1 Session 20 Just-in-Time Systems Toyota’s JIT system –JIT elements –Kanban cards –Kanban system rules –Two card and kanban system rules –Toyota MPS policy.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.
Session 8 Master Production Scheduling (MPS) – Managing the MPS lecture session 7 Example.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Master Production Scheduling
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Inventory Management for Independent Demand
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
Material Requirements Planning
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Just-In-Time Chapter 3.
1 Session 19 Just-In-Time Manufacturing JIT Impact on the MPC System JIT Continuous Improvement –JIT Building Blocks –Elements of JIT Kanban Systems –Single.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Session 12 System Transactions
JIT – Just-In-Time Production
Session 10 Material Requirements Planning pom
Operations Management Material Requirements Planning
Just-in-Time and Lean Systems
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
CHAPTER 7 Managing Materials Flow. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 7-2 Materials Management.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Advanced Concepts in Material Requirements Planning Chapter 11.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles July 2000.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Inventory Management for Independent Demand Chapter 12.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
Resource Planning Chapter 15.
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Material Requirements Planning Chapter 2. MRP in MPC.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Manufacturing planning & control : Integration of MRP & JIT Prepared by: Ankit P. Sarvaiya (09CAD14)
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Facility Inventory Old Facilities Modern Facilities Classroom Size
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Integrated MPC Systems
Chapter 16 Materials Requirements Planning
Material Requirements Planning and Enterprise Resource Planning
Chapter 5 Master Production Scheduling
CHAPTER 14 MRP and ERP.
MODERN TRENDS IN PRODUCTION ENGINEERING
Chapter 14 Dependent Demand
Presentation transcript:

1 Session 20 Just-in-Time Systems Toyota’s JIT system –JIT elements –Kanban cards –Kanban system rules –Two card and kanban system rules –Toyota MPS policy JIT in purchasing JIT modifications to MRP Planning Impact of the kanban system Concluding principles

2 Toyota’s Production system

3 Kanban Cards

4 Kanban System Rules Each container of parts must have a kanban card. The parts are always pulled. The using department must come to the providing department and not vice versa. No parts may be obtained without a conveyance kanban card. All containers contain their standard quantities and only the standard container for the part can be used. No extra production is permitted. Production can only be started on receipt of a production kanban card. Container sizes are kept small and standard, e.g., no container should have more than 10% of a day’s requirements.

5 Flow of Kanban Cards

6 Toyota MPS policy One year production plan MPS is a three month final assembly schedule MPS first month is frozen MPS stated in daily buckets The daily schedule is equal for each day in the month A level, stable MPS schedule is critical

7 JIT Purchasing Stable schedules critical Prune the number of vendors Don’t shift the burden of inventory to the vendors Help vendors implement JIT in their operations Keep the relationship with vendors simple

8 JIT Modifications to MRP Planning Develop the MRP record for the faucet subassembly (part no. 356) shown in the following bill of material. The refrigerators are assembled at the rate of 480/period, lead time is one period. there's no safety stock, lot size is 500, and 200 units are in inventory at the moment. (Note: The faucet subassembly is only used on every fourth refrigerator.)

9 Faucet Subassembly MRP Record

10 Phantoming Suppose that the faucet subassembly has been “phantomed” (i.e. the faucet would be assembled onto the refrigerator directly from the bracket, faucet, and tubing parts). a.What would the bill of material look like now? b.Construct the phantom MRP record and compare it to the initial MRP record for this item. c.Construct the MRP record for the bracket (lot size = 200 no safety stock, 250 on hand, lead time = 2 periods).

11 Faucet Subassembly– “Phantomed”

12 Faucet Subassembly– “Phantomed” b.MRP record for facet subassembly, Part No. 356, as a phantom bill of material.

13 Faucet Subassembly– “Phantomed” c.MRP record for Bracket

14 Impact of the Kanban System The Bragg Company is considering implementing a JIT program using kanbans to signal the movement and production of product. They want to evaluate the cost savings in inventory investment for a sample component. Their current production philosophy calls for producing 5,000 units at a time and the average usage is 200 units per day. They are considering using kanbans with a container size of 100 units, no safety stock, and manufacturing lead time is 10 days. The cost of the sample component is $140.

15 Impact of the Kanban System a.What is the company's current investment in WIP? (Assume average inventory is Q/2.) Unit cost$ Lot Size (Q)5000 units Q/2 x $ = 5,000/2 x $ = $350,000

16 Impact of the Kanban System b.What will be the company's investment in WIP if it goes to the proposed JIT system? What is the percentage decrease or increase WIP investment? Lead Time10 days Unit cost$ Usage 200 Container Size 100 Safety stock 0 Kanbans kanbans x 100 units x $140.00= $280, $350, $280, x 100= 20% $350,000.00

17 Impact of the Kanban System c.Process engineers have told management that they can reduce lead time from 10 days to 5 days if they convert to the proposed JIT system and spend $100,000 on process improvement. Is it worth the additional investment compared to part b? Lead Time5 days Unit cost$ Usage 200 Container Size 100 Safety stock 0 Kanbans kanbans x 100 units x $ = $140, (vs. $280,000 for 10 day LT) Since it cost $100,000 to make the improvement which will lead to a $140,000 reduction in WIP investment it is worthwhile.

18 Concluding principles Stabilizing leveling the production schedules are prerequisites to effective JIT systems. Achieving very short lead times supports better customer service and responsiveness. Reducing hidden factory costs can be at least as important as reducing costs more usually attributed to factory operations. Implementing the whole person concept reduces distinctions between white- and blue-collar workers and taps all persons' skills for improving performance. JIT is not incompatible with MRP-based systems. Firms can evolve toward JIT from MRP-based systems, adopting JIT as much or as little as they want, with an incremental approach.