1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Mitigation for Air Quality in the Planning System: case study and lessons learnt Dr Clare Beattie.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
InterCap HoldingsWest Windsor Redevelopment what West Windsor wants create our very own main street 1,000 additional parking for WW residents relieve traffic.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Watlington Traffic Study TPP Presentation 24/11/2014.
A vision for the future at princeton junction presented by InterCap Holdings West Windsor Redevelopment May 31, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
2016 Cape Cod Regional Transportation Plan Development 16 MARCH 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
SUMMARY OF FINDINGS FROM A SURVEY OF LIKELY VOTERS IN DENVER What Is the Public Telling Us? Ben Kelly.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Roads & Traffic Department College Green Public Transport Priority measure.
Community Development Department Construction Phase BULLDOG DRIVE.
Traffic Flow Parameters Surface Street Application.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
Chapter 9 Capacity and Level of Service for Highway Segments
Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
MED SR 18 Corridor Project MED PID October 13, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Scenic Highway – Public Meeting
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Draft Transportation Element September 6, 2017
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
San Mateo Countywide Transportation Plan update
Status Report on Rochester’s DMC Transportation Plan
I-85 Corridor Light Rail Transit Feasibility Study
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Presentation transcript:

1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris

2 ENG-WONG, TAUB TRAFFIC ASSESSMENT REPORT It is important to note that the results of this “pre-conceptual” analysis are based on …. Preliminary assumptions and would likely change based on changes in background regional traffic volumes associated with revisions to the NJDOT Penns Neck model (i.e., with the Vaughn Drive Connector included as a stand-alone improvement without any of the US-1 upgradws previously identified in the Penns Neck EIS). Principal objectives –Confirm findings of my initial “sketch” analysis (3/31/08) –More specific traffic data to guide sizing and layout of streets and intersections

No-Build Levels of Service LOS A-D LOS E LOS F

No-Build Assessment This analysis indicates that at each of the three signalized intersections in the Study Area, traffic volumes will exceed capacity even with no further development action within the redevelopment area and if no further mitigation is applied. In considering alternatives for the Route 571 improvement, the Township clearly articulated its objective to limit roadway widening, even if congestion were to result. The findings of this analysis are consistent with that position. - 3/31/08 memo re. Hillier - 9/08/08 memo re. InterCap

Build Levels of Service Improvements Assumed LOS A-D LOS E LOS F

6 On-Site Traffic Volumes Highest hourly 2-directional volume

7 INTERCAP REDEVELOPMENT PLAN REVIEW Traffic Access(1-7) West-Side Circulation(8-13) East-Side Circulation(14) Main Street (Route 571 Area)(15-17) Parking(18-21) Pedestrians and Bicycles(22-24) Finance(25-29)

8 Traffic Access: (1) 2 intersections needed on Alexander

9 Traffic Access: (2) Old Bear Brook Road and on-site linkage

10 Traffic Access: (3) Further improvements needed at Alexander / Vaughn

11 Traffic Access: (4) 4 lanes needed on Vaughn Drive: Remove Parking

12 Traffic Access: (5) Eliminate grade separations, 2 at-grade intersections

13 Traffic Access: (6) Extend Vaughn Drive or Road B to Sarnoff Connector (Vaughn Drive preferable)

14 Traffic Access: (7) NJDOT evaluating implications of changing Penns Neck EIS Record of Decision plan

15 West Side Circulation: (8) Core Area: More detail needed, accomodation for drop-offs / pickups, BRT, etc.

16 West Side Circulation: (9) Core Area: A plan can be worked out

17 West Side Circulation: (10) Core Area: Additional pedestrian tunnel

18 West Side Circulation: (11) “X” arrangement for primary streets Primary intersection at crossing

19 West Side Circulation: (12) Seek appropriate volume and mix on Road B in town center

20 West Side Circulation: (13) Reexamine use of Vaughn Drive and BRT line

21 East Side Circulation: (14) Expand drop-off / pick-up area

22 Main Street (Route 571) Area: (15) Consistency with adopted concept

23 Main Street (Route 571) Area: (16) Wallace Road realignment

24 Main Street (Route 571) Area: (17) Acme site access

25 Parking: (18) Parking space supply Existing Commuters (3,500 spaces) New Commuters (2,500 spaces) Site Uses (5,650 spaces)

26 Parking: (19) BRT impact on parking demand space reduction in demand (20) Accounting for shared parking in new non- commuter space calculations (21) Garage layouts, sizes, access, general arrangement

27 Pedestrians and Bicycles: (23) Pedestrian plan and links to Township System

28 Pedestrians and Bicycles: (24) Pedestrian bridge at Route 571 / Amtrack

29 Pedestrians and Bicycles: (25) Add pedestrian links, fill gaps

30 Finance: (25) Infrastructure financing not analyzed by me (26) Basis of initial cost estimate not presented (27) Cost reductions being investigated - Eliminate grade separations - Effect on Penns Neck EIS being evaluated - Added cost items probable (28) Vaughn Drive on Township Roadway Assessment program (29) State funding implies need for flexibility in layout, phasing, financing