ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Underfrequency Load Shedding Report
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
ERCOT Under Frequency Load Shed Testing
STUDENT ORGANIZATION Returning Organization Recognition Packet Please review these guidelines to assist organization officers in completing the requirements.
Ted Hailu Director, Client Services Market Notices.
Random Moment Time Study (RMTS) Coordinator Training Summer/Fall 2014
5 th Grade Camp Meeting September 19, Agenda (Timebox) Background (2) Brainstorming Session (15) Compile and Discuss Fundraising Ideas (20) Next.
RP 3 Webinar Series: Safety Overview of the RP 3 Safety Checklist Friday, April 25, :00pm – 2:00 pm.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
ERCOT 2013 Winter Storm Drill (WSD) Summary Brian Barcalow Training Specialist, Sr.
Overview.  Accreditation is both a status and a process  Status:  Status: Accreditation provides public notification that standards of quality are.
Request must be submitted a minimum of 5 working days prior to event. Do not promote event until confirmation is received. Any questions or assistance.
April 23 rd OWG UFLS Survey & Power Factor Review.
WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
ERCOT Generation Adequacy Study TAC Meeting February 7, 2002.
ERCOT 2014 Hurricane Drill (HD) Summary Brian Barcalow Training Specialist, Sr.
Updating your center profile and compliance information online The center's primary contact and executive director each have access to center account information.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Partnering for the Future WIEG Meeting September 16, 2010.
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Retail Market Subcommittee Visibility into OGRR219.
1 TDTWG Update to RMS TDTWG Thursday, March TDTWG TDTWG has continued work necessary to further support of the NAESB EDM V1.6 Project Work primarily.
ERS Update – DSWG Presentation September 21, 2012.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Tax Administration Diagnostic Assessment Too l PREPARING FOR A TADAT ASSESSMENT.
November 3, 2015 RMS Review of RMS Member Responsibilities and Voting Structure Suzy Clifton.
1 Browser Compatibility Assessment June 2 nd, 2015.
Emergency and Other Event Communications ERCOT Board of Directors Richard Gruber, Director of Market Services Paul Wattles, Manager, Governmental Relations.
Project Underfrequency Load Shedding PRC-006, 007 and 009 Bob Millard ReliabilityFirst staff Reliability Standards Workshop April 29-30, 2008.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Market Notice Communication Process Ted Hailu Director, Client Services CSWG October 26, 2015.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Transition Plan Network Operations Model Change Requests 5/26/2010.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
Accreditation (AdvancED) Process School Improvement Activities February 2016 Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator of.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
New Mexico Highlands University
Nunavut Wildlife Research Trust and Studies Fund March 2015.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)
Ajay Pappu Resource Integration Department ERCOT Generator Frequency Relay Settings Survey Dec 2013.
EI Colorado TA Call: State Updates,Telehealth, Bridge Training, Reports & EI Database End of Year Cleanup August 4, 2016.
ERCOT Update on UFLS Annual Survey with TSP/DSP Gene Lowrie Reliability & Compliance Eng Sr. July 2016.
UFLS Survey Explanation
UFLS Workshop Discussion #3
Annual IRA Budget Workshop and Information Session
Business Continuity Plan
PERL 2 – Procedural Changes
Cobb County Nonprofit Grant Process FY 17/18
Consolidated Application Compliance Report training Title III
NPA 306/639 (Area Code) Relief in Saskatchewan
NPA 450/579 (Area Code) Relief in Quebec
NPA 403/587/780/825 (Area Code) Relief in Alberta
Space Survey Training 2019.
Presentation transcript:

ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014

2 ERCOT coordinated and conducted an annual survey on May 13, 2014 with the TSPs and DSPs to ensure that the required automatic under-frequency load shed circuits were configured to provide the appropriate load relief in an under-frequency event as required by table below from Operating Guides 2.6.1(1) Requirements for Under-Frequency Load Shedding: Background on UFLS Survey Requirement

3 Below is a list of dates and activities reflecting the timeline and coordination of this survey: 04/23/ ERCOT announcement of survey timeline and effort to OWG 04/10/ ERCOT notification sent by Client Services to TSP/DSP Authorized Representatives 05/13/ Survey test day 06/13/ Survey results due back to ERCOT September/October- Results compiled and being reported to OWG/ROS/TAC Results of UFLS Survey Requirement

4 The results of the requirement were successful and are reflected below: Execution of UFLS Survey Requirement Frequency response block Minimum Requirement Survey measurement Block 1 response at 59.35%6.7% Block 2 response at %11.3% Block 3 response at %11.8% Total25%29.8% ERCOT Reliability and Compliance contacted several participants to request that the 5%, 10%, 10% breakdown be adhered to, if possible. Some participants met the 25% total but had more load in the 5% or one of the 10% brackets and not quite 10% in the other bracket

5 Execution of UFLS Survey Requirement The survey submitted by the participants indicated that they all could meet the 25% minimum requirement. Some participants met the cumulative 25% total by having more load in one bracket but not the minimum amount in another bracket. The load was reallocated to different relays to meet this minimal requirement of at least 5%, 10%, 10% in each bracket.