Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.

Slides:



Advertisements
Similar presentations
Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Stefano Lami 1CSN1 - Sep 24 th, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors based on scintillator.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Beam Position Monitors MICE CM Harbin January, 2009.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
Stefano Lami 1Rockefeller Meeting - Nov 3 rd, 2003 CDF Preshower/Crack Detector Upgrade (CPR2) Replace old CPR and CCR (slow wire chambers) with detectors.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
PHOBOS TOF Construction Status
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Jin Huang Los Alamos National Lab.  Calorimeter defines the inner-R edge of large- angle acceptance  The proposal assumed a 2.5 degree polar angle gap.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ATLAS micromegas activities (MAMMA)
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
Backward Calorimetry For SuperB
Design of the He and HB ODU
F.Guber, A.Ivashkin INR, Moscow
Limited Streamer Tube Project Summary
Quad-calorimeter for KLOE-2
Presentation transcript:

Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State University (apologies: some useful drawings captive on laptop, in for repairs)

E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B B ITC Scintillators (cryostat (or crack) scintillators) (gap scintillators)

Crack Scintillator (E3, E4)

Mounting Proposal

View of 2 cryostat shells mounting bracket

Closeup

Bracket in final position

Special ITC brackets

Inner radius Counters held together by pins in one module fitting into slots in neighbor module

Cryostat scintillator status as of 2004 Optics, PMT’s, electronics and even mechanical shells were available Scintillator purchase was a victim of management contingency and the cryostat scintillators were on the upgrade path In the last few months, thanks to Marzio and Howard Gordon, the money is now available for construction and installation Scintillator has been shipped from CERN to MSU yesterday  ~2.5 month delay Construction will still be complete during summer …and,to save money, we will use polystyrene scintillator provided by Dubna, rather than the PVT scintillator from Bicron; factor of 2 less light yield, i.e. more like 2-3 pe/mip calibration issues Same WLS fibers as for gap scintillators

MBTS counters 2 segments in  ; inner segment covers pixel detectors

Readout Scintillator is polystyrene- based, 2 cm thick Readout is by WLS fibers running along division between L/R scintillator segments plus through sigma grooves in scintillator Struggle to be able to trigger on MIP’s  increase light yield using every trick we know Will also crank up HV to 900 V WLS fibers welded to clear fibers to produce a pigtail which will mate into 1/8 of cryostat scintillator optical connections  after commissioning cryostat detectors will be re-connected

Scintillator Scintillator has been produced by Dubna  same scintillator as used for CDF central pre-radiator upgrade  currently at CERN, awaiting shipment to MSU later this week  ~2.5 month delay…  …construction will still be complete in September  will continue to test counters using ATLAS electronics readout chain at the U. of Chicago  …and installation will take place this fall/winter

New decision MBTS scintillator and boronated polyethylene moderator will be mounted together in same can  MBTS counters are never removed; they just slowly die but continue to moderate Moderator has to be machined back to 30 mm  currently looking for vendor  envelope of MBTS + moderator is 57 mm

New drawings of moderator + MBTS …still have to be approved

MBTS drawings

Installation work This fall/winter, the gap and cryostat scintillators will be installed on EBA and EBC  maybe delay in current schedule, but roughly Nov and Jan During these times, teams from the institutions listed on front page will be at CERN and will also work on installation of MBTS counters + moderator  working with shielding group  all details not worked out yet, but Ron Richards is at CERN for next few weeks to coordinate  installation is designed to be relatively straightforward