FSO Installation Free Space Optics The Practical Aspect.

Slides:



Advertisements
Similar presentations
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Advertisements

Drawing furniture using One Point Perspective
Heavy Concrete Construction Formwork
Ladder Safety Today’s topic is Ladder Safety. This training is a part of OSHA’s Portable Wood and Metal Ladder Safety Standards (29 CFR ). You.
Ladder Safety Today’s topic is Ladder Safety. This training is a part of OSHA’s Portable Wood and Metal Ladder Safety Standards (29 CFR ). You.
Cooling Business Group 1 INSTALLATION Directions.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Chapter 15 Pretest Light and Refraction
Accessibility.  A building code is a set of rules that specify the minimum acceptable level of safety for buildings. The main purpose of building codes.
Measurement of Radiation - Solar radiation - Long wave radiation - Net radiation - Exposure of radiation sensors.
1 CCTV SYSTEMS CAMERA MOUNTS AND ENCLOSURES CAMERA MOUNTS AND ENCLOSURES.
Helicopter Safety for SAR Operations. Helicopter Rescue Checklist, Before you Call Before you consider using a helicopter for a rescue: Have we cross-trained.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
What is feather edging ? Improper Sanding Cleaning with silicon off.
Foundation Systems.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Subscriber Mounting Considerations Ermanno Pietrosemoli EsLaRed-ULA ICTP, February 2002.
STEP-BY-STEP LADDER SAFETY By Louisville Ladder Corporation.
Copyright ©2010 Progressive Business Publications 1 Preventing Slips, Trips & Falls.
16 Flat ledges on the open truss ceiling are sites where dust and dead insects can collect and fall onto exposed product. Solution: Clean these areas on.
Floor Flatness and Levelness
PAL #2  The Sun is 35 o above the horizon. It shines in a window and strikes a small mirror on the wall. The mirror is 3 feet off the floor. The reflected.
Chapter 8 Plot Plans.
Understanding House Plans
(Smart Loop System) Installation Guide. Rev B Shipping Box Contains Everything that is included in the box being shipped to a customer should contain.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
Angle of Elevation & Angle of Depression
Copyright  Progressive Business Publications Slip, Trip and Fall Prevention.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Link Budget Calculation
Copyright © 2002 Terabeam Corporation. All rights reserved. 1 Free Space Optics (FSO) Technology Overview John Schuster Chief Technology Officer Terabeam.
1 Business Development (Service).  Select location for Reflector Installation with clear view of Satellite (Line Of Sight)  There should not be.
Windows Do not open or close all windows and doors at the same time. Optimise the ventilation by experimenting with opening different windows instead.
9.6 Use Trig Ratios to Solve Word Problems
EXAMPLE SURVEY OF EXAMPLE SURVEY OF ELECTRIC MOTORS Plant Air Wash Supply Fan Temperature Rise = ____ High Temp = ____ Ambient = ____ EXAMPLE How to performin-houseinfraredtrendingofElectricMotors.
A Study into the Theoretical Appraisal of the Highest Usable Frequencies RA Contract AY 4329.
Elevations, Layout and Drawing Technique.
Noise Control A Guide for Workers and Employers. Steps used to solve Noise Control Problems Define the problem Establish a noise reduction target Determine.
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
A Sustainable Energy Future Renewable, Reliable, Clean, Efficient.
The Renson Headquarters Renovation issue Renovation issue Major findings Major findings The RENSON- The RENSON- Headquarters More information... More information...
State-of-Meaning NDSU Area Transit and Bus Stop. Mission Statement “… To Preserve Essential Tradition By Recognizing the existing and adding Innovation.
Energy Conservation February 8, Steve Wilson, MBA, CEM, CDSM, BEP The Energy Guy.
Intelligent Outdoor Detector Atsumi Electric Co.,Ltd. TriWatcher SIR10S.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Chapter 38 Fireplace Construction and Layout. 2 Links for Chapter 38 Fireplace Terms Energy Efficiency Fireplace Section Related Web Sites Fireplace Elevations.
Applications of Right Triangles
A New Language Shining the Light on Passive Solar Features and Retrofit Possibilities.
Multiview Drawings. Multiview Drawing A multiview drawing is one that shows two or more two-dimensional views of a three- dimensional object. Multiview.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT RECENT ALIGNMENT EFFORTS ALIGNMENT EFFORTS AT THE HEAVY ION ACCELERATOR FACILITY ACCELERATOR.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Refraction. Reflection When light reflects from smooth surface you can see an image. The image: - is _______ the object. (smaller than, the same size.
OSHA’s NEW Walking-Working Surfaces
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
Blueprint Reading and Care
Warm-up A ladder with its foot on a horizontal flat surface rests against a wall. It makes an angle of 30° with the horizontal. The foot of the ladder.
Smitty’s Two Minute Drill Mixed Content -05
PERSPECTIVES & ELEVATIONS
Free Space Optics (FSO) Technology Overview
Pre-Contract Cost Control
Civil Air Patrol – California Wing Weather Mission Scanner Course
Elevation Layout and Drawing Techniques
Warm Up Find the missing side length. Find the missing angle °
Warm-up A ladder with its foot on a horizontal flat surface rests against a wall. It makes an angle of 30° with the horizontal. The foot of the ladder.
The Result Of A Lost Line. Where the rubber hits the …roof
Helicopter Safety for SAR Operations
Free Space Optics (FSO) Technology Overview
Warm-up A ladder with its foot on a horizontal flat surface rests against a wall. It makes an angle of 30° with the horizontal. The foot of the ladder.
Presentation transcript:

FSO Installation Free Space Optics The Practical Aspect

2 The Path to a successful IR link Site survey Choosing the right product Design for safe (worst case) margins Perform a clean “by the book” installation Test end-to-end link connectivity

Preparation

4 Performing the Site Survey 1.Choose a mounting location 2.Confirm line of sight (Site A to Site B) 3.Note where fiber and power should terminate 4.Determine link range using GPS or other methods 5.Photograph the site 6.Go to Site B and repeat steps Complete the site survey check list (Site Survey Form)

5 Choose A Mounting Location

6 Line of sight Clear line-of-Sight Atmospheric disturbances dust clouds smoke large vehicle traffic (fumes) Physical obstacles Moving objects (cranes etc.) Trees Birds Nesting

7 Line of sight With chimneys

8 active Chumminess Link Location

9 Site Survey Scintillation Sources Air conditioning units Long, hot, rooftops Smokey chimneys Heavy traffic exhaust fumes Metal Roofing

10 Long, hot, rooftops Long hot roof can cause scintillations NetLight Unit

11 Long, hot, rooftops Long metal roof can cause heavy scintillations during summer time And can affect the traffic. The NetLight should be higher at list 15feet above the roof

12 Long, hot, rooftops Better location to mount the NetLight

13 Long, hot, rooftops Are you crossing this roof?

14 Air conditioning units Point B (Bad location) Point A (Good location)

15 Air conditioning units Vibrations Stable mount Wind Compressors Elevators Traffic Building Sway Wooden buildings Earthquake buildings

16 Site Survey Windows and East-West Links Windows 4% light reflection from each surface 15% loss from a double pane window Tinted windows increase attenuation NetLight should be placed at an angle greater than 1  and never more than 45  away from perpendicular to the window. Green, gray, brown and mirror window are not recommended because of very high attenuation East-West links Errors if 0.5  sun disk overlaps the NetLight Only for a few days a year Only for a few minutes each day Note: When transmitting trough window it important to notify the customer that From time to time the link can be blocked by the window cleaner elevator

17 Transmit Trough Window Drawing

18 Transmit Trough Window Picture Taking off part of the window coating Marking for the window cleaners

19 Photograph The Site Photograph the location Spot alternative mounting locations (if necessary) Photograph the line-of-sight ( From the NL final height) Photograph the overall roof top Photograph the under line terrain

20 Bad Line Of Sight Example

21 Installation

22 Rooftop Mounting Four types of Mounts Wall pedestal mounts Floor pedestal mounts Extended wall mounts Pole clamps mounts

23 Wall Pedestal Mount. Wall Pedestal Mount. Used when the link needs to be elevated above the top of the wall. M054C - 10 inches from base plate M053C - 22 inches from base plate M022C – 34 inches from base plate

24 Floor Pedestal Mount Reinforced Floor Pedestal Mount. Similar to the Standard Floor Pedestal. M015C - 47 inches (concrete) M059C - 47 inches (Indoor) M058C - 34 inches (Indoor) M050C – 34 inches (concrete) M055C - 22 inches (concrete) M057C - 22 inches (Indoor)

25 Extended Wall Mount Extended Wall Mount. Used when a standard wall pedestal mount is insufficient to clear obstacles or for applications requiring an extension from the wall for better access to the transceiver. M064C - 12 inches (metal for PCL) M051C - 22 inches (concrete) M056C - 34 inches (concrete) M062C - 22 inches (metal) M063C - 34 inches (metal)

26 Pole Clamp Example

27 Pole Clamp Example

28 Side Walk Concrete slabs place on the roof

29 Side Walk Concrete slabs place on the roof

30 Side Walk Concrete slabs place on the roof

31 Pre Made Concrete slabs on the roof

32 NetLight Installed on a self Support Tower Local Made Mount Bracket

33 Examples

34 Bad Finished Installation

35 Bad Finished Installation

36 Bad Finished Installation

37 NetLight

38 Finished Installation Junction Box 4 Links On One Roof Top

39 Finished Installation Back To Back HOP installation Junction Box

40 Finished Installation

Thank you