Why Reengineering Fails so Often Greg Walters Prepared for: Dr. Foster Supply Chain Management.

Slides:



Advertisements
Similar presentations
Implementing a Behavior Based Safety Process at Rockwell Automation
Advertisements

University of St Andrews from first to foremost 1 of 15 BPR and other TLAs Heidi Fraser-Krauss Director of Business Improvements University of St Andrews.
Implementing Strategy in Companies That Compete in a Single Industry
TK3333 Software Management Topic 7: Schedule Control.
Chapter 7 Schedule Control
Business Process Reengineering Raymond Yap Principal Consultant Hutex Management Consulting
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Consulting and Reengineering.
Welcome to Organizational Change. 2 Four factors that involved in Organizational Change and development : 1. Force for and Resistance to Organizational.
Reengineering…. BPR, Process Innovation, ERP, Mass Customization, Networked Organization, Empowerment, Teams, Virtual Corporations, TQM, JIT.
 Who wants to be reengineered? Taraneh Parvaresh Advanced Requirements Engineering SYSM 6309 Spring 2012.
HRM 601 Organizational Behavior Session 6 Motivational Applications.
Chapter 14, Stephen P. Robbins and Nancy Langton, Organizational Behaviour, 3rd ed. Copyright © 2004 by Pearson Education Canada Inc. Chapter 14 Organizational.
Implementing Strategy in Companies That Compete in a Single Industry
© 2005 Prentice-Hall 16-1 Organizational Change and Development Chapter 16 Essentials of Organizational Behavior, 8/e Stephen P. Robbins.
IT Planning.
© The McGraw-Hill Companies, Inc., Operations Consulting & Reengineering Chapter 8 {Chase & Acquilano} - Handout.
Strategic Information Systems for Competitive Advantage
IE673Session 8 - BPR1 Business Process Reengineering (BPR)
Chapter 6, Process-Flow Analysis
Organizational Changes
Business Process of reengineering.. Definition of Reengineering The fundamental rethinking and radical redesign of core business processes to achieve.
BPR. Business processes are simply a set of activities that transform a set of inputs into a set of outputs. For example suppose you are waiting in line.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
March 3, ORGANIZING TO MAKE A PROFIT OBJECTIVES By the end of the session, participants should be able to: Appreciate the need for planning before.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Management Practices Lecture 13.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Section 2 ENTERPRISE SYSTEMS.
MIS 101 PSCJ 4/21/2017 Lecture 6 Title: Business Process Automation, Improving, and Re-engineering MIS 325 PSCJ Mr Hashem Alaidaros.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 3 Strategic Initiatives for Implementing Competitive Advantages.
A PowerPoint Presentation By Matt Staufer
© 2005 Prentice-Hall 16-1 Organizational Change and Development Chapter 16 Essentials of Organizational Behavior, 8/e Stephen P. Robbins.
1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.
ORGANIZATIONAL DESIGN AND DEVELOPMENT INTERVENTIONS.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
BUSINESS PROCESS REENGINEERING & ERP
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Consulting and Reengineering
Quality Management.
Welcome! These workshops are called “Managing for Success.” But, what is success? While we’re waiting for everyone to arrive could you… Jot down what success.
Social Impact May 2007 Implementing the Business Plan Hyderabad India May 2007.
Business Process Reengineering Maciej Derulski. What is a business process? “A set of related activities that together achieve a defined business outcome.
BENCHMARKING BENCHMARKING. What is Benchmarking ? It is a continuous process of comparing a company’s strategy, products, and processes with those of.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Strategic Plan Development Using KPIs to Develop the Strategic Plan.
Chapter 9 Management Innovation for Modern Businesses:
Chapter 10 Innovation and Change. Purpose of the Chapter Discuss how organizations change How managers can direct the innovation and change process Discuss.
Managing Organizational Renewal Managing Change – What Do We Change?  Strategic change – a company’s strategy, mission and vision  Cultural change.
CISB444 - Strategic Information Systems Planning Chapter 5 : IS/IT Strategic Analysis: Determining Future Potential.
Succeeding at Reengineering. 2 Despite the success stories many companies that begin reengineering don't succeed at it. As many as 50 percent to 70 percent.
Gulay Litchfield For CQI-TECH PLC
GROUP 2 HARDIK SEMLANI (08FT-79) HIMANSHU GOYAL (08FT-81) KANIKA NAGPAL (08FT-082) MANASI GUPTA (08FT-085) RUBIN JAMES (08FT -099) Business Process Reengineering.
Chapter 16 Managing costs and quality
LOGO Managing Organizational Change and Learning By Daniel Damaris Novarianto S.
MANAGING INFORMATION SYSTEMS FOR STRATEGIC ADVANTAGE.
Reengineering Why It Fails Scott Schlofman December 14, 2006.
Chapter 5 Creating Business Value © John Wiley & Sons Canada, Ltd.5-1.
Presentation to Leadership Forum Change Leadership and Management David Keenan Chief Executive Officer SDRC.
CELLULAR MANUFACTURING
Strategic Formation Process
Strategic Information Systems Planning
Your own footer Your Logo.
Operations Consulting and Reengineering
Process-Flow Analysis
BUSINESS PROCESS RE-ENGINEERING Presentation
MGT 210 Chapter 9: STRATEGIC MANAGEMENT & PLANNING
Competing with IT “Using IT as a Strategic Resource and obtaining a competitive advantage.
מרכזת הוראה ומנחה – ד"ר בקי שוקן יחידות לימוד 3, 5 ו- 6
مشکلات و ضرورتهای اجرای پروژه
ERP and Related Technologies
Presentation transcript:

Why Reengineering Fails so Often Greg Walters Prepared for: Dr. Foster Supply Chain Management

INSANITY “Doing things the same way you’ve always done them and expecting different results”

Overview of Reengineering Definition How does it apply to my organization? Who’s done it? How does it work? Why does it fail?

Reengineering Defined “The fundamental rethinking and radical redesign of processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service and speed”

Application Retail Service Manufacturing Support All processes are subject to potential reengineering!

Manufacturing/Retail Complete reevaluation of how to bring new cards to market Goal: Cycle Time Reduction Result: Cycle Time Reduced

Service Manufacturing or Service? “K-minus Program” Focused on Core Competency Went from a $500 Million regional company to a $3 Billion national chain

Support Processes Problem: Falling behind in customer service Solution: Internally propagated customer review process Result: Decreased customer turnover

Why should we reengineer? “The only constant in life is change”

How do I get started? (Nuts and Bolts) Evaluate your processes –How do we do this process? –Why do we do it this way? –How can we do it better?

How do we do this process? Guidebooks/Manuals are a useful resource, but... Call in the experts Flowchart, flowchart, flowchart Model, model, model

Why do we do it this way? Keep those experts onboard! Every step of the process should have a purpose Does it make sense?

How can we do it better? Ask the experts Only benchmark if absolutely necessary Initially disregard viability, cost, etc. BE OPEN TO SUGGESTIONS!

Now what? Identify core competencies/processes Evaluate alternatives, consult, and model Implement the change

Implementation Varies from project to project –Questions to ask: Slow and steady? Or quick and painless? How are we perceived? Is that a light, or a train, at the end of the tunnel? How are we doing? Implementation is where we stumble

Why reengineering fails Two major breakdown points: –The actual reengineering process –The Human consideration

Failure due to the process Trying to fix a process instead of changing it Not focusing on the business process Ignoring impact on other processes/scope Quitting too early/settling for minor results

Reengineering takes time “It has been so aggravating. Finally, in the last six months or so, we have been getting to the point where we're really changing how we do business. But it's taken years. Not weeks. Not months. On a day-to-day basis, it feels like bowling in sand.” --Ben Powell, GTE Mobilnet

The Human Effect Poor leadership of the effort Trying to make reengineering happen from the bottom up Neglecting people’s values and beliefs Failing to account for the overall impact on the people in the organization

Leading the change Lackluster support and/or poor understanding from management guarantees disaster

The Human Effect (cont) Types of individual resistance –Habit –Security –Economic –Fear of the unknown Use Lewin’s 3 step approach

Types of organizational resistance –Structural inertia –Group inertia –Threat to Power/Resource Allocations –Threat to expertise

BUT... “The real cause of reengineering failure is not the resistance itself, but management's failure to deal with it." - Michael Hammer

Exercise/Application Let’s start small... –Evaluate the process of cleaning your home Is it as clean as you’d like? How does it get clean? Who cleans what? Why do we/I do it that way? Do I do it as efficiently as those around me?

Cleaning house (cont) If I could change anything I wanted about the way my house got clean, what would it be? What would it take to implement the change? How would this impact me/my family? Do I have the resources to make this possible? Write out an implementation program/schedule and begin the reengineering application.

Summary Reengineering is for everyone Evaluate existing processes Institute reengineered processes Avoid the common pitfalls Evaluate your performance and begin again

Bibliography and Suggested Reading List “Beating the risks of reengineering,” Hammer, Michael. Fortune. New York: May 15, 1995.Vol. 131, Iss. 9; pg. 105 “Identifying sources of reengineering failures,” Journal of Management Information Systems; Fall 1995 “Reengineering the Corporation: A Manifesto for Business Revolution”; Michael Hammer, James Champy “Beyond Reengineering : How the Processed-Centered Organization is Changing Our Work and Our Lives” Michael Hammer “Making change stick,” Fisher, Anne B. Fortune. New York: Apr 17, 1995.Vol.131, Iss. 7; pg. 121 “Reengineering: Righting wrong organizations” Kinni, Theodore B. Industry Week. Cleveland: Feb 7, 1994.Vol.243, Iss. 3; pg. 14 “The Reengineering Revolution;” Michael Hammer

Bibliography (Cont) “Leading Strategic Change: Breaking through the Brain Barrier,” J. Stewart Black and Hal. B Gregersen “Essentials of Organizational Behavior,” Stephen P. Robbins, 8 Ed. “Introduction to Operations and Supply Chain Management,” Cecil C. Bozarth & Robert B. Handfeld “Specific Examples from Reengineering,” Various Definitions: