MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
James Richmond09/09/20101 CLIC Permanent Magnet Quadrupole - Proposed Mechanism Prepared by James Richmond Presented by Norbert Collomb STFC Daresbury.
Vacuum Vessel Production Readiness Review
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Fasteners, Powers Screws, Connections
Screws, Fasteners, and the Design of Nonpermanent Joints
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Progress on the MICE Cooling Channel Solenoid Magnet System
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
JLAB CLAS12 Torus Structure The cold mass is composed of 6 coils, each inside a coil case, joined together at the inner radius by a hub and at the outer.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Skru Kuasa A power screw is a device used in machinery to change angular motion into linear motion Usually it is used to transmit power E.g.. Lead screw.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Cavity support scheme options Thomas Jones 25/06/15 1.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
TUNERS FOR SRF CAVITIES A Comparative Study – Mechanical Characteristics Presented by N. Dhanaraj.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
NSTX TF outer leg analysis Because the stress on umbrella structure is too high, there are some ideas to reduce it, like adding a case to enhance the stiffness.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Design ideas for a cos(2q) magnet
Status of the PANDA Magnet mechanics (yoke & cryostat)
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Step IV - Engineering Jason Tarrant – Integration Engineering
SiD Solenoid Status and Plans
FRESCA2 Update on the dipole design and new calculations
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Step IV - Engineering Jason Tarrant – Integration Engineering
Fasteners, Powers Screws, Connections
326MAE (Stress and Dynamic Analysis) 340MAE (Extended Stress and Dynamic Analysis)
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Cryomodule Assembly Plan
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Challenges and Deadlines for Production
Fasteners, Powers Screws, Connections
Simplified Procedure Draft
Presentation transcript:

MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake

Complete Assembly

General Arrangement of the cold mass support system

An Overview of AFC Unit 1.Cold Mass –Bobbin –G10 Insulation –Focusing Coils –Cover Plate/Mounting brackets for Cold Mass 2.Copper Shield 3.End Plates and Cylindrical Core 4.Cold Mass Support System 5.Warm Vessel

BobbinG10 InsulationFocusing Coil Bobbin with G10 Insulation and Focusing Coils Coil Cover Plate with Cold Mass Support Brackets Cold Mass

Copper Shield

End Plates and Cylindrical Core

Cold Mass, Support System and the Warm Vessel

Section View of the Complete Assembly

Cold Mass Support System 4 sets of Links anchored to the Cold Mass and Outer Casing to carry an Axial load on Cold Mass of 200 KN. Each link is pre- tensioned to 50 KN when cold. Each pair of links is skewed relative to each other to provide torsional stiffness Each Link is made of 2 Glass fiber Epoxy (E-Glass) links and one stainless steel link cooled to 50 0 K. All the links and the cold mass support system are linked through stainless steel pins. Anchor point on the outer casing includes a mechanism to pre-tension the links and help to align the cold mass accurately

Arrangement of the links to provide Torsional Stiffness Vertical Plane 45 0 Plane

Warm Vessel/ Outer Casing

Components of the Cold Mass Support System E-Glass Straps Stainless Steel Block Stainless Steel Shear Pins Integrated Tensioning Device/ Anchor on warm vessel End Cap Mounting Bracket for Cold Mass Support

Complete Link

E Glass Strap Stainless Steel Block

Components of the Integrated Tensioning Device/ Anchor on warm vessel The device also prevents twisting of the link during the tensioning operation.

Mounting Brackets on the Cold Mass

Integrated Tensioning Device/ Anchor on warm vessel End Cap welded to form a vacuum tight joint.

Pre -Tension Control T = 0.2 F i d p T – Torque in N-m F i – Tension in support link KN d p – pitch diameter of thread mm Tension KNTorque N-m Example

One turn of the nut moves the screw (cold mass) through one pitch. Pitch of screw = 2 mm Therefore one turn of the nut moves the corresponding mounting point of the cold mass through 2 mm Position Control of Cold Mass A table showing the relationships between angular and radial positions of the cold mass centre line and rotation of the adjustment nuts will be compiled. This can be used during the assembly/ setup

Summary statement The design on the Cold Mass support system is adequate to take on the imbalance magnet force while allowing independent adjustment of the position of cold mass Further work Dip in the vessel shell under tension load: Manual calculations indicate a deflection of 0.5mm. A FE analysis will be done and the anchor points will be strengthened locally if necessary Shrinkage during vacuum: Would this shrinkage reduces the pre-tension load? Table of the adjustment of the individual cold mass support link to the positioning / alignment of the magnet. These will be ready by the next collaboration meeting in October.