SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.

Slides:



Advertisements
Similar presentations
Fired And Unfired Pressure Vessels
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Electric System Reliability in a Post SONGS World.
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
In India 65% of total power is generated by the Thermal Power Stations. Main parts of the plant are 1. CHP.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
THERMAL POWER PLANT.
Solar Energy Florida Electric Cooperatives Association 2014 Finance & Accounting Conference Glenn Spurlock September 17, 2014.
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficiency.
New Generation Strategy
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
SWOT Analysis of Supercritical & Ultra-Supercritical Power Plants Strengths: High Thermal Efficiency Environment Friendly Significant breakthroughs in.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Vapor and Combined Power Cycles
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
“Energy Efficiency Guide for Industry in Asia”
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
EE 369 POWER SYSTEM ANALYSIS
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Electricity from Geothermal. Developing the Geothermal Resource for Power Generation  Geothermal Well Characteristics  Vapor Dominated  Dry Steam 
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Least Cost System Operation: Economic Dispatch 1
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Gas Turbine Power Plant
Solar cooling systems.
Star Symposium 2013 The Changing Reality of Energy Development Jeffery LaFleur, Vice President Generation Assets APCO/KYPCO October 22, 2013.
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
AIM :- TO STUDY ABOUT STEAM POWER PLANT
Michigan Air Quality Division Greenhouse Gas BACT Analysis for Wolverine Power Supply Cooperative Inc. Mary Ann Dolehanty Permit Section Chief Air Quality.
Unit 2 -Gas And Diesel Power Plants
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Welcome PRESENTATION BY ASHISH MISHRA.
Cost Impacts of Cycling Coal-Fired Power Plants
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
THERMAL POWER PLANT.
The Bases of Energy: forms, units and efficiency
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Presentation on Steam Power Plants R.C.Chaturvedi
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficiency.
Prof. D.N. Reddy Director Centre for Energy Technology and Principal University College of Engineering Osmania University Hyderabad – 7. THEME PAPER ON.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Gas Turbine Power Plant
Zsuzsanna Csereklyei & David Stern
CCU Update integrated resource plan May 17, 2016
Thermodynamics Cycles.
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Electric Power Generation: What’s Going On? & What’s New?
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Michigan Air Quality Division
Solar Energy Commercialization
Condenser in Power Plants
Be Frank on Reconciliation or Breakup ……
Presentation transcript:

SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation

Unit design is unchangeable Unit design is determined (fixed) by the owner’s engineer before any major components are ordered and before any construction is commenced. Conditions are influenced by the required size, the expected usage (peaking, intermediate, or base - often called the duty-cycle), and the need to minimize the initial cost of the generating facility. The most critical of these factors, steam pressure, steam temperature, and condenser back-pressure cannot be altered without deep reconstruction of the plant.

Sub-critical steam cycle Modern sub-critical pulverized coal units (>100 MW) were first constructed in the late 1940’s, initially by the larger investor-owned utilities. These subcritical units operated at pressures of 1600 psi to 1800 psi and temperatures of 1000F. Larger, more efficient subcritical pulverized coal units, operating at increased pressures (2450 psi) and temperatures ( F) began to be constructed in the mid-1970’s. These became typical design conditions for smaller investor-owned and cooperative generating facilities. Smaller subcritical units operate at pressures of 1200 to 1600 psi and 950 to 1000F. Older, subcritical units may operate at pressures of 400 to 1000 psi, and 800 to 900F.

Supercritical steam cycle Supercritical operating pressures are greater than 3600 psi. Throttle steam temperatures were initially at 1000F. Supercritical pulverized coal units were first constructed in the mid- 1960’s by the larger investor-owned, and federal government- owned utilities. AEP, Duke, Southern, and TVA are the leading examples. Because of higher initial cost these units tend to be large, generally above 600 MW. These early units were much plagued by scale-up design problems and water chemistry. Further advancement occurred with foreign development beginning in the 1990’s. Newer, more efficient units, such as AEP’s John Turk, operate at higher throttle steam temperatures - approaching 1100F.

Factors affecting unit operating efficiency Best generating unit efficiency obtained when new, at design conditions defined in the specifics of the contract guarantees. Units almost never operate at those conditions. Operation below design, or optimum conditions necessarily introduces thermal inefficiencies, thereby increasing the determination of the unit’s heat rate.

Ambient and maintenance factors affecting efficiency Higher ambient air temperature and humidity negatively impacts a unit equipped with cooling towers; higher surface water temperature negatively impacts the performance of a once-through cooled unit. Mechanical issues related to steam generator or turbine generator operation can further introduce thermal inefficiencies (i.e., turbine steam packing leakage, air heater leakage, furnace slagging, etc.). Components or sub-components of a generating unit will deteriorate with age and small incremental losses of efficiency will occur. (Condenser tube fouling and pluggage, and loss of air heater basket materials through corrosion are some examples.)

Operating factors affecting efficiency Peaking, or intermediate duty operation, by design, are undertaken at substantial penalties to the thermal efficiency of a steam turbine generator. Load (or frequency) regulation, or automatic governor control, is used to match an individual electric company energy supply to their instantaneous customer load; this necessary function requires the assignment of certain portions of a generating units capacity to “reserve requirements” established by the power pools. This decrease in unit load decreases the efficiency of each connected generator to the grid. Small systems, with one or two operating units, experience this impact more fully. Larger systems may reassign reserve requirements and limit the impact to a smaller percentage of their fleet.

New factors affecting operating efficiency Regulated versus unregulated markets may have an effect on dispatch of unit; a base load unit may become a load following unit. Integrating renewable resources into the supply portfolio causes increased cycling duty for existing resources. Required installation of 316(b) cooling towers on units designed for once-through cooling dramatically decreases the overall unit efficiency. Increased auxiliary loads due to the required installation of new tail-pipe control technologies for CATR and EGU MACT will decrease the overall unit efficiency.

Case studies Marion 123 Chamois Fort Dodge San Miguel 1 Genoa 3 Garden City Gas Steam

Take-home message Design efficiencies were fixed in the development phase of the plant, and any improvements are at best marginal and at worst hindered by the specter of NSR review. Regulatory influences either indirectly hinder the maintenance of original design efficiencies (NSR review) or directly require the addition of equipment which penalizes the thermal efficiency of a facility. A output-based GHG standard (lb-CO 2 /MWh) is not a plausible metric for NSPS purposes.