Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.

Slides:



Advertisements
Similar presentations
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Pavement Management Engineer
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
“Practical Pavement Management with Micro PAVER”
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
The Dalles Pavement Preservation Program Presented by Bill Barrier Transportation Manager City of The Dalles Public Works Department.
A PRESERVING AIRPORT PAVEMENTS Highlights from 2010 ACRP Synthesis FAA Eastern Region 2011 Airports Conference Paul W. Wilke, P.E. Principal Engineer.
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Preventive Maintenance
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Development of GIS integrated Pavement Management System (PMS) for small cities. Golam Mohammad Moinuddin.
PRIORITIZATION.
PAVEMENT CONDITION INDEX
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Asset Management Maintenance Management System
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Nordic Skiing Financial Management Plans - Planning Your Run.
Russian Engineers Training March 2011
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Road Investment Decision Framework
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
2012 Pavement Management Update June 12, 2012 BoCC Work Session.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
Transportation Development District Presentation
Roadway Pavement Management Plan
Village of Woodridge 2011 Pavement Analysis
AN-Najah National University AN-Najah National University
Pierce County Pavement Preservation Program
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Multi-Year Programming and Predictive Modelling
Pavement condition index calculation
Consequences of Delayed Maintenance of Pavement Networks
PASER Ratings for TwinCATS Planning Area
Presentation transcript:

Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.

Discussion Outline Pavement Management Overview Inventory and Database Generation Maintenance and Rehabilitation Budget Analysis and Goals Summary of Benefits

Pavement Management Pavement Management System (PMS) –What is it? A set of tools and methods that assists in the cost effective maintenance of a roadway system. –Why? Rating roadways, identifying and implementing proper maintenance techniques and prioritizing improvements drastically impacts the effectiveness of the annual budget.

Pavement Management Five Key Components of a PMS –Inventory - Gather Pertinent Data and Complete Physical Inspection of Each Roadway –Database - Develop and Maintain Records of Current and Past Conditions of Pavement Sections –Budget - Analyze Current Budget and Develop Budget Scenarios for Future Expenditures –Prioritization - Determine the Most Effective Way to Apply Budget on an Annual Basis. –Communication - Provides a Means to Convey Plans and Ideas Among Township Staff, Elected Officials, the Community, the Media and other Government Agencies

Database Hierarchy Blackberry Township Network 1Network 2, 3... Branch 1Branch 2,3... Section 1Section 2, 3... Sample Unit 2, 3...Sample Unit 1

Inventory and Database Network – A Geographically Similar Grouping of Roadways (neighborhood, subdivision, etc.) Branch – A Roadway (Smith Road, etc.) Section – A Segment of a Branch with Similar Characteristics (construction date, width, edge treatment, etc.) Sample Unit – Generally, a 100 Foot +/- Unit Within a Section Breaking Out Sample Units in this Manner Simplifies the Inspection Process

Inventory and Database Inventory –Select Appropriate Database Software – In Blackberry Township, MicroPAVER was Selected Reliable, Most Commonly Utilized in the U.S.; Recommended by the American Public Works Association (APWA) –Conduct Roadway Inspections Gather and Document Data (Pre-Inspection) –Construction Year, Length, Width, Roadway Type, Pavement Data, Maintenance History (provided by Blackberry Township)

Inventory and Database Inventory –Conduct Roadway Inspections Field Inspection/Condition data –Manual – Most Cost Effective for the Size of the Blackberry Township Roadway System –Automated Inspection Used abbreviated inspection in Blackberry Township –Inspected one or two roadways in each year of construction and grouped roadways together in PCI score

Inventory and Database Inventory –Identification of Pavement Distress –Accumulation of Distresses Reduces Pavement Rating –Pavement Rating “Pavement Condition Index” (PCI) Scale from –New Pavement, No Distress – PCI of 100 –Old Failed Pavement, Heavy Distress – PCI of 0

Inventory and Database Types of Distress – Alligator Cracking

Inventory and Database Types of Distress – Block Cracking

Inventory and Database Types of Distress – Depressions

Inventory and Database Types of Distress – Transverse Crack

Inventory and Database Types of Distress – Pothole

Inventory and Database Types of Distress – Raveling

Inventory and Database Types of Distress – Edge Cracking

Inventory and Database Analysis –Distress Type, Quantity and Severity Entered into Software –Software Develops Rating (7 Typical Categories) Excellent (86-100) Very Good (71-85) Good (56-70) Fair (41-55) Poor (26-40) Very Poor (11-25) Failed (0-10)

Inventory and Database Examples – Excellent Roadway (Smith Road)

Inventory and Database Examples –Very Good Roadway (Seavey Road)

Inventory and Database Examples – Poor Roadway (Kenmar Drive)

Inventory and Database Summary of Roadways Currently 58 Centerline Miles –52 Miles Surfaced –6.0 Miles Gravel Roads »(Bateman, Brundige, Finley, Lorange, Seavey) »Gravel Roads were not included in the analysis

Summary of Roadway Age: 0-2 Years0.86% ( 52,272 SF - 2 total sections ) 3-5 Years10.80% ( 655, total sections ) 6-10 Years 17.03% ( 1,033, total sections ) Years 38.30% ( 2,323,946 SF - 53 total sections ) Years 25.00% ( 1,516,587 SF - 60 total sections ) Years 7.99%( 484,886 SF - 11 total sections ) Inventory and Database

Overall Township PCI of Summary of PCI Ratings: Excellent (86-100) 9.62% ( 583,836 SF - 9 total sections ) Very Good (71-85) 7.52% ( 456,411 SF - 14 total sections ) Good (56-70) 18.09% ( 1,097,597 SF - 25 total sections ) Fair (41-55) 31.81% ( 1,929,867 SF - 53 total sections ) Poor (26-40) 32.95% ( 1,998,794 SF - 60 total sections ) Very Poor (11-25) 0% ( 0 SF - 0 total sections ) Failed (0-10) 0% ( 0 SF - 0 total sections ) Inventory and Database

Township Wide PCI Map

Maintenance and Rehabilitation Utilize Software –Establishes PCI –Develop Recommended Annual Expenditure –Review Rehabilitation Methods –Identify Timelines for Preventative Maintenance Develop Improvement Schedules –Multi-Year Plan –Prioritization to Maximize Budget Effectiveness Not Necessarily “Worst First”

Maintenance and Rehabilitation Preventative Maintenance ($ $0.50/SF) –Crack Sealing –Intermediate Patching Program –Drainage Improvements –Microsurfacing or Other Surface Treatments –Goal - Extend Serviceability of Roadways, Delay Costly Rehabilitation Methods Resurfacing ($ $4.00/SF) Reconstruction ($ $12.00+/SF)

Maintenance and Rehabilitation

Budget - –Current Township Program consists of 1.5”-2” Overlays with Crack Sealing Deteriorating Average PCI - –The Township’s $150,000 MFT Funds Result in a Deterioration of the Roadways over Time (Typical for Most Local Agencies) Future 2034 PCI with current funding - –Currently, the average PCI for the Township is (Fair). At the current funding level, 2034 PCI will have fallen to (Very Poor). Budget Analysis and Goals

Current Status - –Currently, the Township has a low overall average PCI due to the age of the roadways. Maintaining the PCI - –Due to the age and low quality of roadways within the Township, maintaining a PCI level at even a Fair rating will require a much higher budget than is currently used. A budget in the range of $700,000 would be required to approximately maintain a constant PCI within the Township. This corresponds to a resurfacing cycle of 30 years +/- for every roadway. Budget Analysis and Goals

Expenditures - –The next figure shows the PCI vs. Time curve for an annual budget of $850,000. This would combine the $150,000 MFT allotment as well as $700,000 of funding from other sources within the township. Increasing Average PCI - –This level of funding results in an increased average PCI at the end of 20 years; however, it initially decreases due to a large backlog and then begins to recover after 7 years. Future 2034 PCI - –At a funding level of $850,000, the PCI would increase to 57; this moves the system into “Good”. It also represents a more stable resurfacing cycle of 25 years +/- for every roadway. Budget Analysis and Goals

How Much Should You Spend???- –Due to the age and low quality of roadways within the Township, obtaining an acceptable overall PCI level will require a much higher budget. According to MicroPAVER in order to obtain a PCI of 72 within the Township a budget in the range of $1,100,000 would be required. Future 2034 PCI with $1,100,000- –At the increased funding level, 2034 PCI will have increased to 72.19, this moves the system into “Very Good”. It also represents a more stable resurfacing cycle of 20 years +/- for every roadway. –The next figure shows the PCI vs Time curve for an annual budget of $1,100,000. Budget Analysis and Goals

The Current PCI is 51.07, which is “Fair” Maintaining a Fair Rating will be Difficult Financially with the current budget due to the extreme backlog of deficient roads The Goal is to Select a Target Budget with Realistic Goals and Adequate Long Term Serviceability An Ideal Budget Will Provide for Reasonable Resurfacing Timelines and Periodic Pavement Preservation Target Budget

Summary of Benefits Improve the Efficiency of Decision-making Involving Pavement Management Activities Develop Multi-Year Program that can be Justified and Communicated Predict Future Condition of Pavement for Different Levels of Funding and Shows the Effects of Under- funded Road Programs Inventory and Database can be Periodically Updated to Monitor Progress Complete Re-Inspection to Conduct Supplemental Evaluations – Monitor Deterioration and Budget Effectiveness

Summary of Benefits Questions?