© 2012 Bentley Systems, Incorporated Integrated Asset Management Roads and Highways Jugal Makwana Bentley Systems.

Slides:



Advertisements
Similar presentations
Technology Efforts Related to Asset Management Integration Presented to the Institute of Navigation GNSS 2011 Conference By Laura Wipper, Asset Management.
Advertisements

Speakers Vikram Yellampalli Prity Tewary
 Permitting Routing › Definition › Permits Type › Permitting Process  Project Purpose › Proposed Solution  GIS › Definition › Functions › Benefits.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
Transportation Research Board October 20, City of Seattle Department of Transportation City of Seattle Challenging topography.
Bentley Systems, Incorporated
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
ICT Projects v Business Improvement
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
All rights reserved. Copyright Geomatic Technologies 2012 Presenter Name Presenter Contact GT’s PowerPoint Template Option 1 Presentation Subtitle.
© 2010 Bentley Systems, Incorporated Jugal Makwana Global Product Manager Geospatial For Infrastructure Design and Maintenance.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
© 2011 Bentley Systems, Incorporated 1 | Create Custom Geographic Coordinate System Problem : Project requires a new or updated GCS that.
Copyright © 2007 Tele Atlas. All rights reserved. Tele Atlas - ITS Hungary Norbert Hackner-Jaklin September 27th 2007.
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
Enterprise Asset Management
WVDOT GTI SECTION Status Update for Miss Utility.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
TfL Better Road and Streetworks Management
1 Ministry of Transport, Public Works and Water Management.
Oklahoma DOT’s Geographical Resource Intranet Portal (GRIP) v2 Expanding the Enterprise Presented by Jay Adams from ODOT & Jesse Jay from GeoDecisions.
1 navigat OR – Oregon’s GIS Utility n An enterprise approach to information management based on partnerships with all Oregon governments navigatOR is accelerated.
GIS Day UWM Making the Case for GIS Coordination in Wisconsin David Mockert November 14, 2007.
A Summary of State DOT GIS Activities Presented at the 2004 AASHTO GIS-T Symposium Rapid City, SD.
3D Utility Data – Reducing Project Delays, Managing Assets 3D Utility Data – Reducing Project Delays, Managing Assets WASHTO 2015WASHTO 2015.
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
North Carolina’s New Statewide Road Centerline Data Sarah Wray, GISP, CGCIOTim Sheldon, GISP Spatial Data ManagerBusiness Analyst Engineering Transportation.
Spatial ETL 1 April 2006 v Spatial ETL Bringing the Power of Location to Applications.
Hertfordshire County Council Environment HERMIS Update Efficiencies & IT Panel Terry Fox Head of Information Management.
© 2012 Bentley Systems, Incorporated Jimmy Lau Technical Resource Manager A Spatially Enabled Real-Time Traffic Information Managed Environment.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
1. Strategies & Technologies for Enterprise Data Management Joe Pugh Enterprise Data Management January 24,
INTELLIGENT TRANSPORT SYSTEMS
Hertfordshire Highways Overview & Scrutiny Committee Briefing 24 November 2011 Danny Kyan St Albans District Manager.
Highways and Engineering Consultation Presentation.
Esri UC 2014 | Technical Workshop | Esri Roads and Highways: Integrating and Developing LRS Business Systems Tom Hill.
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
A Summary of State DOT GIS Activities Presented at the 2003 AASHTO GIS-T Symposium Colorado Springs, CO.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Integrating Asset Registers Richard Bramham Asset Co-ordinator Manningham City Council 2010 National Local Government Asset Management and Public Works.
A Summary of State DOT GIS Activities Presented at the 2005 AASHTO GIS-T Symposium Lincoln, NE.
RELATIONAL DATABASES, LOCATION REFERENCING SYSTEMS, AND PAVEMENT MANAGEMENT SYSTEMS.
Michigan VII: Technology Improving Lives Safety Summit Lansing, MI February 28, 2006 Gregory D. Krueger ITS Program Manager Michigan Department of Transportation.
Bentley Map and CADD Interoperability for Road and Bridge projects Rob Mellis and Ray Filipiak.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Esri UC 2014 | Technical Workshop | ArcGIS for Public Works: An Overview Lindsay Thomas Scott Oppmann.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
Bookshelf APWA BookstoreFree Online From APWA “Public Works Management Practices Manual,” Version 7.
1 Ian Skinner Crash information Systems Integrating geographical and statistical analysis for maximum benefit.
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
GIS for Utilities… How can I use this in my job? Ron Householder, PLS.
Mobile GIS in Local Government to enhance Service Delivery Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Developing a National Service Improvement Network Donald Gaudoin.
PORT OF TACOMA. Request authorization for the Executive Director to Award Purchase Orders for the purchase of hardware and software for the Blair-Hylebos.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Road Management System and Data Collection in Karnataka PWD Public Works Department Government of Karnataka By Dr. H.R.Shantharajanna Chief Information.
Road Investment Decision Framework
Road Information System IT & Planning Division, NHAI Presentation on National Highways Authority of India byby + +
Moloto Road (R573) Safety Investigations
Routing Texas into the Future
ASSET DATA WAREHOUSE TUgis 2014 March 18, 2014.
Laurie Leffler, Division Administrator
Asset Management Journey
Pothole Predicament Mark Stevens Highways UK 8th November 2018
Esri Highway Data Maintenance Solutions: An Introduction
GIS-MO Project CRAB.
Presentation transcript:

© 2012 Bentley Systems, Incorporated Integrated Asset Management Roads and Highways Jugal Makwana Bentley Systems

© 2012 Bentley Systems, Incorporated 2 | India Geospatial Forum –February 2012 Why What When Where How Asset Management

© 2012 Bentley Systems, Incorporated 3 | India Geospatial Forum –February 2012 *BMI Infrastructure Report Q Asset Creation Asset Maintenance Asset Upgrade

© 2012 Bentley Systems, Incorporated 4 | India Geospatial Forum –February 2012 What? It depends on who we ask Pavement Engineer Bridge Engineer Senior Mgmt Safety Analyst A B D Roads Engineer C

© 2012 Bentley Systems, Incorporated 5 | India Geospatial Forum –February 2012 TRAFFIC LIGHT BRIDGE BARRIER POT HOLE STREET LIGHT: STREET SIGN TRAFFIC ALIGNMENT ROAD CONDITION LANES/WIDTHS

© 2012 Bentley Systems, Incorporated 6 | India Geospatial Forum –February 2012 If we put the pieces together: Category of roadLength in Km Total road network3.34 million National Highways65,569 State Highways1,30,000 Major Distt. Road, Rural road & Urban road 3.14 million ?

© 2012 Bentley Systems, Incorporated 7 | India Geospatial Forum –February 2012 Improving the Condition of the Asset Better Condition Better WorkMore Work Better Quality Optimum Service Levels More Money Better Intervention Current FundingMore Funding From Opus International

© 2012 Bentley Systems, Incorporated 8 | India Geospatial Forum –February 2012 Better Condition Better WorkMore Work Better Quality Optimum Service Levels More Money Better Intervention Current FundingMore Funding X ? Better Asset Management ManagementPractices From Opus International Improving the Condition of the Asset

© 2012 Bentley Systems, Incorporated 9 | India Geospatial Forum –February 2012 The AASHTO definition of Asset Management supports this conclusion: Conclusion Asset Management needs Information!

© 2012 Bentley Systems, Incorporated 10 | India Geospatial Forum –February 2012 Engineering Information Management through Asset LifeCycle Asset & Project Portfolio Info Management (APPIM) Asset Information Management (AIM) Project Information Management (PIM) Asset Lifecycle Information Management (ALIM) Source: ARC Advisory Group

© 2012 Bentley Systems, Incorporated 11 | India Geospatial Forum –February 2012 Engineering Information Management (EIM) Through Bentley’s Integrated Asset Information Solution Bentley traditional market Design and Project Information EIM - AssetWise Asset Information and Decision Support but when we bring them together we provide asset lifecycle management Each deliver value in their own right

© 2012 Bentley Systems, Incorporated 12 | India Geospatial Forum –February 2012 Engineering Information Management (EIM) An operations information modeling platform for delivering asset lifecycle information management Bentley traditional market Design And ProjectWise Map/Civil/Bridge MicroStation More…. Asset Model

© 2012 Bentley Systems, Incorporated 13 | India Geospatial Forum –February 2012 Engineering Information Modeling

© 2012 Bentley Systems, Incorporated 14 | India Geospatial Forum –February 2012 What is Engineering Information Management? An operations information modeling platform for delivering asset lifecycle information management Bentley traditional market Design And AssetWise ProjectWise MXRoad MicroStation More…. SuperLoad OPTRAM Insight LRS and applications ProjectWise and AssetWise provide powerful Information Management Asset Model

© 2012 Bentley Systems, Incorporated 15 | India Geospatial Forum –February 2012 Asset Information Provides Decision Support !

© 2012 Bentley Systems, Incorporated 16 | India Geospatial Forum –February 2012 TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yes REPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yes REPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE: 1 Low Pressure Sodium SEGMENT: MP-127 OFFSET: 1592 Feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE: 1 Low Pressure Sodium SEGMENT: MP-127 OFFSET: 1592 Feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet

© 2012 Bentley Systems, Incorporated 17 | India Geospatial Forum –February 2012 TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yes REPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yes REPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE: 1 Low Pressure Sodium SEGMENT: MP-127 OFFSET: 1592 Feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE: 1 Low Pressure Sodium SEGMENT: MP-127 OFFSET: 1592 Feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet

© 2012 Bentley Systems, Incorporated 18 | India Geospatial Forum –February 2012 Managing more than just physical Road Assets… Road Works Accidents Traffic DataEnquiry Management Parks and Places, BBQ’s…

© 2012 Bentley Systems, Incorporated 19 | India Geospatial Forum –February 2012 Exor at a Glance 19

© 2012 Bentley Systems, Incorporated 20 | India Geospatial Forum –February 2012 Solutions footprint…depth and breadth… E X O R S O L U TI O N S Road network definition, Customer Service Desk, Field Data collection, Asset recording, Inspections recording, Road condition recording, Structures recording, traffic volume recording, safety / crash data, Street works notices / permits, asset valuation / depreciation Construction records, Document management, Spatial data management, Road Information, Structures Information, Traffic Information, Safety / Crash Information Contract management, Works ordering and budgeting management, Multi-year programming, Road works co-ordination, Safety Analysis Pavement modelling, Asset valuations, Traffic congestion Executive Information Data Recording Information Management Operations and Management Strategic Management & Planning Executive Exor Database, Loaders, Web Services Field Data Collection software Pavement Manager, Enquiry Manager, Document Manager, Spatial Manager, Network Manager, Structures Manager, Traffic Manager, Safety Manager, Street Works Manager Maintenance Manager, Schemes Manager, Street Works Manager, Safety Manager Pavement Manager, Asset valuations Information Manager Integrate with other systems like HDM-4

© 2012 Bentley Systems, Incorporated 21 | India Geospatial Forum –February 2012 Exor Business Applications AssetWise – Exor Road Asset Management Oracle Spatial Database Geographic Information Systems Existing Legacy Systems Information Dashboard GIS/ Spatial Display Other Departmental and Corporate Systems Integration Using API’s Exor Hub Technology Oracle Spatial

© 2012 Bentley Systems, Incorporated 22 | India Geospatial Forum –February 2012 Oracle Spatial Database Asset Valuation Manager Street Lighting Manager Maintenance Manager Schemes Manager Traffic Interface Manager Structures Manager Safety Manager UKPMS Enquiry Manager MapCapture Mobile Public Rights of Way Noticing Manager Permitting Manager Street Gazetteer Manager CIM / FIM

© 2012 Bentley Systems, Incorporated 23 | India Geospatial Forum –February 2012 Exor Hub PMS / Condition Projects Traffic Data CRASH (Safety) Sharing Data without Duplication

© 2012 Bentley Systems, Incorporated 24 | India Geospatial Forum –February 2012 Data Displayed with Integrated Mapping

© 2012 Bentley Systems, Incorporated 25 | India Geospatial Forum –February 2012 Select Multiple Work Requests and Create a Work Order from the Map

© 2012 Bentley Systems, Incorporated 26 | India Geospatial Forum –February 2012 Example Engineering reporting – Assets along a route

© 2012 Bentley Systems, Incorporated 27 | India Geospatial Forum –February $ 26,000 Reconstruction Project 18 5 $ 1,500 Planned Maintenance $ 5,000 Pothole Repair (2000) (100) (2500) $8,000 $2,000 $6,300 $2,100 $16,100 $4,600 $3,150 $2,100 $500 $100 Segment Cost Cost per mile Exor provides powerful reporting across data sets

© 2012 Bentley Systems, Incorporated 28 | India Geospatial Forum –February Width Roughness Merge Results Width < 8 AND Roughness <40 And Merge Query functionality like this

© 2012 Bentley Systems, Incorporated 29 | India Geospatial Forum –February 2012 Information Manager: Actionable Intelligence 29

© 2012 Bentley Systems, Incorporated 30 | India Geospatial Forum –February 2012 Information Manager: Actionable Intelligence

© 2012 Bentley Systems, Incorporated 31 | India Geospatial Forum –February 2012 Global Adopters 31

© 2012 Bentley Systems, Incorporated 32 | India Geospatial Forum –February 2012 National Road Works Portal

© 2012 Bentley Systems, Incorporated 33 | India Geospatial Forum –February 2012 Engineering Information Management for Integrated Asset Management Enhances interoperability –Other Bentley Asset Lifecycle solutions –Third Party Solutions Proven Solutions Post Go-Live Support –Active user Community –Enhancements –Safeguard user investment Summary