget FY 08/09 Public Works Department Total Operating Budget - $12,657,370 Increase of $407,327 or 3.3%

PUBLIC WORKS Engineering Field Services Highway, Fleet, Parks, Cemetery Facility Management Facility Management, Building Maintenance Building Inspection Administration Sanitation (Enterprise)

PW Administration Overall PW Administration budget down 0.3% Larger portion of Director’s salary shifted to Sanitation fund to reflect greater time commitments dedicated to operation

Streetlights Streetlight budget held flat for 5 th consecutive year The current annual cost of electricity is up approximately $107,000 from 04/05 rates. (Year following Streetlight acquisition) With completion of Chapel/Batson upgrade project and drastic increases in cost of electricity, fully funding Streetlight Reserve Account will take several more years based on current funding levels. (Decision Package) Streetlight Maintenance contract expires and will be rebid this summer for another 5 year period.

Streetlights (continued) Accomplished since acquisition of streetlight system from CL&P in August 2004: Typical response time for streetlight repair approximately 5-10 days, compared to average of 60 days for CL&P Upgraded 70+ lights to improve roadway illumination levels Completed full relamp of system (4,674 lights) Implemented pilot project with new compact florescent technology to test effectiveness and long term maintenance requirements Refurbished all decorative downtown Main Street streetlights and Cheney Hall parking lot lights.

Streetlights (continued) Accomplished since acquisition of streetlight system from CL&P in August 2004 (continued): Began funding $250,000 Streetlight Reserve fund for future system maintenance and capital improvement needs Replaced approximately 25 streetlights on cedar posts at end of useful life. Replacement of cedar posts in neighborhoods will continue in future years based on funding and as need arises. Upgraded streetlight system on Chapel Road and Batson Drive avoiding $240,000 cost to Capital Improvement Reserve.

Engineering Combined W&S and PW engineering staff have been completed one year together at Lincoln Center Budget Increase of $67,393 or 3.3% –No significant program changes Additional saving of approximately $5,650 in various operating accounts due to continued consolidation efforts

Engineering (continued) Performance Measurement Staff is beginning an effort to quantify the Engineering staff time on capital improvement projects compared to projected cost of outside consultants. Goal is to develop measures to evaluate cost effectiveness and benchmarks to assess productivity

Engineering (continued) Town Traffic Signals – (51 existing + 2 planned) Since New or Replaced 7 - Received Modifications or Upgrades 20 - Currently under construction 4 - Funded and under design 45 7 Awaiting decision on federal grant award

Engineering (continued) Annual Pavement Marking Program – 70 Miles (approx) of Streets with Pavement Markings –282 School and Pedestrian Crosswalks –Conditions reviewed annually to implement safety improvements or implement traffic calming measures In 2005 modified the management of pavement marking program to save $12,000 in OT costs

Engineering (continued) Traffic & Street Name Signs –Town maintains a GIS database of every town sign Approx. 8,300 traffic control signs Approx. 1,600 street name signs –Obligation to maintain both signs and pavement markings in accordance with federal MUTCD manual, which is frequently updated. All upgrades, replacements and repairs handled by one Maintainer in Highway division. More needs than capacity to accomplish.

Building Inspection Budget Increase of $28,601 or 3.9% -No significant program changes. Building permit applications and revenue have declined. Number of inspections conducted has remained steady. Property Maintenance inspections up 86% from 2005 FY FY FY FY (July to March 30) Budget continues to include one part-time (20 hr/week) employee dedicated to Property Code Enforcement

Building Inspection (Property Maintenance) Landlord Registration notifications are ready to be mailed in May, as well as an on-line registration created by IS Department staff. Staff is currently working on a plan to address timely removal of debris left at the curb by vacating owners and tenants. Plan not finalized, but most likely would include some up-front costs not included in this budget.

Facilities Management Budget Increase of $115,250 or 7.2% Majority of increase in Purchased Services and Supplies accounts. Increase of $65,336 or 7.1% –$47,615 to fund heating fuel buildings on School Street, formerly maintained by BOE as part of Bennet education complex –$9,688 to address general maintenance needs of aging facilities and custodial services at new restroom facility at Boundless Playground. Overtime has increased $8,000 to reflect recent trend of repairs to aging facilities. Challenge of hiring of new Facilities Manager.

Controlling Costs RECENT ENERGY SAVINGS MEASURES –Locked-in electric generation rates for 5 years –Installation of T-8 fluorescent bulbs (cost $126,000; estimated annual savings $83,000) –CL&P Energy Efficiency Project (2004)- occupancy sensors, lighting efficiencies –All roof replacement projects include significant enhancement of insulation levels –Replace single-pane windows with double-pane thermal-glazed windows to improve heat retention –Programmable thermostats in major Town facilities –Enrollment in ISO-NE Demand Response Program

Facilities Management Intensity of work on schools and other BOE projects for the past several years has impacted the planning and completion of needed Town facility projects. Work planned or Under Discussion for FY 08/09 Emergency Operations Center Building Reuse Committee Library Architectural Plans Youth Service Bureau Needs Ongoing Town wide Replacement/Upgrades Program IOH Pool Upgraded Roof Replacement at Public Works Facility

Field Services Highway, Parks, Cemetery, Fleet Maint. Budget increase of $198,360 or 2.8% $3,866 in part-time salaries to expand hours of graffiti program Combined Purchased Services & Supplies Increase $127,398 or 5.3% –$25,440 to perform leaf collection program with rented vacuum machines instead of tractor-trailers (Statute change request submitted to Legislature) –$50,500 for fuel and diesel to reflect higher costs –$22,086 for snow and ice removal costs (contractors and materials)

Roadway Infrastructure Miles of Roads. (Pavement area equal to 667 Lane Miles, 12 feet wide) 230 Miles of Sidewalks 150 Miles of Storm Pipe 8,500 Catch Basins/Drainage Structures 4,674 Streetlights 24 Parking Lots (Town buildings and Recreation facilities) Trees along Streets, Hiking Trails and in Parks

Field Services Divisions Highway – miles of road, 24 non-supervisory positions – Centerline Miles of Road, 17 funded non- supervisory positions (one frozen) Management Partners report indicated that “further cuts or additional growth will impact the ability to maintain service levels”

Controlling Costs “Total Street” Approach to Improve Efficiency –Coordination of Work with other departments, and outside utilities and state agencies –Street trees reviewed for safety and trimmed –Underground utility work completed or determined to be several years into future –Catch basin structures inspected, and rebuilt as needed – new CB tops and sumps installed. (Materials only ~ $800) –New street name signs and traffic signs installed at completion of project

Park Infrastructure 148 acres of athletic and lawn areas to maintain (areas mowed between two and five times in a two week period during growing season) 29 ball fields 10 soccer fields two football fields 6 outdoor pools 13 playground areas + 5 shared with BOE Dozens of landscape areas at Town buildings, parks and adjacent to roadways

Field Services Divisions Park – non-supervisory positions –2008 – 16 funded non-supervisory positions Since 2000, new facilities include: –Northwest Park, –New State Road –High School –Great Lawn –Bennet Field –West Side Pool/Recreation Area

Snow Operations (Highway Division) 32 plow routes including 2 dead end routes Town dispatches 26 Highway trucks, 6 contractors Four contractors have designated routes Two contractors run tandem with Town forces Each Highway route is approximately 9-11 miles Addition of new subdivisions decreases response time and may create the need for additional routes. Expectation levels from Public and even Public Safety

Snow Operations (Park & Cemetery Division) Plow parking lots – (23) (Town and recreation facilities, and including libraries, Lutz and Cheney Hall) Shovel building walkways and steps Shovel and plow sidewalks along town properties, including sidewalks abutting State property and bridges Cemetery staff plows 5 miles of roadways in 4 cemeteries Cemetery staff shovels and deices for all burials

Field Services Divisions Cemetery –268 funerals performed in 2007 –127 Acres to maintain at East, West, Buckland, and Hillstown cemeteries Mowing grass areas Trimming around monuments Landscaping and tree care Monument resetting Developing new areas in East (nearing completion) and Buckland – Total 70,000 SF Leaf collection Memorial clean up Staff of 4 Maintainers and 3 seasonal workers

Fleet Maintenance Fleet is responsible for repairing and maintaining: Highway Division vehicles and heavy equipment Cars and light trucks for inspection staff (Assessor, Engineering, Human Services, Health, Building Maintenance, Building Inspection, etc) Water Division, Sewer Division Landfill Equipment Fire Department Senior Citizens’ Center vans Parks Division equipment Police Department Board of Education

Field Services Divisions Fleet –Budget includes maintaining a frozen vacant Mechanic II position. Spending on replacement parts has increased Efforts being made to standardize equipment where possible Average age of heavy trucks is 13 years Average age of heavy equipment is 13 years

Vehicle & Equipment Replacement Fund Comprehensive Capital Replacement Plan for Vehicles and Heavy Equipment –Contribution for FY2008/2009 is increases from $400,000 to $500,000 –Evaluation (2005) indicates annual investment of $750,000 required to gradually eliminate deferred replacements and address future needs Examples of Trucks and Heavy Equipment and typical replacement cost: –Loader - $150,000 –Six Wheel Dump Truck - $140,000 –10-Wheel Dump Truck – $190,000 –Backhoe - $150,000 –Large Mower - $70,000

Controlling Costs /Environmental Changes Implemented to Control Fuel Costs –No Idling Policy –Carpool to job sites whenever assignments and equipment needs allow –Vehicle purchases take into consideration fuel efficiency –CT Clean Fuel grant for hybrid cars – 2008 application to be submitted this month for 3 vehicles –Technology exists on new diesel engines resulting in significantly less particulate emissions

Non Funded Maintenance Concerns Long-Term Maintenance Concerns: –Repairs and Maintenance to HRLP Trail System Significant time, but restricted capabilities of Committee Major repairs needed due to flooding and natural changing of Hockanum River banks. Damage to boardwalks very costly and difficult to repair. –Town needs to give serious consideration to major renovations to existing pool facilities Some Pool Mechanical Equipment no longer available Sandblasting required ($35,000 to $40,000 each pool) Accessibility and other issues at bath houses