Loads in SCED v2 Subgroup

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Discuss infrastructure to support bilateral contracting between CSPs and REPs in the Retail Market Loads in SCED Sub-group May 22,
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
Loads in SCED v2 Subgroup Update to DSWG 3/9/
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
LMP-G Policy Issues Discussion Demand Side Working Group July 9 th,
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Reliability Demand Response Product February 25, 2011
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Load Participation in Real-Time Market: LMP Minus G.
SPP Presentation. Retail Open Access for ETI within SPP Implementation Considerations Stakeholder Meeting February 21, 2007 Austin, Texas.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
LMP-G Update to DSWG LRISv2 Subgroup Aug. 20,
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
LRISv2 Subgroup Proxy $G Discussion 10/27/
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
ERCOT MARKET EDUCATION
CRR Deration and NPRR821 WMS 09/06/2017.
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Loads in SCED v2 Subgroup The LMP-G Journey

TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable direct participation in the real-time market by DR QSEs (i.e. CSPs). As presented to TAC, LMP-G establishes the principle that a customer should not get the benefit of the curtailment twice -- i.e., LMP plus avoided cost of energy. TAC endorsed ‘volumetric’ LMP-VG, which requires assignment of the estimated curtailment back to the specific customer. Through significant discussion and presentations from stakeholders, LRISv2 Subgroup has determined that customer-specific curtailment cannot be estimated for many customers, including all residential, with a level of accuracy necessary for implementation.

LMP-G: What we’ve learned Residential customers must be aggregated to allow for accurate baseline estimation of curtailment quantity. Minimum size of aggregation can be defined. Many (but not all) larger customers can have site-level curtailment quantity estimated with sufficient accuracy. Mid-to-large commercial/industrial. Residential customers (>50% of ERCOT peak) represent high potential for price responsive load. Depending on control systems, residential aggregations may be well-suited for SCED base point instructions. LRISv2 Subgroup believes LMP-Proxy $G can be utilized for customers on fixed price rates (including most of the residential market).

LMP-G Road Map Represented by LSE/REP or DR QSE? Loads in SCED Resource/ALR Request Settled as LRISv1 Bid to buy in SCED DR QSE Settled as LMP-$G Can we accurately estimate discreet customer-level curtailment? Offer to sell in SCED Yes Offer to sell in SCED No Settled as LMP-VG Yes Does the Resource/ALR contain customers with fixed price rates that are compatible with LMP-$G? Does aggregation meet minimum customer count for baseline accuracy? Yes No No ALR fails qualification (Bilateral only through REP/LSE)

The DR potential of residential customers 2013 Price Responsive Load Study DR Type Residential Participants* Barriers Retail Real-time Pricing 1641 REP billing system upgrades Retail “Other Load Control” 10,0711 Cost of DR infrastructure Retail Peak Rebate 1,6521 Accuracy of individual customer baselines; REP billing system upgrades Retail TOU 117,6231 Weather-Sensitive ERS 60,0982 Cost of DR/QSE infrastructure Ancillary Services 02 Cost of DR/QSE infrastructure including telemetry Loads in SCED Cost of DR/QSE infrastructure including telemetry; 5-minute incremental DR in both directions not suitable for blocky loads; limited to LSE QSEs ~5.9 million competitive residential customers remain untapped

The DR potential of residential customers

Pecan Street Research In a studied sample of 40 homes in Austin, Texas for the period June 1 – August 31, 2013, these measurements were observed: Electricity used for HVAC accounted, on average, for 66 percent of the entire home’s daily electricity use. During peak demand hours (3-7 pm), the portion of electricity used for HVAC averaged 73 percent. The portion of discretionary home electricity used for HVAC averaged 81 percent. During peak demand hours, the portion of discretionary home electricity use for HVAC averaged 82 percent. http://www.pecanstreet.org/2014/05/ac-accounts-for-23-of-home-summer-electric-use-over-80-of-discretionary-electric-use-in-texas-research-trial/

LRISv2 Subgroup Direction Significant concerns remain with implementation of LMP-VG that are mostly resolved with LMP-Proxy $G. LMP-VG could enable LSEs to bill customers for consumption that didn’t occur. PUCT action likely required. LMP-VG presumably targets larger Loads which may be interested in other ERCOT programs (i.e. ERS, RRS). It isn’t clear that there is enough of a market need to spend time on this path. Fixed price customers (including most of residential market), and their HVAC load, represent the most potential for price responsive load capability. Therefore, LRISv2 Subgroup has discussed focusing the second phase of Loads in SCED on fixed price customers (most residential) and implementation of LMP-Proxy $G. We’ll have our hands full with this direction (see next slide).

LMP- Proxy $G Policy and Design Decisions Methodology to determine Proxy $G What is Proxy $G? Next slide. How to determine Proxy $G? POLR rates. Process to qualify LRISv2 ALRs. What retail rates are compatible with LMP-$G objective? How to identify the rates and the corresponding ESIIDs? Define customer rate composition to qualify for LRISv2 as an ALR. Define minimum customer aggregation to qualify for LRISv2 as an ALR. Process to manage and maintain LRISv2 ALRs. How to manage changing compositions of ALR customer rates and LMP-$G eligibility? How to manage changing ALR customer counts and LMP-$G eligibility? Define rules regarding ALR->LSE allocation Customer deployment limitations Notification to LSE/REP “Offer to sell” details DR “bounce-back” management Everything else we haven’t thought of yet We are here

What is Proxy $G? “Retail customers that reduce their consumption should not be paid as if they generated the electricity they merely declined to buy. Instead, retail customers should be compensated as if they had entered into a long-term contract to purchase electricity at their retail rate but instead, during a peak demand period, resold the electricity to others at the market rate (LMP).”1 “In other words, they should be paid “LMP-minus-G,” where G is the rate at which the retail customer would have purchased the electricity. Simply put, the customer must be treated as if it had first purchased the power it wishes to resell to the market.”1 Proxy $G = A proxy for the “purchase price” or “contract price” that is generally representative of what retail customers paid for their energy adjusted for risk. 1http://www.hks.harvard.edu/fs/whogan/Economists%20amicus%20brief_061312.pdf

How to determine Proxy $G? LRISv2 Subgroup evaluated multiple approaches to determine Proxy $G: PUCT retail electric service rate reports POLR rates Power to Choose The three approaches all yielded similar results $96/MWh to $132/MWh LRISv2 Subgroup supports using POLR rates as the mechanism to calculate Proxy $G. Why? POLR rates are formulaic and well established in PUCT rule Static and stable mechanism Sufficient premium incorporated to account for gas price fluctuations and hedge value Easy to strip out wires charges and ERCOT fees

Using POLR rate as Proxy $G? LRISv2 Subgroup agreed that: POLR rate should be used to calculate a market wide Proxy $G Weighting factors can be calculated and applied to Load Zone RTSPPs One Proxy $G will be applied to residential and small non-residential (one $G for all ALRs that qualify for $G treatment) ERCOT fees and AS charges will not be included in Proxy $G and therefore estimated curtailment will not be added to LSE load for these assessments NPRR language will refer to PUCT POLR rules and not replicate them

How would LMP-Proxy $G work? HEDGED ERCOT Settlement for HE17 ERCOT charges LSE/REP RTEIAMT based on 274MWh RTEIAMT settlement is $0 due to hedges ERCOT credits LSE/REP 30MWh x Proxy $G ERCOT credits CSP 30MWh x $920 (RTSPP – Proxy $G) Proxy $G = $105/MWh (POLR) RTSPP = $1,025/MWh CSP is settled for the curtailment quantity at LMP-Proxy $G LSE/REP is settled like they served the load at the POLR rate

How would LMP-Proxy $G work? UNHEDGED ERCOT Settlement for HE17 ERCOT charges LSE/REP RTEIAMT based on 274MWh RTEIAMT settlement charge is 274MWh x $1,025/MWh ERCOT credits LSE/REP 30MWh x Proxy $G ERCOT credits CSP 30MWh x $920 (RTSPP – Proxy $G) Proxy $G = $105/MWh (POLR) RTSPP = $1,025/MWh CSP is settled for the curtailment quantity at LMP-Proxy $G LSE/REP is settled like they served the load at the POLR rate

How to qualify LMP-$G eligible ALRs? Evaluate the population of customers to determine if they are fully hedged (i.e. on LMP-$G compatible “fixed price” retail rates) If a customer is on a “DR retail rate” from their REP, they are already getting compensated for their DR capability Options to perform this evaluation: Examine the rate of each customer in the ALR and determine if it is a pre-defined “DR retail rate” (i.e. RTP) Assume residential customers are mostly hedged and accept inaccuracies for ones that aren’t DR Provider of Record

How to qualify LMP-$G eligible ALRs? Option 1) Examine the rate of each customer in the ALR and determine if it is a pre-defined “DR retail rate” (i.e. RTP) How would it work? DR QSE submits ALR for qualification REPs identify unhedged customers in their portfolios and submit ESI ID lists to ERCOT: unhedged fails litmus test Submission process TBD; could be similar to the Retail DR data collection project ERCOT communicates disqualified ESI IDs back to the DR QSE

How to qualify LMP-$G eligible ALRs? Option 1) Examine the rate of each customer in the ALR and determine if it is a pre-defined “DR retail rate” (i.e. RTP) Pros Identifies and disqualifies customers that would receive DR double payment Somewhat accurate settlement for REP Low barrier to entry for DR QSE Cons If not refreshed frequently, the ESIID-to-rate type relationship will become stale through customer switching Complex implementation (more frequent or formal Retail DR data collection) Potential for ‘DR blocking’ and gaming by REPs DR QSE wears risk of unknown ALR composition and “ALR creep” as customers switch to DR rates Does not accommodate evolving rate structures of the retail market

How to qualify LMP-$G eligible ALRs? Option 2) Assume residential customers are mostly hedged and accept inaccuracies for ones that aren’t How would it work? DR QSE submits ALR for qualification ERCOT qualifies or disqualifies the ALR based on whether the ESIIDs are on a residential profile

How to qualify LMP-$G eligible ALRs? Option 2) Assume residential customers are mostly hedged and accept inaccuracies for ones that aren’t Pros Simplest implementation Low barrier to entry for DR QSE Low risk for DR QSE Level of inaccuracy (double-payment risk) possibly insignificant Cons Inaccurate settlement for REPs Double payment risk Hedging risk for REPs

How to qualify LMP-$G eligible ALRs? Option 3) DR Provider of Record How would it work? DR QSE submits enrollment request for ALR using TXSET or similar formalized electronic transaction ERCOT maintains a DR Provider of Record for every ESIID Customer’s REP could also be his DRPOR Transactions update with REP switches, movement to a DR rate, or enrollment with different DRPOR Customer rates would become part of switch transactions to determine if ESIID is LMP-$G eligible Initial customer rate population required ERCOT disqualifies ALR sites if the ESIIDs are not affiliated with the submitting DRPOR

How to qualify LMP-$G eligible ALRs? Option 3) DR Provider of Record Pros Precisely identifies customers that would receive DR double payment Most accurate settlement for REP Cons Highly complex implementation (TXSET or similar) If TX SET, system expands to include new type of Market Participant PUCT rules required Potential to block customers from retail switching to certain rates and inhibits REP product innovation DR QSE wears risk of unknown ALR composition Does not accommodate evolving rate structures of the retail market