Mech assemblymay 20001 MuTrFEE Assembly Procedure Mechanical.

Slides:



Advertisements
Similar presentations
Final(?) Design of G0 Upstream Shielding Larry Bartoszek BARTOSZEK ENGINEERING 10/22/05.
Advertisements

Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Heavy Concrete Construction Formwork
Pipe Supports and Hangers
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Installation. Indoor Unit Installation Typical Installation.
Automotive Steering, Suspension and Alignment, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
STEERING COLUMNS AND GEARS
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Vacuum system.
Design Progress Allen Ellis 18-September
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Annex 4 - Moving Frame and Whiffletree assembly
Baby-MIND Modules & Services
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Design of the Injection Can
MICE Partial Return Yoke Mechanical Design
NP04 CPA/FC/HV Interfaces
First of all we will remind some numbers:
Hawkeye Mechanical Design Snapshot
2.2 Gallon TourTank Installation
C Air Compressor Up-fit and Plumbing Guide For LDI B3
Husky Injection Molding Systems
Additional Upstream Coil Shielding
as a prototype for Super c-tau factory
Presentation transcript:

mech assemblymay MuTrFEE Assembly Procedure Mechanical

mech assemblymay SUMMARY Chassis assembly Sub-assemblies of Major component Assembly of FEE cross beams FEE structure assembly –ASSEMBLY ORDER –CABLE ROUTING Eyebrow installation

mech assemblymay FEE NOMENCLATURE –components Main Beam: 7”aluminum channels running in Z direction at octant boundaries Cross beams:6” Aluminum channels running perpendicular to main beam axis. Manifold:Inside distribution device for water and air Spoke:Radial member at sta2 that supports the Main beam Spoke Tab:Mounting bracket for the spoke located in the piston groove. Spoke Brace:Member between spokes ChassisFEE cathode housing Amp House:FEE anode housing Amp house mounting beam:channel at detector octant boundary used to mount the Amp House Main Beam Assembly:2 main beams joined back to back plus misc hangers. Cross Beam Assembly:unit comprised of cross beams, chassis, manifolds, HV box, etc Spider Assembly:spokes and spoke tab at sta2 used to provide radial support to the Main Beams Spoke assembly:2 Spokes joined back to back plus misc hangers.

mech assemblymay Spoke assembly Main Beams FEE chassis Cross Beams

mech assemblymay Cathode Chassis assembly Reference dwg #10Y sheets 1-14 general description –cold plates, air & water flow path, pcb extraction, electrical isolation, back plane. Assembly –cold plate, pcb, clamp assembly, chassis‘square-ness’ reqmts, bolt torque, hose fittings, cable holder

mech assemblymay FEE Sub assemblies Spoke assembly 10Y – consists of 2 spokes, 2 spoke spacers, spoke anchor, bolts –note spacer orientation –install -7 bolts before -6 bolts at spoke anchor – -5 bolts installed from both ends of spacer –torque to values shown

mech assemblymay FEE Sub assemblies Main Beam Assembly 10Y –Main Beam Assy consists of 2 main beams, -4 spacer,-3 mounting bracket, { race hangers, and cable clips not detailed} –mid beam thru holes {sets of 3} used for hangers & clips –use dowel to align holes at spoke attach side. –Rework assy has specific location

mech assemblymay FEE Sub assemblies Cross beams assembly 10y chassis, manifolds and plumbing. –Manifolds are specific to sta2 or sta3 –Mid manifold is for air –do not route “stuff” across alignment beam path –route hoses to chassis thru cross beam holes –holes on beam flanges not used except if needed for hold-down.

mech assemblymay FEE INSTALLATION general information ASSEMBLE PER 10Y Protective covers installed on detectors For port and octant locations see figure 1 Start assembly at bottom-then work up. Review utility of Scaffold Cables and service connections routed to the racks are attached to cross beam sub- assemblies.

mech assemblymay EYEBROW Figure 1 Octant number Port number

mech assemblymay ASSEMBLY Cable port to back plate Spoke assembly to piston Spoke brace Mainbeam assembly Cross Rib assembly sta2 then sta3 Cable and Hose connections

mech assemblymay Cross brace 1 Cableport Beam Mount 2 SPOKES 6 cross beams 5 cross beams 4 Main Beams

mech assemblymay Remove cross brace 6 5 4

mech assemblymay Assembly philosophy assembly one type component in all octants, i.e. Install all mainbeams then proceed to crossbeams. [piecemeal] –Positive=frame is protected from misc loads –Positive=easier closure of frame OR finish all installations at bottom and work around to top, i.e. finish each octant completely before proceeding to next. –Positive=more maneuver room

mech assemblymay Cableport Main-Beam Mount Bracket INSTALL per dwg 10y attach Cableport dwg 10y to the back plate –use 3/8-16 x 1 1/8 long socket head bolts –1/2” dia holes in bracket allow for alignment –do not apply torque to attachment bolts

mech assemblymay Spoke assy to piston INSTALL per dwg 10y Attach spoke assembly 10Y to piston use 3/8 -16 x 2 1/2 in long bolts Dia bolt holes through anchor allow for alignment do not torque bolts to spec

mech assemblymay Spoke braces --ASSEMBLY -- INSTALL per dwg 10y Install spoke braces 10y –use 1/4 -20 bolts –braces provide stability to spokes –used as assembly tool only –will be removed

mech assemblymay Mainbeams to spoke and cableport Install Main Beam Assy per dwg 10y –start assy at bottom octant –attach to the beam mount bracket. –Attach to spokes Rework assy has specific location. [Voltage bus bar routing]

mech assemblymay Cross ribs Install sta2 crossribs [stiffens frame] Install per dwg 10y –place beams in a position ‘downstream’ of final bolt on location. –Move beams upstream to align 4 ea 3/8 dia. mounting bolts. 1/2 inch Slots allow adjustment engage threads in mainbeams do not torque bolts install all octants

mech assemblymay Cross ribs Sta2 continued: –install all octants IF CLOSURE PROBLEMS –Adjust {Beat and Bash} components into place –slide crossbeams up or downstream Install sta3 cross beams NOW TIGHTEN ALL BOLTS.

mech assemblymay Main beam assembly Spoke assembly Main beam mount Spoke brace Spoke tab

mech assemblymay CABLING Starting at bottom [6 o’clock] Octant –route cabling to port location ‘D &F’ route cabling through holes at ends of crossbeams contain cables inside the mainbeams using clips to bolt holes in beams bolt holes provided in side plate of the cableport/mainbeam bkt for cable holddown. NEED CABLE PROTECTION FROM LAMPSHADE

mech assemblymay CABLING Detector cabling –limited space 4” at sta2 downstream det. –avoid cabling through alignment beam path –good luck

mech assemblymay Octant at bottom eyebrow

mech assemblymay Station 1 ASSEMBLE PER 10Y assemble in-situ mount chassis to plate mount manifold assy to plate

mech assemblymay Installation notes Using piecemeal assy routine may allow for extended use of scaffolding Stow cross rib cabling within the beam height Don’t walk on chassis May need protection cover plate for crossbeams chassis –holes on flanges of cross beam can be used to mount a plywood shield crossribs weight is approx 100 pounds pay attention to bolt torque values remove Spoke brace- remove Spoke brace install HV bus bar: attach guide bracket to cross rib flange holes

mech assemblymay TESTS WATER /air circulation flow tests check alignment beam interference

mech assemblymay Hydraulics Hose and fitting dwg callouts are obsolete due to psi change. use: Material Nylon 11, 250 psi rating –1/8” id: hose from Omega#TYNY –3/8 id.: hose from Omega #TYNY –1/2 id hose :braid reinforced flexible PVC tubing # TYRP 3412

mech assemblymay Hydraulics Station 2-3 plumbing per 10y Station 1 plumbing per dwg 10y –distribution of air and water inside the magnet from manifold to chassis uses 1/8 id dia hose –water into the magnet uses 3/8 id hose except 1/2” id hose used for delivery to station1 water flow rate: 0.25gpm/chassis air flow : 5.2 SCFM

mech assemblymay Hydraulics Fluid flow is determined by hose and orifice size –water metered by 1/8” id hose –air metered by 0.04 orifice at chassis water psi at input regulated at 50psig air psi input at 20psig