Some cryostat scintillator slides for Monday’s meeting Michigan State University.

Slides:



Advertisements
Similar presentations
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Stefano Lami 1CSN1 - Sep 24 th, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors based on scintillator.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Stefano Lami 1Rockefeller Meeting - Nov 3 rd, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Start Counter Construction Update Eric Pooser 08/21/2014.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
PHOBOS TOF Construction Status
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.
ALICE high p T workshop, LBNL, April 7, 2009 (T. Chujo) J-Cal Construction Plan Tatsuya Chujo University of Tsukuba (for the ALICE J-Cal Project) 1.
Jin Huang Los Alamos National Lab.  Calorimeter defines the inner-R edge of large- angle acceptance  The proposal assumed a 2.5 degree polar angle gap.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
EXAMINATION OF CORRUPTED DATA IN THE TILE CALORIMETER Stephanie Hamilton Michigan State University The ATLAS Collaboration Supervisor: Irene Vichou (U.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Mass production and mechanical structure P. Pakhlov (ITEP)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
M. Gilchriese Stave Prototype Status Summary July 5, 2006.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Modules components procurement EU Lead US Lead EU Scintillators US Scintillators EU Bond Paper US Bond Paper EU Straps US Straps EU BackPlate US BackPlate.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
P. Checchia LCWS02 Jeju1 Lccal * : an R&D project for the Electromagnetic barrel Calorimeter Design principles Prototype description Status of.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
Wander baldini on behalf of the SHIP Muon Group
Design of the He and HB ODU
CTOF Installation.
Presentation transcript:

Some cryostat scintillator slides for Monday’s meeting Michigan State University

E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B B ITC Scintillators (cryostat (or crack) scintillators) (gap scintillators)

Crack Scintillator (E3, E4)

Mounting Proposal

View of 2 cryostat shells mounting bracket

Closeup

Bracket in final position

Special ITC brackets

Inner radius Counters held together by pins in one module fitting into slots in neighbor module

Cryostat scintillator status as of 2004 Optics, PMT’s, electronics and even mechanical shells were available Scintillator purchase was a victim of management contingency and the cryostat scintillators were on the upgrade path In the last few months, thanks to Marzio and Howard Gordon, the money is now available for construction and installation …but, construction has to be complete by the end of this FY Completed counters will be sent to CERN at the end of 2005  when does installation make sense? …and,to save money, we will use polystyrene scintillator provided by Dubna, rather than the PVT scintillator from Bicron; factor of 2 less light yield, i.e. more like 2-3 pe/mip calibration issues Same WLS fibers as for gap scintillators

MBTS counters Completion of cryostat counters made possible by tying this project in with MBTS counters

Scintillator Dubna has already produced the scintillator for all of the MBTS counters  awaiting some final decisions regarding clearances, then scintillator will be shipped to CERN->MSU  construction will also take place this summer, available for shipping this fall (September)  testing of prototype counter with ATLAS electronics currently taking place at the University of Chicago Dubna is currently producing cryostat scintillator  to arrive at MSU by May 1  construction will take place this summer, available for shipping this fall (September)  testing with ATLAS electronics to take place on a similar time-scale