Collection System Regulatory Initiatives in California SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.

Slides:



Advertisements
Similar presentations
Water Quality Partnership Presentation January 20, 2011 By Mark Henley, P.E. WA Dept. of Ecology.
Advertisements

Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
-Proposed Revisions- STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS for SANITARY SEWER SYSTEMS.
Steve White Urban Water Council US Conference of Mayors
CMOM: Where are we since 2005? Ann McCready-Gliha Cuyahoga County Sanitary Engineering SPUG February 16, 2011.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.
CWEA NTC 2008: Statewide SSO General OrderSlide 1 “You, Me and the SSO GWDR” (Order No DWQ) James Fischer, P.E. Water Resource Control Engineer.
Sanitary Sewer Overflow (SSO) Reduction Program: MRP Revisions Division of Water Quality State Water Resources Control Board October 23, 2012.
CMOM and Beyond Overview of the Proposed SSO Rule Presented By: Deborah Chase, CBCP Phone: (425) Ron Brown, PE, PMP Phone:
Presented by: Agustin Socarras, P.E. Chief, W & WW – Conveyance Section Department of Environmental Resources Management DERM July 31, 2002 Pollution Prevention.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Fox Valley OperatorsAssociationCMOM Capacity Management Capacity ManagementOperationMaintenance January 2011 C apacity M anagement O peration & M aintenance.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems BACWA.
Sierra Water Work Group Summit June Upper Mokelumne River Watershed Authority.
Waste Discharge Requirements (WDR) Orange County Sanitation District WDR Awareness Training Revision September 30, 2005.
BACWA Wet Weather Management Workshop Spill Notification Requirements Melissa Thorme Downey Brand LLP Sacramento, CA
CMOM Water Environment Federation Collection Systems Committee –cMOM Subcommittee.
Environmental Management Systems An Overview With Practical Applications.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Housing Element Update March 30, 2009 Community Meeting.
Recent Enforcement Actions Greg Broderick Downey Brand LLP BACWA Wet Weather Management Workshop MAY 28, 2008.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
CASA’s Private Sewer Lateral (PSL) Task Force BACWA Wet Weather Management Workshop May 28, 2008.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Delivering sustainable solutions in a more competitive world 1 © COPYRIGHT 2010 ERM.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
COLLECTION SYSTEMS REGULATORY UPDATE USEPA – SWRCB August 2010.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Connecticut Department of Energy and Environmental Protection.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
NC AWWA-WEA 95th Annual Conference
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
Fats, Oils & Grease (FOG) Control (aka: What is the City doing to us now?) Restaurant Managers’ Forum.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)
February 25, Today’s Agenda  Introductions  USDOE School Improvement Information  Timelines and Feedback on submitted plans  Implementing plans.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
ADOPT UPDATED SEWER SYSTEM MANAGEMENT PLAN (SSMP) Sausalito CC 11FEB14.
I/I Reduction Efforts EBMUD and the Satellite Agencies
“Optimizing Collection System Program Performance
EMWD 2016 Sanitary Sewer Management Plan
SSO WDR Sewer System Management Plan Overview & Resources
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Risk Based Predictive Maintenance Solutions for Cleaning Sewer Mains
Completion Report Summary
Annual Enforcement Report Overview
Presentation transcript:

Collection System Regulatory Initiatives in California SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.

Today’s Presentation  Overview Collection System Regulatory Initiatives EPA’s SSO Reduction Strategy Proposed Federal Legislation Regarding Collection Systems California WDR and SSMPs (Brief Summary) Recent California Regional Board Cease and Desist Orders (CDOs) that Impact Collection Systems 3rd Party Lawsuits Under the Clean Water Act  Collection System Audit and Order Processes  Typical Requirements of EPA Orders

Collection System Regulatory Initiatives in California Trends and Regulatory Initiatives

Federal Regulatory Initiatives: Past Initiatives  Proposed CMOM Regulation Capacity Management Operational Practices Maintenance Practices  NPRM Withdrawn; On-Hold Indefinitely

Federal Regulatory Initiatives: EPA SSO Reduction Strategy  Parallel to CMOM Proposal  April 2000: US EPA Strategy Document  Regions Must Develop Enforcement Plan to Reduce SSOs ID SSO Violators Establish Enforcement Priorities Address 20% of Priority Agencies/yr Full Range of Regulatory Response Options Ensure Action Taken to Correct SSOs  EPA Has Been Active in Region 9 San Diego, LA, Honolulu, SASM/SMCSD, EBMUD, Other Bay Area Agencies

Federal Regulatory Initiatives: Proposed Initiatives  H.R. 753/S Sewage Overflow Community Right-to- Know Act Similar to CIWQS Reporting May Resurrect CMOM Discussions Near-Term Impacts in CA Should be Minimal  Federal H.R Water Quality Investment Act of 2009: $750M for SSO Control Grants

Regulatory Initiatives: Statewide WDR  Timeline: 2006 – Spring 2009 Education/Awareness Mid-2009 – Triennial Review Summer 2009 – Begin Audits Late 2009 – Move Into Enforcement

State of CA Initiatives: State Orders  State-Issued Cease and Desist Orders (CDOs): State Regional Board - Region 2 (Bay Area) San Mateo and Tributary Agencies Others in the Future?  Requirements Very Similar to EPA Orders

Other SSO Reduction Initiatives  Stakeholder Lawsuits City of Stockton - $4M Settlement Recent Inquiries (Environmental Associates):  West Valley San. District  CSD 2-3 of Santa Clara County  Others?

Where Does That Leave Us?

Collection System Regulatory Initiatives in California Typical Collection System Audit and Order Processes

Typical EPA Audit and Order Process – Collection System Audit Phase Kickoff & Information Request Initial Audit* Supplemental Information Request Draft Audit Report** Comments by Agency (Usually Only 30 Days) Final Audit Report *Focus on Facts and Data During Audits, Not “War Stories” **Review Results Very Closely

Draft Proposal to Correct Deficiencies* Negotiations on Programs Administrative Order or Possible Consent Decree Prepare Plans Required by Order / CD Implement Programs Monitor Compliance and Results Typical EPA Audit and Order Process – Collection System Order Phase *Often Issued 4 to 6 Months After Final Audit Report

Collection System Regulatory Initiatives in California Typical Requirements of Orders and Lessons Learned

Typical Order Requirements:  Capacity Assessment & Assurance Flow Monitoring  Complete Monitoring During 1 st Wet Season After Order Model of System - Peak Dry & Wet Weather Flows  Complete Model ~2 Years After Flow Data Collected Wet Weather Mgmt / Inflow & Infiltration Reduction Programs CIP to Address Capacity Deficiencies

Lessons Learned: Capacity Programs Scrutinize Peaking Factors and Assumptions – Don’t Be Too Conservative Consider Different Capacity Upgrade Guidelines for Existing vs. New Sewers Field Verify Capacity Issues Identified by Models Before Finalizing CIP Wet Weather: Invest in a Detailed Study of Convey & Treat vs. I/I Reduction Options

Typical Order Requirements:  Inspection & Condition Assessment Inspect System Within a Defined Period of Time  Process to Identify Deficiencies  CIP - Sewer Rehabilitation & Replacement

Lessons Learned: Inspection and Condition Assessment Programs Don’t Inspect Every Sewer in the System (Unless Needed) Utilize Risk Analysis to Identify Sewers that Should be Inspected Standardize Defect Codes Utilized by Crews and Contractors; Have a QC Process Inefficient to Analyze Text-Based Data and Data on Paper Forms

Lessons Learned: Inspection and Condition Assessment (Continued) Code-Based Data Linked to Specific Assets in an Electronic Format is Easily Analyzed Data Management is Essential – Have a Strategy and a System Develop a Decision Process for Repair, Rehabilitation and Replacement Projects Simplified Decision Processes are Easier, But Results Will Not be Optimal

Typical Order Requirements:  Pump Station Programs Inspection & Rehabilitation Alarms and Alarm Response  Alarms on Every Pump Station  24/7 Response to Alarms Redundant Power Supply  Force Main Programs Inspection and/or Testing

Lessons Learned: Pump Station and Force Main Programs To Support Negotiations, Identify Holding Time Prior to Spill and Location of Overflow for Each Pump Station Consider Generator Connections and Portable Generators When Appropriate For Newer Force Mains, Negotiate a Future Testing or Inspection Date

Typical Order Requirements:  SSO Response, Mitigation and Tracking Parallels SSMP Requirements Some Additions:  Defined Response Time (30 to 60 Minutes from First Notice)  Require Documentation of Specific Procedures  Recent Focus: Notification Process to Notify Downstream Stakeholders List of Who Will be Notified Identify Person Responsible to Give Notice

Lessons Learned: SSO Response and Notification of Stakeholders Focus on Average Response Time During Negotiations, if Possible Utilize Pump Station Holding Time Data to Negotiate Pump Station Response Times Coordinate Notification With OES and/or Health Department Make Sure Your Internal Records Match the CIWQS Database

Typical Order Requirements: O&M and FOG  Preventive Maintenance Clean Entire System  Defined Frequency (2-3 Years) Hot Spots  Issue and Frequency Root Control Program Pump Station Maintenance  Fats, Oils & Grease Management

Lessons Learned: Cleaning and FOG Programs Need Cleaning Data to Negotiate Reasonable Cleaning Frequencies Begin to Collect Cleaning Data re: the Type and Quantity of Debris in Pipes Document Hot Spots and Assign a Frequency and Type of Cleaning Develop a FOG Strategy & Ordinances (Inspect, Clean, Educate, or a Combination)

Typical Order Requirements: Plan Development and Monitoring  Key Issues for Plans: 6 Months to 1 Year to Develop Detailed Schedule for Programs Detailed Procedures  Inspection and Condition Assessment  Cleaning  FOG  Response and Mitigation  Key Issues for Monitoring: Quarterly Reports Annual Progress Report vs. Schedule

“Big Picture” Lessons Learned: With a High Level of SSOs, You’ll Eventually Get Attention from EPA, CA or NGOs Audits Should Not be Taken Lightly – Understand the Process & the Implications Make Sure Audit Findings are Based on Data and Facts, Not “War Stories”

“Big Picture” Lessons Learned: (Continued) If You Receive a Draft Order, Negotiate the Terms Until Reasonable If You Have Data to Support Your Position, EPA can be Reasonable When Negotiating Focus Negotiations on High Cost Programs; Capacity, Inspection/Rehab, and Cleaning

Collection System Regulatory Initiatives in California Questions and Discussion SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.