Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.

Slides:



Advertisements
Similar presentations
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Amsterdam, April 2,2003P. Colas - Micromegas TPC1 Micromegas TPC: New Results and Prospects New tests in magnetic fieldNew tests in magnetic field FeedbackFeedback.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Zeuthen, January 16, 2008 P. Colas - LP cosmic trigger 1 The cosmic trigger for the Large Prototype Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Micromegas Panels LP electronics P. Colas. Foreword We aim at 1 single system –Same DAQ : easier comparison, less duplicate work We have to keep in mind.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
Annual Meeting – October 8, Status of the CEA Saclay R&D activities on pixelised readout of TPC David Attié, Paul Colas,
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Annual Meeting 2008 – October 6 th 1 David Attié P. Colas, X. Coppolani, E. Delagnes, A. Giganon, I. Giomataris Status of Saclay.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
December 5, 2007 P. Colas - LP cosmic trigger 1 The cosmic trigger for the Large Prototype Th. Chaminade, P. Colas, K. Dehmelt, G. De Lentdecker, X. Janssen,
Micromegas (Ingrid)+TimePix 8-chip modules
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
MPPC Test Setup Alam Toro S. 1. Objective Characterize main variables in ideal conditions To provide a setup to characterize multiple devices To provide.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Micromegas projects and future tests Phone meeting August 26th, 2009.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, Y-H Shin S. Turnbull, R. Yonamine (Carleton, KEK, Saclay)
Baby-MIND Modules & Services
Calorimeter Mu2e Development electronics Front-end Review
Micromegas modules achievements and plans
LP cosmic Trigger Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y. Kato, H. Kuroiwa, Y. Kudenko,
cooling and supports of the forward endcap EMC
Large Area Endplate Prototype for the LC TPC
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Power pulsing of AFTER in magnetic field
TPC electronics for ILD
TPC Large Prototype Toward 7 Micromegas modules
Recents Analysis Results From Micromegas TPC
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
TPC chamber for Medipix2/TimePix
EUDET Extended SC meeting 31 August 2009
News from Micromegas modules
NPS mechanical design 11/13/2018 Jlab meeting
The cosmic trigger for the Large Prototype
Covering a Large Area ILC-TPC endplate
After service guide for changing PCB
News from Micromegas modules
Presentation transcript:

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger Th. Chaminade*, P. Colas*, C. Coquelet*, K. Dehmelt, G. De Lentdecker, X. Janssen, M. Karolak*, Y. Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre*, J.M. Reymond*, M. Riallot*, F. Senée*, S. Turnbull* *

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 2Franck SENÉE LP-TPC: Micromegas Panel and Cosmic Muon Trigger Micromegas panel: -Details of Printed Circuit Board -Mechanical group -Flat cables -Proposal for an assembly without the weight of electronics on the endplate -Mid 2009 Cosmic muon trigger: -Mechanical group with 5 slabs (top), similar bottom -General implantation Schedule of installation at DESY

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 3Franck SENÉE Micromegas Panel: PCB C1: Pads layer C6: Connectors layer Stacking C1/C2: Insulation layer The layers of insulation are Nelco 7000 (Polyimide:Glass Transition Temperature = 260°C): necessary for the resistive layer 24 lines of 72 pads: 1728 pads with 2 used for supplier the HV to the grid. Routing in progess. 18 connectors of 80 pins:4 are used by FEC HV

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 4Franck SENÉE Module Back Frame (D. Peterson) Module Mounting Bracket (D. Peterson) Micromegas Panel: Mechanical group PCB Gluing

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 5Franck SENÉE Micromegas Panel: Connection between PCB and FEC card with flat cables The longest=200 mm, the shortest=120mm Flat cables will be ordered soon FEC + shielding

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 6Franck SENÉE Micromegas Panel: Proposal for an assembly on the endplate Step 4: Continuation of the assembly of mechanics support of electronics Step 6: Wiring of the flat cables on the micromegas panel Step 9: All the FEC board are wired Step 10: Assembly of shielding outside and top parts support of electronics on the outside of the endplate Step 12: Disassembly of mechanics support of electronics on the module mounting bracket. The electronics is now fixed on the outside of the endplate Step 11: Wiring of mezzanine board Step 1: Assembly of the module mounting bracket on the endplate Step 2: Installation of the module back frame Step 3: Assembly of mechanics support of electronics on the module mounting bracket Step 8: Continuation of wiring flat cables on the micromegas panel and the FEC Step 5: Assembly of bottom parts support of electronics on the outside of the endplate Step 7: Wiring of the first FEC

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 7Franck SENÉE Micromegas Panels: 7 panels mid 2009 Where to fix all it elsewhere that on the endplate? New electronic design

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 8Franck SENÉE Cosmic Muon Trigger: 5 slabs group (top) Mechanical assembly in progress One box for slabs group with: - Temperature control (bar copper and heat pump for Peletier effect) – Readout circuit (adder and amplificator)

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 9Franck SENÉE Cosmic Muon Trigger Slabs received on February 11 Wrapping finished OUT MPPC1 OUT MPPC2 OUT (MPPC1+MPPC2)x45 Amplificator: Gain=45 MPPC1 MPPC2 Power supply MPPC Tests in progress

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/ Franck SENÉE Micromegas Panels: General implantation To raise the PCMAG frame of 14cm to put the bottom slabs set

Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/ Franck SENÉE Mid March: Mounting mechanic of 3 set slabs for cosmic muon trigger, Testing temperature control at Saclay April: Testing cosmic muon trigger setup at Saclay April: Testing of the first micromegas panel at Saclay with resistive layer May: Complete Installation (Cosmic muon Trigger + Micromegas panel) at Desy Schedule of installation at DESY