Developing and Complying with LDAR Programs Robert vandenMeiracker.

Slides:



Advertisements
Similar presentations
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
Advertisements

METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Equipment Leak Requirements.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Hazmat Industry Technician. Types of Equipment Monitoring equipment Detection devices Air sampling systems.
Methane Losses from Compressors Lessons Learned from Natural Gas STAR Technology Transfer Workshop Northern Natural Gas Company, INGAA, CECO, Heath Consultants,
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Colorado Reg Revisions
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Air Monitoring Presented By: Etech Environmental & Safety Solutions, Inc.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
Efficient Pigging of Gathering Lines
REINFORCED PLASTICS AND BOAT MANUFACTURING MACT STANDARDS DEVELOPMENT For the Composites Fabricators Association Annual Meeting October 23, 1998 Madeleine.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
VOC Emissions Control from Industrial and Commercial Sources Dr. Miriam Lev-On The LEVON Group, LLC SP7: Current Control Strategies for Industrial Emissions.
Directed Inspection and Maintenance (DI&M) Lessons Learned from Natural Gas STAR Partners Producers Technology Transfer Workshop Devon Energy and EPA’s.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
Introduction to Equipment
Infrared Camera Use for VOC Inspections.
Process Safety Management
Directed Inspection & Maintenance At Compressor and Gate Stations
Miscellaneous Organic NESHAP Compliance for a New Countermeasure Flare Production Facility at the Milan Army Ammunition Plant FRANKLIN engineering group,
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
File Name – Date - Owner of File Welcome! TANK BLANKETING Its Theory and Purpose, The Process and Its Setup.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Air Quality 101 Kansas Air Quality Program overview.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Delivering sustainable solutions in a more competitive world Benzene Waste Operations 40 CFR Part 61, Subpart FF SOCMI Wastewater 40 CFR Part 60, Subpart.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Standards Certification Education & Training Publishing Conferences & Exhibits Camouflage Compliance Buzz Harris, Chris Lehmann, and David Heller Sage.
Industrial Sources of Mercury in the Atmosphere Jim Orgeron Staff Environmental Scientist, Environmental Planning Division.
WasteSection 1 Classroom Catalyst. WasteSection 1 Objectives Name one characteristic that makes a material biodegradable. Identify two types of solid.
© 2012 Delmar, Cengage Learning Chapter 12 Administrative Controls.
Application – Identifying, Listing Equipment, and Documentation
Clean Air Act National Enforcement Initiatives Beverly A. Spagg May 22, 2012.
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
Importance of Maintenance HPDC Foundry
Compliance Assurance Monitoring (CAM) November 24, 2009.
1 Region 5 Enforcement Approach George Czerniak June 13, 2007 NACAA Enforcement and Compliance Workshop.
DRAFT: 9/10/98 REINFORCED PLASTICS MACT STANDARDS DEVELOPMENT FOR EXISTING OPEN MOLDING SOURCES Briefing Package for Outreach Meeting with Small Businesses.
Best Operating Practices for Reducing Emissions F rom Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and.
WasteSection 1 The Generation of Waste Solid waste is any discarded solid material, such as garbage, refuse, or sludges. Solid waste includes everything.
I. Solid WasteSolid Waste Chapter 19 Section 1. Classroom Catalyst.
Awareness Training: ‘HARPC’ for Food Safety Complimentary Presentation by Quality Systems Enhancement 1790 Wood Stock Road Roswell GA E. mail:
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
EPA Methane Regulations Details on the Final Rules and Summary of Impacts May 16, 2016 Producer: Claire Carter Edited by: Afzal Bari Director: Afzal Bari.
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
E VERY L IFE H AS A P URPOSE… Instrument Selection.
Lecture (11): Waste Recycling
Chapter 12 Administrative Controls
Van Wert, OH Water and Wastewater Element Training
Chapter 12 Administrative Controls
Kansas Air Quality Seminar March 5, 2008
RCRA Updates Larry L. Lamberth Enforcement and Compliance Branch
Fugitive Monitoring and Available Programs
Presentation transcript:

Developing and Complying with LDAR Programs Robert vandenMeiracker

2 C R E A T I N G B A L A N C E SM What is LDAR (elledar)?  A) Elf-like humanoids  B) Lightning Detection and Ranging  C) Enemy of Superman  D) Lineal Daughters of the American Revolution  E) Leak Detection and Repair

3 C R E A T I N G B A L A N C E SM What is LDAR?  Regulatory Basis: –New Source Performance Standards (NSPS) VOC’s –National Emission Standards for Hazardous Air Pollutants (NESHAP) Organic HAP’s –Resource Conservation and Recovery Act (RCRA) Hazardous Waste –State Rules

4 C R E A T I N G B A L A N C E SM LDAR Applicability  Industry Subject to LDAR –Chemicals, Polymers, & Resins –Pharmaceutical –Pesticide –Pulp and Paper –Hazardous Waste Storage  Equipment in VOC / HAP / Haz. Waste Service pumpcompressor valveconnector agitatorpressure relief device instrumentation systemsampling connection system

5 C R E A T I N G B A L A N C E SM USEPA Enforcement Priorities (Beverly Bannister, Air, Pesticides and Toxics Management Division EPA, Region 4 presentation at the Carolinas Air Pollution Control Association 2008 Spring Conference)  USEPA FY08 Air Toxics National Sectors –Leak Detection and Repair –Flaring –Surface Coating  Air Toxics Region 4 Sectors –Ongoing –Secondary Aluminum MACT –Pesticides Active Ingredient MACT –Pharmaceutical Production MACT –Phosphoric Acid Mfg/Phosphate Fertilizer MACT –Leak Detection and Repair MACT Sectors

6 C R E A T I N G B A L A N C E SM

7 C R E A T I N G B A L A N C E SM 5 “Easy” Steps to a Successful Program  Identify Equipment  Monitor Equipment  Fix Equipment (if it is leaking)  Keep Records Documenting Everything  Repeat

8 C R E A T I N G B A L A N C E SM Identify Equipment  Read the Applicable Rule(s) –2 to 4 Applicable Rules Not Uncommon –Requirements for Each Rule are Different –Not All Equipment is Subject Part of the Production Unit Threshold Amount of Material  Study Process and Instrumentation Diagrams  Field Verification

9 C R E A T I N G B A L A N C E SM How Many Monitoring Points?  Pulp and Paper Mill: 600  Chemical Plant: 50,000  Polymer Production: 500  17 Refineries (Valves only) –Minimum # 2,229 –Maximum #42,505 –Average10,042  Source: US EPA Enforcement Alert, October 1999

10 C R E A T I N G B A L A N C E SM Example Diagram

11 C R E A T I N G B A L A N C E SM

12 C R E A T I N G B A L A N C E SM Example Picture

13 C R E A T I N G B A L A N C E SM Identify Equipment  Tags –Metal, Plastic, Label, RF Devices, etc.  Diagrams  Pictures  Tables  Post-It ® Notes not Recommended

14 C R E A T I N G B A L A N C E SM Monitoring Frequency  Weekly –RCRA & Generic MACT Pumps  Monthly –Most Sources  Quarterly –Allowances for Documented Non-Leaking Equipment  Annually –Pulp and Paper Equipment  Non-Routine –After Process Safety Device Release  Minimum Number of days between Inspections

15 C R E A T I N G B A L A N C E SM Monitoring Types  Sensory –Visual, Olfactory and Auditory –“Non-Volatile” Materials / Oils / Low Vapor Pressure  Equipment (40 CFR 60, Method 21) –Photo-Ionization Detector (PID) –Flame Ionization Detector (FID) –Does not detect specific compounds –Does not give actual Concentration

16 C R E A T I N G B A L A N C E SM Monitoring Equipment  Specifications –Response Factor < 10 (sample conc. / reading) –Response Time < 30 seconds –Flow Rate (0.1 to 3.0 l/min) –Accuracy / Precision  Safety –Electrically Classified Area? –Intrinsically Safe Equipment  Other Considerations –Weight, Size, Portability, & Durability

17 C R E A T I N G B A L A N C E SM Monitoring Equipment Picture

18 C R E A T I N G B A L A N C E SM Calibration Requirements  Initial Response Factor Test –Verify Instrument Responds to the Material(s) to be Detected –Can Use Manufacturer Data for Common Compounds  Quarterly Precision –Zero Air and Standard Gas –Standard is Usually Methane –Can be Frustrating, Error < 10% of Calibration Gas  Daily Calibration (when in use)

19 C R E A T I N G B A L A N C E SM What is a Leak?  Sensory Observation  Instrument Reading –Varies by Rule and Equipment –MON Agitators > 10,000 ppmv –Amino/Phenolic Resin Connectors > 500 ppmv –Pharmaceutical Pumps > 2,000 pppmv –Pulp and Paper Closed Vent Components > 500 ppmv

20 C R E A T I N G B A L A N C E SM What if a Leak is Detected?  Tag it in an Obvious Manner  Initial Attempt at Repair Within 5 days –Usually Done with Simple Tools  Final Repair Within 15 days –May Require Replacing Seals –Replace Equipment  Exemptions Allowed in Certain Instances  Keep Records –1 st Attempt / Successful Repair / Document Repaired –Equipment not Repaired within 5/15 day timeframe –Develop a Quality Improvement Program (QIP)

21 C R E A T I N G B A L A N C E SM Recordkeeping  Records: –Equipment List (including exemptions)  Depends on Facility –Potentially 1,000’s of points to monitor and keep records –Small: Tables, Forms, etc. –Medium to Large: Integrate LDAR Monitor with off-the-shelf Computer Software

22 C R E A T I N G B A L A N C E SM Exemptions  Difficult / Unsafe to Monitor –Develop Schedule  Vacuum Service –Usually Based on level of vacuum (i.e., <-5 kPa)  Equipment in Service < 300 hr/hr generally exempt  Equipment Designed not to Leak –Welded Connections

23 C R E A T I N G B A L A N C E SM Difficult / Unsafe to Monitor

24 C R E A T I N G B A L A N C E SM Who?  Identification –Collaboration –Environmental / Production/ Engineering / Maintenance  Monitoring –Environmental / Production / Maintenance –Contract Service  Recordkeeping & Reporting –Environmental

25 C R E A T I N G B A L A N C E SM Monitoring Equipment  Usually must be Purchased ($8,000+)  Calibration / Precision Testing Gases –Watch Expiration Dates  Batteries  FID’s Use Hydrogen  Periodic Maintenance  Can be Rented  Other Uses

26 C R E A T I N G B A L A N C E SM Title V Deviations  If equipment is repaired within the appropriate timeframe: Usually not a Deviation  Deviations –Equipment is not Inspected as Required –Equipment is not Repaired within Required Timeframes –Records are not Maintained

27 C R E A T I N G B A L A N C E SM Benefits of LDAR  Credit for Emissions Reductions –Lower Fees –Minor Source –Exemption from Modeling –PSD Netting –Reduction in SARA Emission Estimates  Safety  Monitoring Equipment may have other Uses –Confined Space Entry Monitoring –Non-Regulatory Monitoring

28 C R E A T I N G B A L A N C E SM Challenges to Effective LDAR Compliance  Rules are Complex  Magnitude of Source to Manage is Typically Huge  The numbers involved make it difficult to be perfect always, everytime.

29 C R E A T I N G B A L A N C E SM Complexity  Varying Monitoring Schedules –Different schedules for different types of equipment Pumps, Weekly Visual, Monthly M-21 PRD – GV, M21 within 5 days of Activation Connectors, HL, M-21 after leak repairs –Different schedules for different regulations Valves, GV, LL –Monthly or via Skip Frequency (VV, RCRA, & V) –Quarterly or via Skip Frequency (HON)

30 C R E A T I N G B A L A N C E SM Complexity  Determining individual leak points –Water Lines Steam Lines –Compressed Air Lines –Nitrogen / Inert Gas Lines –Heat Transfer Fluid Lines –Process Lines without Affected Chemicals –Process Lines with Affected Chemicals at Less than Threshold Values –Process lines with affected chemicals –Gas / Vapor –Light Liquid –Heavy Liquid

31 C R E A T I N G B A L A N C E SM Administrative Burden  Compliance Must be Proven –Current LDAR requires Detailed Documentation. –Records are Required for Each Point –Tags for Each Point –Tags for Leakers –Maintenance Records for Each Repair & Repair Attempt –Records for Delays

32 C R E A T I N G B A L A N C E SM Magnitude  Challenges –Easy to miss one or two out of hundreds during set-up or during monitoring –Many tags to maintain –Many records to maintain –Potential for confusion –With hundreds of non-leaking sources, easy for technicians to become complacent –Costly

33 C R E A T I N G B A L A N C E SM Requirements for a Good Program  Set-Up –Accurate Drawings –Detailed Knowledge of Process Conditions Composition, Vapor Pressure, Pressure or Vacuum Service? –Assignment of Organized, Detailed Oriented Personnel

34 C R E A T I N G B A L A N C E SM Requirements for a Good Program  Set-Up –Commitment of Resources May all be Internally Supplied May be Lead and Implemented by Contractor HOWEVER, Must Include Process Knowledge which is Available for Effective Use During Development & Implementation

35 C R E A T I N G B A L A N C E SM Requirements for a Good Program  Good Software Aids in Unraveling Complexity Issues –Can Address Leak Rate Definitions –Can Document Which Programs Apply –Can Aid in Scheduling and Ensuring Monitoring is Done on Schedule –Can Aid in Ensuring Repairs Made Within Deadlines But Software is a Tool and Cannot Eliminate the Basic Challenge that the Rules are Complex.

36 C R E A T I N G B A L A N C E SM Requirements for a Good Program  Running the Program –Management Commitment to Compliance with Monitoring & Repair Deadlines is Vital –Communication between Monitoring Team, Operations, and Maintenance

37 C R E A T I N G B A L A N C E SM Alternatives  "Smart" LDAR  Audible – Visual - Olfactory –Mandated –As an Alternative

38 C R E A T I N G B A L A N C E SM Summary  LDAR programs are difficult to fully implement because… –The rules are complex, and –The piping systems they are intended to regulated consist of literally thousands of components.