Hawthorne Plaza 715 N. 9 th Street Salina, Kansas 67401.

Slides:



Advertisements
Similar presentations
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Civil Engineering & Architecture 2.3 Residential Design.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
SCHEMATIC DESIGN PRESENTATION
DGET 1360 Nielson Homes Shady Meadows Design Competition Finished Sq. Ft. Rambler.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Old Mankato Railroad Station By: Ryan Carlson Adam Otto.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
The Evolution of Exteriors
Old Post Historic District (OPHD) Fort Bragg Cultural Resources Management Program (CRMP)
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
FOR LEASE Lower Level Suites 1200 Hancock Street, Quincy, MA HARTEL COMMERCIAL Strategic Real Estate Services HARTEL COMMERCIAL 230 Jones Road, Unit 6,
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) April 28, 2009 Board of County Commissioners PUBLIC HEARING.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
New Listing - Walnut Farms Perfect for entertaining! This spacious custom built home with 4 bedrooms and 3 full baths on over a half acre wooded and landscaped.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Architectural Features Interior Design II. Quoins Projecting or contrasting brick or stone laid at the corner angle of a building Projecting or contrasting.
Les Condos Crescent – Style Within Reach. The residences at Les Condos Crescent make efficient use of space and boast luxurious finishes. Each condo has.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
BOMES THEATER INFORMATIONAL MEETING Department of Planning & Development City of Providence October 24, 2013.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Fun Facts: James M. Bennett High School
How we got to ‘U’ aka Measure ‘U’pgrade.
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
May 8, 2018 Bond Program.
83 North Lake Avenue Predevelopment Plan Review
Plaza Midwood Space for Lease
2911 AW Grimes Blvd., Pflugerville TX 78660
ISA Prime Developments
DOWNTOWN TAMPA HISTORIC LANDMARK
1 Semester Project Design A Multi Story Office Building
Call Today for More Details – Make an Appointment to See It!
The Asset Management Journey for Building Assets
WAREHOUSE RENTALS OF GEORGIA
House Construction Budget Plan
Recent Bond Accomplishments
254 East Union Street Pre Development Plan Review
With funding from the Appalachian Regional Commission
Stoughton Public Library
FARR’S BUILDING APARTMENTS
River Front Place 283 W. Front Street
Presentation transcript:

Hawthorne Plaza 715 N. 9 th Street Salina, Kansas 67401

Background Information The original Hawthorne School Building was designed by Architect Ben H. Byrnes in the Tudor Revival style. The school structure is distinguished by its reddish face brick, stone trim and castellated roofline. Brick stringcourses and ribbon windows encircle the original building. One-story brick additions were made to the structure in 1916, 1930, 1961 and The expanded classroom and office areas, as well as the multi-purpose room attached to the south and southeast of the original building. A stone Tudor arch that covered the main entrance to the building on the east was in-filled with masonry during this time and the original wood windows were replaced with aluminum windows having dark bronze frames. Detached modular classroom structures were added to the northern portion of the site in 1993 and 1996, but were later removed. The City of Salina designated the original Hawthorne School building as part of a Heritage Conservation District in However, the property is not listed on the State or National Register of Historic Places. The Conservation District designation means the school is one of 215 non-contiguous properties that were identified as having historical and/or architectural significance to the city.

Roof & Remodeling The building features a Butler Building Systems MR-24 Roof System with UL-90 rating (which allows for large insurance discounts) and was installed in June 1995 at a cost of $260,366Butler Building Systems MR-24 Roof System In 2007 remodeling in the newer 1 story portion of the building was done at a cost of over $150,000. This included new high quality carpeting, lighting, 9” of insulation, ceiling tiles, overhead door, interior doors and interior painting In 2007 the west parking lot was also expanded for additional off-street parking at a cost of over $25,000

Front View Historic Portion

Front View Newer Addition

Southeast Entry

South View of New Addition

West View of Historic Portion

North View of Building

West View of Multi-Purpose Room

Hawthorne

East Hallway New Addition

Office in Newer Addition

Executive Office

Private Conference Room

Training Room

Executive Work Stations

Remodeled Office-Classroom

New Mail Center

Built-in Fire Alarm System Can be Linked to Security Alarm System

New Security Alarm System With 5 Key Pads, Motion Sensors, Other Features and Police Monitoring

Original Blueprints Are Available – Code Footprint Has Been Developed – Survey Has Been Completed & Final Development Site Plan Has Been Completed

ADA Approved Restroom

North Hallway in New Addition

Multi-Purpose Room Stage

Small Kitchen Adjoining Multi-Purpose Room

Executive Work Station

Shipping Area in New Addition

Private Office

Art Room in Lower Level of Historic Building

Office in Lower Level of Historic Building

Classroom – Dormitory Area 1 st Floor of Historic Building

Library – Dormitory Area 1 st Floor of Historic Building

Library – Dormitory of 1 st Floor of Historic Building

Built-in Oak Cabinets in Library

Fiber-Optic Line and Rack in 1 st Floor of Historic Building

Classroom on 2 nd Floor of Historic Building

Classroom on 2 nd Floor Of Historic Building

Unique Classroom Closet Doors Each Linked To Operate Together

Private Executive Office on 2 nd Floor of Historic Building

Double Pane – Energy Efficient Windows in Historic Building

Curved Oak Stair Rail in Historic Building

Fire Escape From 2 nd Floor in Historic Building

Tool Room in Lower Level of Historic Building (Note Concrete Construction)

Newer Natural Gas Fired Boiler System Services Both Buildings

Pneumatic Thermostat Controls For Boiler System

Butler Building Systems – MR-24 Roof System Installed on Both Buildings in June 1995 at Cost of $260,366

Aerial View of Buildings and Land (Note Portable Classroom is Gone)

Floor Plans

Salina, Kansas Map Map Quest Map (Please click link then zoom in or out for additional detail or information)Map Quest Map

Mature Trees and Decorative Shrubs

Historic Building Built in 1912 With New Additions Built in 1916, 1930, 1961 and 1993

Zoning – Architect The property is currently zoned as Planned C1 and was previously zoned for Multi Family Residential use Jones & Gillam Architects – Engineers has been retained to assist with the planned development of this property. Charles Renz has been taking the lead in the project. Their offices are located across the street east of the Hawthorne Plaza Building

Pricing – Square Footage – Land The Hawthorne Building contains 40,930 SF of space. The building rests on 2.8 acres of land Priced at $498,000 the building alone is valued at only $12.22 per square foot!!! The 2.8 acres of commercial development land, conveniently located between I-70 Highway and Downtown Salina, is worth at least $182,952 (121,968 SF at $1.50/SF) as well. This wonderful, historic building and land may be purchased at only $498,000.

Contact Dave Rose President United Country - Mid West eServices, Inc. P.O. Box N. 9th Street, Suite 108 Salina, KS Phone: Cell: Fax: Web Site: