Oy Metsä-Botnia Orion Pulp Mill Project - Uruguay Presented by J. Daniel Taillant Center for Human Rights and Environment (CEDHA)

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

GHULAM DASTGIR KHAN LAND ACQUISITION AND SOCIAL IMPACTS ANALYST NATIONAL AND REGIONAL RESOURCE CORRIDORS PROGRAM SECRETARIAT MINISTRY OF MINES GHULAM DASTGIR.
Introduction to the Country Assistance Strategy (CAS)
Environmental Project Commitments The Alberta Experience
АО «НАЦИОНАЛЬНОЕ АГЕНТСТВО ПО ЭКСПОРТУ И ИНВЕСТИЦИЯМ «KAZNEX INVEST» Министерство индустрии и новых технологий Республики Казахстан АО «НАЦИОНАЛЬНОЕ АГЕНТСТВО.
The Environmental Damage Regulations and the Role of Insurance.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Political and Community Value of IFI Compliance Mechanisms: CAO and Uruguay Pulp Mills Presented by David Barnden Center for Human Rights.
Deloitte UK screen 4:3 (19.05 cm x cm) © 2013 Deloitte LLP. All rights reserved. April 2013 Parameters of Competition for a Turkish International.
Role of and Duties of Plan Commission Members Ralph E. Booker.
OFFICE OF INSURANCE REGULATION CURRENT STATE OF DISCOUNT MEDICAL PLAN ORGANIZATIONS (DMPOs) IN FLORIDA FLORIDA OFFICE OF INSURANCE REGULATION.
CSR at Scotiabank Kim Brand Santiago, Chile December 9, 2008.
ARTSA Improving Heavy Vehicle Safety Summit Chain of Responsibility and its potential to improve safety Marcus Burke National Transport Commission 16 April.
Purpose of the Standards
Human Rights Advocacy “Never doubt that a small group of thoughtful, committed citizens can change the world; indeed, it’s the only thing that ever has.”
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Non-governmental Actors in the Compliance with and Monitoring of Multilateral Environmental Decisions.
What Will My Records Retention Schedule Look Like ?
Relationship Contracting: The Main Roads’ Perspective Alan McLennan.
HISTORY, ROLE AND RESPONSIBILITIES THE LONG-TERM CARE OMBUDSMAN PROGRAM:
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
Mid-Shore CEDS Committee Meeting January 6, 2010.
Complaint on behalf of citizens affected by proposed paper mills in Fray Bentos, Uruguay CEDHA Centre for Human Rights and Environment, Argentina & Servicio.
“Export Credit Agencies and Human Rights”
9 Closing the Project Teaching Strategies
URUGUAY. Presentation Schedule Country Profile Uruguayan Free Trade Zones Tax and Corporate Regimes.
Export University in association with InfoAmericas Exporting 201 – Focus on Latin America Presented by: José I. Rojas May 25, 2007 Intellectual Property.
Report back on AUSTRALIAN FACT FINDING MISSION TO TAMAPKAN & DIDIPIO MINES – Philippines Jan 28 to Feb 3, 2015 Part 2 APDP ACTION FOR PEACE AND DEVELOPMENT.
Process and Lessons Learned. All content presented here, as well as supporting documentation may be found in a publicly accessible repository at the following:
Legal instruments for site protection in the EU Boris Barov, BSPB/BirdLife Bulgaria.
1 Building Value in Everything We Do The International Economic Forum of the Americas – June 7, 2011 Kelvin Dushnisky, EVP Corporate & Legal Affairs.
Becky Hovarter MS APHN RNBC Health Director/Officer Shawano-Menominee Counties Health Department October 2012.
Open Data from Reliable Records Anne Thurston. The Open Data movement, a key aspect of Open Government, is now a top development interest across the world.
Compliance and Enforcement Priorities and Successes in Indonesia 2008 AECEN Regional Forum November 25, 2008 Bali, Indonesia Rosa Vivien Ratnawati MINISTRY.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
ICANN COMMUNITY STRATEGIC PLANNING DISCUSSION Brussels, June
Social and Environmental Safeguards in International Development Finance Case Study PULP Mills in Fray Bentos - Uruguay Presented by Center for Human Rights.
Date: April 14, 2011 Topic: Policy Making for Health Care and the Environment. Aim: How does the government form opinions on health care and the environment?
Oy Metsä-Botnia Orion Pulp Mill Project - Uruguay Presented by J. Daniel Taillant Center for Human Rights and Environment (CEDHA)
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
1 Information Sharing Environment (ISE) Privacy Guidelines Jane Horvath Chief Privacy and Civil Liberties Officer.
Budget Neutrality Appeal Related to the Wage Index Rural Floor Presented By T.Giovanis & Company: Ted Giovanis Vinson & Elkins: Chris Keough March 2007.
Community Engagement In Building The Legal Framework For The Extractive Sector. Are we there yet?? David Barissa ActionAid International.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
1 Overview on Present Database System of EIA for Sustainable Development of Nepal - Dipak Adhikari - Media Forum for Research and - Development (MFRD),
HRs - Env - Access to Justice International Corporate Accountability Paper Pulp Mills Fray Bentos - Uruguay Experimental Corporate Accountability Advocacy.
Comenius Project Lahr Second Year Meeting.
© 2013 Braumiller Schulz LLP Any copying or distribution is prohibited. Adrienne Braumiller, Partner Michelle Schulz, Partner
GLOBAL SERVICE/ INDUSTRY AUDIT / TAX / ADVISORY / LINE OF BUSINESS Current Topics in Global Trade Management John Patrick O’Shea Senior Manager Trade and.
1 Compliance Advisor/Ombudsman (CAO), for IFC & MIGA, World Bank Group Workshop Marrakech, Morocco, July 2009.
How unmanaged E&S impacts can generate business risk
Engagement and Access to Justice In International Development Finance Case Study PULP Mills in Fray Bentos - Uruguay August 3, 2007 – UNEP/University of.
“Broad Community Support”- IFC’s Current Practice October 9, 2008.
Varteg Hill – Coal Recovery and Land Reclamation Pre-Application enquiry by Glamorgan Power Ltd. Members Seminar 31/3/14.
MLPA Closures 2. “Children’s Pool Beach is not the only beach located in La Jolla. There are several beaches located adjacent to or in close proximity.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
MODULE 7: CONDUCT OF GOVERNANCE AUDIT GOVERNANCE AUDITOR ACCREDITATION COURSE.
New York City PMI Chapter Professor Martin Flank MBA, PMP April 20, 2016 Managing Global Projects.
Fall  Alternative Enforcement : The City of Mankato has established an Administrative Enforcement and Hearing Program as an enforcement option.
Policy Committee Report Virginia Recycling Association Annual Members Meeting Charlottesville, Virginia November 8, VRA Policy Committee Report1.
Strengthening Erie County’s Ethics Law and Board of Ethics MARK C. POLONCARZ ERIE COUNTY EXECUTIVE.
Ethical Considerations in Economic Development Aaron J. Harkins 17 th Annual DC Indian Law Conference November 10, 2015.
United Nations Environment Programme
Corporate Accountability and Human Rights
GLOBAL DISPUTE ON SUSTAINABLE BUSINESS:
Ефикасно коришћење енергије у металургији-IPPC
Legislative-Citizen Commission on Minnesota Resources July 18, 2018
Relationship between World Bank and Romanian EA requirements
Making Local Government a Participatory Sport
Presentation transcript:

Oy Metsä-Botnia Orion Pulp Mill Project - Uruguay Presented by J. Daniel Taillant Center for Human Rights and Environment (CEDHA)

ArgentinaUruguay Rio Uruguay Botnia Ence

Relocation Drivers for Botnia Higher Growth Rate of Trees (12-15 vs yrs) Higher Growth Rate of Trees (12-15 vs yrs) Pulp Costs 50% Less than Cost in Europe Pulp Costs 50% Less than Cost in Europe Tax Exemption Haven (30 years) Tax Exemption Haven (30 years) Lower wages in Uruguay Lower wages in Uruguay Exhaustion of Natural Resources at Home Exhaustion of Natural Resources at Home Strengthening of European Legislation Strengthening of European Legislation Proximity to Ports (preexisting lands for woodchips) Proximity to Ports (preexisting lands for woodchips) Proximity to International Roads Proximity to International Roads Proximity to Natural Resources Proximity to Natural Resources More Flexible Environmental Controls More Flexible Environmental Controls Expanding Cellulose Industry in the Region Expanding Cellulose Industry in the Region International Development Agency Sponsorship International Development Agency Sponsorship

Argentina Apparition of foreign papermill - & aware of experiences in Misiones (Arg), Chile, Brazil) – all ECF technology), results in Argentina and Uruguay opposition (before ENCE mill – 1996) Apparition of foreign papermill - & aware of experiences in Misiones (Arg), Chile, Brazil) – all ECF technology), results in Argentina and Uruguay opposition (before ENCE mill – 1996) Uruguayan stakeholders seek collaboration with Argentines Uruguayan stakeholders seek collaboration with Argentines Botnia appears and magnifies problem (tripling ENCE production) Botnia appears and magnifies problem (tripling ENCE production) International Protest - April of 2005, 50,000 people to the international bridge International Protest - April of 2005, 50,000 people to the international bridge Assembly meets 2 times weekly to discuss opposition strategy Assembly meets 2 times weekly to discuss opposition strategy Legal Actions considered, fervent protest, and other methods Legal Actions considered, fervent protest, and other methods Assembly links up with CEDHA and files CAO complaint in 9/2005, then others Assembly links up with CEDHA and files CAO complaint in 9/2005, then others Nearly 40,000 people sign complaint (with Power of Attorney) Nearly 40,000 people sign complaint (with Power of Attorney) Assembly Intensifies Opposition to Date Assembly Intensifies Opposition to Date Promises to Oppose Until Botnia Leaves Promises to Oppose Until Botnia Leaves Nascence of Social-Environmental Movement

IFC CLAIMS BROAD COMMUNITY SUPPORT!

Argentina Botnia Strikes Last Minute Secret Deal with Uruguay Botnia Strikes Last Minute Secret Deal with Uruguay No Cumulative Impact Study of Mills only 5km appart No Cumulative Impact Study of Mills only 5km appart No site study showing environment/social adequacy (12/1200pp.) No site study showing environment/social adequacy (12/1200pp.) No evidence showing proper use of BAT No evidence showing proper use of BAT No EIA for Chemical Operations No EIA for Chemical Operations No convincing data on impacts on water, air, land, etc. No convincing data on impacts on water, air, land, etc. No Prior and Informed Consultation or Disclosure No Prior and Informed Consultation or Disclosure Failure to obtain Social License to Operate Failure to obtain Social License to Operate No review of International Law Obligations of Uruguay/Argentina No review of International Law Obligations of Uruguay/Argentina Open Legal Complaints in Uruguayan and Argentine Courts Open Legal Complaints in Uruguayan and Argentine Courts IFC and Botnia Ignore CAO Findings and Recommendations IFC and Botnia Ignore CAO Findings and Recommendations IFC and Botnia Ignore Presidential Accord of April 2006 IFC and Botnia Ignore Presidential Accord of April 2006 Spawns Largest Environmental Social Movement in Global History Spawns Largest Environmental Social Movement in Global History IFC Goes to Board in April of 2005 saying projects are OK! IFC Goes to Board in April of 2005 saying projects are OK! Botnia Accelerates construction due to Local Opposition Botnia Accelerates construction due to Local Opposition IFC Goes Back to do further studies, admitting faults IFC Goes Back to do further studies, admitting faults Botnia’s and IFC’s Trail of Unacceptable Errors

CAO Audit Findings Complaint by 40,000 Stakeholders Complaint by 40,000 Stakeholders –“IFC’s due diligence to satisfy itself that the EAs were complete in all material respects was inadequate and not incompliance with the organization’s Disclosure Policy” (CAO, Feb 22, 2006) –Insufficient evidence that proper consultation has occurred –No cumulative impact study; IFC Fosters Separation of Projects! –Need to generate transboundary trust in Local Communities –Botnia’s beginning construction undermines legitimacy –Special Efforts must be made to legitimize future studies –Must study impacts of eucalyptus tree farming on water –Must examine International Law Obligations; MIGA says not needed! –Establishes legitimacy of (Gualeguaychú Assembly) –IFC Fails to Give Clarity on how it will address Study Flaws –“Further technical information and facts will not be sufficient”

IFC Systematically Tries to Cover Errors IFC Ignores CAO Recommendations and Fails to do consultation before terms of reference for study (violating OP - 12a) IFC Ignores CAO Recommendations and Fails to do consultation before terms of reference for study (violating OP - 12a) IFC Designs 60-day consultation period during holiday season; boycotted by Assembly, Argentina and Uruguay IFC Designs 60-day consultation period during holiday season; boycotted by Assembly, Argentina and Uruguay IFC leaves 1000 residents waiting … IFC leaves 1000 residents waiting … Consultation Concludes Fruitlessly, CAO warns of rushed “fait accompli” attitude Consultation Concludes Fruitlessly, CAO warns of rushed “fait accompli” attitude CAO Publishes Critical Audit of IFC Faults CAO Publishes Critical Audit of IFC Faults Hatfield Report notes missing elements (many in original CAO complaint) Hatfield Report notes missing elements (many in original CAO complaint) Ecometrix Report Published Erroneously and not removed from Website Ecometrix Report Published Erroneously and not removed from Website Conclusions Insult Stakeholders (public will become accustomed to mills) Conclusions Insult Stakeholders (public will become accustomed to mills) Botnia remains silent, but continues construction …

Violent Assembly Members Scare off IFC Consultants in Gualeguaychú 900 Assembly Members wait for IFC Consultation Team Which Never Show up!

Findings by Ecometrix “The change to the landscape is a permanent impact, however the public’s response to these new industrial features is subjective and may potentially change over time as the public becomes accustomed to the new landscape. Case studies have shown that tourism can co- exist with pulp mills”.

Argentina IFC was Negligent and Irresponsible fostering 2 Projects that were not in compliance with its own environmental and social policies IFC was Negligent and Irresponsible fostering 2 Projects that were not in compliance with its own environmental and social policies CAO reports were conclusive indicating the many IFC faults CAO reports were conclusive indicating the many IFC faults IFC and Botnia ignored social tensions and the international conflict that have been mounting for nearly 3 years and continued on schedule IFC and Botnia ignored social tensions and the international conflict that have been mounting for nearly 3 years and continued on schedule IFC misled the Board of Directors as early as April of 2005 regarding supposed “broad public support” for these projects IFC misled the Board of Directors as early as April of 2005 regarding supposed “broad public support” for these projects The proposed investment is the focus of numerous legal claims, including at International Tribunals and filings in local courts in Arg/URU The proposed investment is the focus of numerous legal claims, including at International Tribunals and filings in local courts in Arg/URU The project sponsor and IFC failed to make efforts to help resolve the conflict that they fueled and instead have worsened the situation The project sponsor and IFC failed to make efforts to help resolve the conflict that they fueled and instead have worsened the situation The World Bank must not provoke or worsen the conflict The World Bank must not provoke or worsen the conflict This investment project is the focus of one of the largest recorded local oppositions ever for a Bank sponsored project and is causing dangerous levels of intolerance and hatred between brotherly communities and an open dispute between member government of the World Bank This investment project is the focus of one of the largest recorded local oppositions ever for a Bank sponsored project and is causing dangerous levels of intolerance and hatred between brotherly communities and an open dispute between member government of the World Bank The World Bank must abandon its consideration of loans to Botnia at the present site, and should, if anything, help work with project sponsors to study possible relocations, as the SPANISH ENCE is considering. The World Bank must abandon its consideration of loans to Botnia at the present site, and should, if anything, help work with project sponsors to study possible relocations, as the SPANISH ENCE is considering. Summary and Conclusions

Argentina Specific Instance Oy Metsä-Botnia Orion Pulp Mill Project - Uruguay Contact Information Jorge Daniel Taillant Center for Human Rights and Environment (CEDHA) Tel Oscar Bargas Citizens Assembly of Gualeguaychú - Argentina Liliana Medina Cocaro MOVITDES – Uruguay Moviemiento por la Vida el Trabajo y un Desarrollo Sustentable