Cracow Gold Mine Quick Hitch Fan Cradle 22 nd August 2011 Townsville.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Safe work at heights This presentation assists Department locations to manage fall hazards in their workplace. The notes section in this presentation provides.
Safe use of Tools and Equipment at Height Guidance Richie Adams Egyptian Drilling Company.
This document is the intellectual property of Acer Inc. and may not be used, reproduced, modified, or re-utilized in any way without permission by Acer.
JOB SAFETY ANALYSIS Presentation. Job Safety Analysis Break down the task into steps Identify the hazards connected with each step State how you will.
Goonyella Riverside Mine Dipper Trip System Improvement Project.
Aims of the Presintation
WETSIDE DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
The Role of Defect Elimination in Reducing Hazard Exposure Presented by: Stuart Tomlins Callide Mine.
ERGONOMIC SOLUTIONS Designing The Workplace To Best Protect The Health And Safety Of Employees.
Crane Operations Objective
CRINUM MINE SAFETY INITIATIVE CRINUM BOOT END CONVEYOR BARRIER.
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
Developed by Western Iowa Tech Community College This material was produced under a grant (SH20836SHO) from the Occupational Safety and Health Administration,
Michael Brantley 2, Ryan Ferm 2, Nadia Siddiqui 2, Jason Newton 1, Reginald Scott 1 1 Department of Mechanical Engineering, Florida State University, Tallahassee,
2 3 4 One of the most common type of workplace injuries is those incurred from manual handling. To prevent manual handling injuries an employer needs.
Hazards Analysis & Risks Assessment By Sebastien A. Daleyden Vincent M. Goussen.
NEBOSH Certificate Essentials
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
Hazard Identification Toolbox
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
Mine Fatalities Involving Conveyors. Mining Fatality On August 1, 2005, a 30- year old laborer, with eight weeks mining experience, was fatally injured.
INCREASED SAFETY AND PRODUCTIVITY BUTT FUSING HDPE PIPE Jim Craig, P.E. Industry Relations Manager McElroy Manufacturing, Inc.
Task 21 Describe the importance of leaving the work area and equipment in a safe condition on completion of the drawing activities (such as correctly isolated,
OCCUPATIONAL HEALTH & SAFETY PROCEDURES.
Ontario Mine Contractor’s Safety Association Incident Review September 18, 2014.
Decline Warning Lights System Jason Lindley Electrical Technical Officer, Project Engineering August 22, 2011.
MNM Fatal Fall of Person Fall of Person February 27, 2014 (Iowa) February 27, 2014 (Iowa) Underground Limestone Mine Underground Limestone Mine.
Manual Handling STAFF BRIEFING – No 3
OMCSA Innovation Award Entry March 2012 “THE RERAILER BAR”
Manual Handling. Key Point Manual handling refers to any activity requiring the use of force by a person to lift, lower, push, pull, hold or restrain.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
Safe Spot ME 4182 Midterm Presentation February 22, 2006 J.J. Couvillion - Drew Bartlett - Manish Patel - Nick Roberts - Elisha Mellitz.
Managing WHS Controlling risks – the hierarchy of control Eliminate: Eliminate the hazard – remove it completely. For example, if noise is a hazard – remove.
Utility Engineers, PC.  Generation  Transmission  Distribution.
MACHINE GUARDING 29 CFR to
UNIVERSITY OF COLORADO COLORADO SPRINGS Office Ergonomics University of Colorado Colorado Springs Environmental Health and Safety.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
SAFETY FIRST LAST & ALWAYS Core Safety Values. Mechanical Lifting/Suspended Loads I will never place myself or others under a suspended load.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
Safe by Design Safe by Design Operation Maintenance and Repair
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
The Unique Scaffold Trailer Pack From Molecular Scaffold Sales.
Addapted Clothesline Edsgn100/OTA Project Fall 2015.
MANUAL HANDLING OPERATIONS REGULATIONS 1992 Sophie Owens.
SAFETY IN MATERIALS HANDLING AND CONTINUAL IMPROVEMENT
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
Product Focus: Using the Light Hatch to reduce time, costs and risk.
Children in hazardous work The ILO’s most recent global estimate is that 115 million children are involved in hazardous work. This is work that by its.
NEBOSH Certificate Essentials. NEBOSH National Examination Board in Occupational Safety and Health Image taken:
E8: Digital Humans Option E AHL: Human Factors Design IB Technology.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Mine Fatalities Involving Conveyors
Back Safety Plan Back disorders can develop gradually as a result of micro- trauma brought about by repetitive activity over time or can be the product.
NEBOSH Certificate Essentials
Jack and Hoist Safety.
Hazard Identification Toolbox
DID YOU KNOW KEY CONTROLS CAN BE IMPLEMENTED TO REDUCE DROPS AND DROP-RELATED INJURIES Key controls include: DROP Zones – Restrict areas where there.
Back Safety Plan Back disorders can develop gradually as a result of micro- trauma brought about by repetitive activity over time or can be the product.
Innovative Cable Management System
LIFEsavers Introduction
ACPA Chairman’s Safety Award
Elizabeth Bassey-Duke (M.Sc. Human Kinetics & Ergonomics)
NEBOSH Certificate Essentials
Hazards Analysis & Risks Assessment
ERGONOMIC SOLUTIONS Designing The Workplace To Best Protect The Health And Safety Of Employees.
custom-engineered solution
Chicago Clamp Company Manufacturing Structurally Sound and
Presentation transcript:

Cracow Gold Mine Quick Hitch Fan Cradle 22 nd August 2011 Townsville

The Problem

 Hanging secondary fans the traditional way is high risk.  Strain injuries – heavy manual lifting  Crush injuries – shifting loads and roll-over  Falls – working at heights  Mechanical failure – snapped suspension chains  Highly inefficient – cumbersome task.

The Problem  The residual risk for hanging fans using the traditional method was high.  The residual risk would fall substantially if people could be removed from the process.  Could we change the way we hung fans to remove people from the hazards?

The Solution –The quick hitch fan cradle concept was developed. –We approached AECOM to assist in the design process Key criteria for the design were: Must eliminate people from the key hazard exposures; Simple to use and sound in its performance; Minimum moving parts; Easy to manufacture and durable for underground use; Must be generic to all fans; Must be retro-fitable to existing infrastructure; Minimise installation time.

The Solution The quick hitch fan cradle

The Solution Hitch Rail Receiver Cradle

The IT extender arm.

Fan Hanging

The Receiver Cradle

The Hitch Point

The Solution  The quick hitch fan cradle Fall risk to personnel during the installation/removal process - Eliminated. Crush risk to personnel during the installation/removal process - Eliminated. Risk of using damaged or under-rated primary hanging chains (drop risk)- Eliminated. Risk of poor tie down of the chains to eye-bolts/bracket (drop risk) - Eliminated. Heavy manual labour (strain injuries)- Eliminated. The cradle has been designed, engineered and certified to task. Risk of mechanical Failure – ALARA.

Additional Information  The quick hitch fan cradle has been in service at Cracow for over 12 months.  All new fan installations have used the cradle and 90% of fans now hang on this solution.  The design and drawings cost approximately $25k.  The cradles have been manufactured by McBryde Corporation (Yeppoon, QLD)  Unit cost is approximately $6,000 depending on order quantity.  The installation time saving to us is approximately 12 man hours per move and 3 hrs of equipment time. ≈ $1,620 per fan move.  The safety cost saving is significant.

Questions ?  The quick hitch fan cradle