Safer façade Connections - Revolutionary Changes World of Fa çade s – Ahmedabad – Oct. 2012 Bhisham Vaswani.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Contents: Cover
FVCC Fire Rescue Forcible Entry.
The Must-See event for the World of Architecture and Construction MADE expo is the Italys leading international architecture, building and construction.
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Pipe Supports and Hangers
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Mag Hansen - Hansen UnitAl Presentation Hansen UnitAl Hansen UnitAl a unique system for prefabricated elements.
Flood Control America presents The Invisible Flood Control Wall ™
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Handrail Assembly and Steel Stairs. Handrail Terminology u Guardrail –top most rail on balcony –higher than handrail u Vertical Rail –members between.
Engineering Overview Presenter’s Name
Reconstruction of the Eads Bridge Highway Deck
Fort McCoy Safety Industrial Operations Program Ladder Safety June 2002.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
General idea of a couple of check rod system and adjustments
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
BEAMS,COLUMS AND LINTELS
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Fall Hazards.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
Electrical stations, switch rooms and server rooms
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
The Invisible Flood Control Wall ™ Flood Control America presents.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Moment Connection Requires Bolts Outside the Flanges
1. By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. CE-401 Reinforced Concrete Design-II Design of Stair cases.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
Competency: Draw exterior elevations
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Company Confidential CABLOFIL ® New Products 2007 / 2008.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
SUBJECT - Technical Terms OF Doors And Types Of Doors.
FIXING the WORLD Technical Training. 1. Definition. 2. Working Principles. 3. CE Marking 4. ETA´s. Technical Training Iván Martínez Contents.
VIEW SERIES with Sliding Door
YOUR BEST CONNECTIONS All parties concerns and interests combined
Planning for Proto-DUNE PD Installation and Cabling at CERN
Architectural Symbols
Introduction Signing for Interchanges Naming Convention
Hailo US Tower Equipment Manufacturer
Mechanical Weighbridge
CreaZen® Decorative Railing System
Structural Fire Engineering, October 2015, Dubrovnik, Croatia
Architectural Drafting
Fall Hazards.
1C2 Conceptual Design of Buildings
MATERIALS AND CONSTRUCTION I
Arch205 Material and building construction 1 floor & Roof systems
Competency: Draw exterior elevations
Arch205 building construction wall systems- Steel
Arch205 building construction Windows- glazed curtain wall, skylights
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Fall Hazards.
Shipping and Transport College Rotterdam
TOLMAN HALL RETROFIT POSSIBILITIES
Suryoday Technologies ISO 9001:2015 Co.
Filcoten vs. Polymer Trench Drain
ROOFS.
Bunker Wall Design Wall ESS
LIFT,ESCALATOR AND MOVING WALKS
Fall Hazards.
Chicago Clamp Company Manufacturing Structurally Sound and
Presentation transcript:

Safer façade Connections - Revolutionary Changes World of Fa çade s – Ahmedabad – Oct Bhisham Vaswani

Misunderstanding Different opinion Fear …

Changes... Free of Cost

Changes...

Change is the pre-condition for growth! Why do we fly today and not travel to other destinations for meetings or holidays by cycle or bus anymore? Why do we not take two stones at home and light fire? There are three very simple answers to the above

Changes... TIME SAFETY QUALITY COST Three points that help make our facades simply the best! This goes for all the products and services used in facade!

Connecting the Facade CW can be fixed by drilling bolts into the concrete OR by welding as seen in the picture above BUT…

Connecting the Facade Time?

Quality & Safety of Façades Safety?

Connecting the Facade Safety?

Connecting the Facade Quality?

Solution What we require are two simple steps in order to avoid the above: 1.Pre-planning 2.Higher initial procurement cost Result will be 1.On time or before time completion of project 2.Lower total project cost 3.Best possible qualitative and safer facade

Planned Project

Solution – Cast-in Channel One of the many solutions for the above is HALFEN Cast-in Channel

Cast-in Channels ANIMATION

Channel Profiles Hot rolled anchor channels type HTA

Channel Profiles Cold formed serrated anchor channel type HZA 41/22

Channel pairs Corner elements HTA / HGB Special constructions for special applications Channels with welded-on reinforcement bars Channel Types

Curtain wall glass element HTA channel (located top of floor slab) Curtain wall bracket Channel Application – Top of Slab

HTA channel for horizontal adjustment parallel to concrete edge basis angle of Halfen curtain wall bracket type HCW-B2 for horizontal adjustment perpendicular to concrete edge Connecting part to mullion (part of bracket type HCW-B2)for vertical adjustment

Channel Application – Face of Slab Horizontal HTA channel positioned front of floor slab Halfen curtain wall bracket type HCW-ED Three way adjustment provided using HTA cast-in channel together with HCW- ED aluminum bracket

Other Applications of Channels Fixing of Guide Rails and Doors in Elevators Fixing of Seats in Stadiums Hand Railings MEPs in all various buildings and tunnels Machinery fixing Facade Cleaning Scaffolding Etc.

Other Products of HALFEN for Façade Grout-in Anchor Body-Anchor Channel Sub-Structure Natural Stone Support Systems

Tension Rod Systems  Tension rod system DETAN with several couplers  Tension rod system DETAN with several “couplers with lug“ Other Products of HALFEN for Façade

Concrete Facade Panel Anchor Systems Other Products of HALFEN for Façade

HALFEN references of Pre-planned projects in India World Crest, Mumbai Client - Lodha Façade Contractors - Aluplex No. of Cast-in Channels – Approx 90,000

HALFEN references of Pre-planned projects in India QC 1 Gandhinagar, GIFT CITYQC 2 Gandhinagar, GIFT CITY

Shapath V, Ahmedabad HALFEN references of Pre-planned projects in India

Mahatama Gandhi Exhibition & Business Centre, Gandhinagar, Gujarat

Planned

HALFEN references of Pre-planned projects in India ICICI Bank Building, Hyderabad

HALFEN references of Pre-planned projects in India The Kohinoor - Mumbai

HALFEN references of Pre-planned projects in India The Capital, Mumbai

HALFEN references of Pre-planned projects in India Four Seasons Hotel, Mumbai

HALFEN references of Pre-planned projects in India Ahuja Towers, Mumbai

HALFEN references of Pre-planned projects in India Godrej One, Mumbai

And many more… & To sum up the presentation…

HALFEN Cast-in Channel :- Only simple tools needed for installation. Can be installed without power supply. Easy and fast to install without special training. Components protected from corrosion by quality galvanizing and plating. Easily adjustable connections. Fully tested components with verified load capacities. Instant loading without waiting for a chemical resin anchor to harden. Drilled Bolt Summary HALFEN = A to Z Project Support including Pre- and Post Sales Services!!!

Let‘s Pre-plan!

YOUR BEST CONNECTIONS Thank You…

Mr. Satya SahuArea North and West (0) Mr. Sree KumarArea South (0) Mr. Mahesh Sawant Area West (0) Contact Our Sales Managers