LOFTY PURSUITS MARK SCHUSTER. TIMBER RIDGE  CONDO CONVERSION (1997)  100 UNITS  $10,000,000 PROJECT  PROBLEM  SALES DROPPED IN 6 MONTHS TO ZERO 

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

HOME BUYING/SELLING Hill AFB Housing Office
Combining Supply & Demand Chapter 6 Section 1
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Skyscraper Construction
The Rise of Big Business
COMPANY OWNERS: Kyle Schecht Marc Gusman Joe Grieco.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
The Causes of the Great Depression
Architectural Drawing Class Orientation/Intro to Architecture.
What We Stand For Our Mission What We Do Recent Developments Company Info What We Stand For Located in the heart of Washington DC, just next door to Union.
Development & Construction Services Capabilities Presentation.
GCSE Business Studies Types of Business GCSE Business Studies Unit 1 Introduction To Small Businesses 1.4 Making the Start- Up Effective.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
Chapter 5 Intro to Business Business in the Economy Business in the Economy.
Centex Golf Course Construction. Business Venture Centex Golf Course Construction will be spanning the country designing and constructing golf courses.
Kathy Pilon, Broker Realty Executives Cold Lake Ave, Cold Lake, AB T9M 1P
Introduction Mark Toepfer CRIS, MLIS UW Whitewater Graduate Declared my major in Business??? Switched to Occupational Safety and Health Safety is a Federal.
Southern ShoresResort Southern ShoresResort.
We Want To Help You Make More Money Starting Today… It’s true; Your friends at Southern Home Inspection Services want to help you make more money by sharing.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Andover Terrace Annual Meeting, 07MAY2015. Topics of Discussion ● Budget 2015 ● Snow Removal Assessment / Condo Fee ● Future Projects ● Questions.
Limited Companies LTD and PLC What they are and the differences between them.
Presented by David & Kristen Plamondon Your Dedicated Realtor® Team WHY LISTINGS ‘EXPIRE’
ECO 322 Nov 25, 2013 Dr. Watson.  Cattleman wants less price volatility so he can plan for the future  Meatpacker wants less price volatility so he.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
Vocabulary 4. local belonging to or connected with the particular place →It was difficult to understand the local dialect. contract an official written.
Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.
BOUNDLESS NETWORK Your Strategic Marketing Partner.
The Trials of the Auto Dealer Kathleen SponsellerJohn Stanovich Josh SheppardJared Simon.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Resources in Construction / Finance Costs of Building Plant and Labour.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Allison Morrow’s Senior Project 5/18/15 – 6/9/15.
Lesson 7.5 Solve Two-Step Equations Essential Question: How do you solve two-step equations?
The Great Depression Approaching Disaster. The Stock Market is where shares of companies are bought and sold. The stock market crashed on October 29,
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
General Contractor Davon Woodard February 11, 2014 Career Tech.
Why Listings ‘Expire’. Price – Without proper pricing, a property will take a longer time to achieve a sale and will yield substantially less dollars.
Jeopardy SupplyDemandEquilibriumGov. Interv. Other Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Circular Flow Lesson 2, Activity 5 1. Give three examples of resource owners. Answers will vary, answer can be anyone who has land, labor, capital or entrepreneurship.
The Rise of Big Business An Industrial Society Chapter 20, Section 3.
Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.
Leah’s Pony. What is the genre of this story? A. fantasy B. historical fiction C. folktale D. narrative nonfiction.
Business Plan Vee See Construction Company, Inc. Marjorie L. Herter.
The Circular Flow Model describes and shows how the economy interacts.
5 Steps to Clear Communication. David Lupberger
MARKETING & SALES CONS 7820 Professional Business Management COW 5.
Messer Construction Company Presented By: Mark Zimmerly.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
1 68 Careers in Clothing & Textiles Chapter 68 Page 658.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Worldwide Depression SS6H7 The student will explain conflict and change in Europe to the 21 st century.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
PSG Lending – Well Known Money Lending Company in Baltimore.
Finance Stuff Mechanics of Shorting a Stock Joe Nau.
Buying off the plan: Know what you are signing. Background James – property valuer and property consultant Mark – building inspector and building consultant.
Profession Practices (ECIV-5105)
Lofty Pursuits: Repairing the World One Building at a Time
Causes of the Great Depression
Design your house the way it must be done!
Laurel Canyon Apartments
NEED MORE Office, SHOP OR STORAGE SPACE?
Brencal Contractors Inc.
Coppin State University
Bond Program Update November 2018 – January 2019
Who, What, How and Why of Building Perry Gross Parsons Brinckerhoff
Presentation transcript:

LOFTY PURSUITS MARK SCHUSTER

TIMBER RIDGE  CONDO CONVERSION (1997)  100 UNITS  $10,000,000 PROJECT  PROBLEM  SALES DROPPED IN 6 MONTHS TO ZERO  SALES DEPART. CAN’T SAY WHY  CLOSE INSPECTION BY MARK  UNSOLD UNITS DIDN’T LOOK FRESH WORN OUT CARPET BURNED OUT LIGHT BULBS CAULKINGS PEELED OFF

TIMBER RIDGE  SOLUTION  PAY ATTENTION TO DETAILS  MARK GOES TO WORK AFTER HOURS CLEANS THE CARPET RECAULK THE COUNTERTOPS PAINTS THE DOOR TRIMS  HARD WORK PAYS  ALL UNITS ARE SOLD  FIND A JOB THAT YOU ARE PASSIONATE ABOUT  BE ON TIME AND KEEP YOUR WORD

KEEPSAKE STORAGE  FAILURE: EVERYONE EXPERIENCE IT  CONDO OWNERS WANTED MORE STORAGE SPACE  BOUGHT LAND AND DESIGNED THE STORAGE BUILDING

PROBLEMS  HAD TO CHANGE ARCHITECT  A LOTS OF TIME DUE TO MANAGEMENT OF THE FACILITY  HAD TO LEARN MYRIAD OF LEGAL PROCEDURES  COSTLY EVICTIONS  4 OTHER MINI STORAGES POPPED OUT  TOOK 3.5 MILLIONS TO FINISH  CAPITAL CALL LETTER:I SCREWED UP

SHOULD HAVE …..  MADE A SMALLER STORAGE FOR THE AREA  DESIGNED DIFFERENTLY  THREE STORY BUILDING IN THE MIDDLE  SHOULD HAVE GOTTEN MORE HELP FROM EXPERTS IN THE FIELD  HIRED A MINI STORAGE MANAGEMENT COMPANY

MOSLEY LOFTS

=1&address=2720-3rd-Ave-#711-Seattle-WA-98121

MOSLEY LOFTS $ 559,000

PROJECT  YEAR BUILT2008  CONTRACTOR: JE DUNN  OWNERFRED SHIPMAN  DEVELOPPER :SCHUSTER GROUP  OWNER: MARK SCHUSTER  ARCHITECT:  MITHUN ARCHITECTS 42 UNITS X 5 DESIGNS = 210 DESIGNS YOU NEED TO LEAD THE SUBCONTRACTOR AND USE THEIR EXPERIENCE

MARKETING  BUYING PROCESS: 2 YEARS FROM START TO END  KEEP THE ENTHUSIASM  BUYER EVENTS EVERY 3 TO 4 MONTHS KEEPS BUYERS INFORMED GET TO KNOW THEIR NEIGHBORS THE MOVIE: THE INCONVENIENT TRUTH BY AL GORE

PROBLEMS  DELAYS  EXCAVATION  CONCRETE PLANT STRIKE  MEP: MECHANICAL ENGINEERING AND PLUMBING COORDINATOR  TENSION BETWEEN THE SUBCONTRACTORS  COST OVERRUN: 3.3 MILLION DOLLARS  MEETING WITH BANK:LARRY AND JOE YEARS OF EXPERIENCE UNDRESTOOD THESE THINGS HAPPENED BUT TRUST IS ESSENTIAL

PROBLEMS  CONSTRUCTION LOAN NEEDED EXENSION  200,000 PRICE  TOO MUCH TIME WAS NEEDED  THERE WERE OTHER PROJECTS A GOLF COURSE RESORT A SHOPPING CENTER AND TWO OFFICE BUILDING RENOVATION  HAD TO HIRE AN OPERATION EXECUTIVE  CONTRACTOR WAS NOT AS PRESSED AS US  HIRED A PRICEY SCHEDULING CONSULTANT  WE THOUGHT WE NEEDED 4 MONTHS  WE WERE TOLD WE NEEDED 9 MONTHS

FINISHED PROJECT

THANK YOU KIANOUSH ZADEH