Report from NSAC Donald Geesaman IUPAP WG-9 Meeting 17 August 2012 8/17/20121.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
Strategy for Nuclear Physics Scope and Range of Physics Current Projects Future Projects Other issues Balance of Programme, Theory.
Report From NSAC 2012 Committee Robert AtcherPeter JacobsJamie Nagle LANLLBNLColorado Jeffrey BinderDavid KaplanKenneth Nash (ACS) ORNLWashingtonWashington.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update June 12,
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Office of Science U.S. Department of Energy 1 Nuclear Physics Program RHIC Users Meeting May 2008 Jehanne Simon-Gillo Acting Associate Director of the.
1 Office of Nuclear Physics RHIC Users Meeting June 4, 2009 Gene Henry Acting Associate Director of Science for Nuclear Physics U.S. Department of Energy.
NSAC Long Range Plan Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory.
Physics Department Meeting June 19, 2008  Safety items: Mike Zarcone  DOE Emergency Management Audit next week  Department news  Budget update  Looking.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
U.S. Department of Energy’s Office of Science Dr. Raymond Orbach February 25, 2003 Briefing for the Basic Energy Sciences Advisory Committee FY04 Budget.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
Electron-Ion Collider and the NSAC Long Range Plan Robert Tribble December 7, 2007 Texas A&M University.
The Long Range Plan for Nuclear Physics The LRP working group “After the big meeting” Richard Seto University of CA, Riverside RHIC-AGS User’s Group –
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Long Range Plan (LRP) & EDM Nuclear Physics LRP is prepared every 5- 6 years Provides guidance to funding agencies w.r.t. scientific and funding priorities.
Report From NSAC 2012 Committee Robert AtcherPeter JacobsJamie Nagle LANLLBNLColorado Jeffrey BinderDavid KaplanKenneth Nash (ACS) ORNLWashingtonWashington.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY Advisory Committee for Cyberinfrastructure 10/31/06 Craig.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Curtis A. Meyer Nuclear Science in the United States The Core of Matter The Fuel of Stars.
1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility CWL SURA.
General Discussion some general remarks some questions.
Director’s Comments on the BNL Strategic Plan RHIC/AGS Users Meeting May 29, 2008 Steve Vigdor, filling in for Sam Aronson.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
May 27-30, 2008 Nuclear Physics at NSF Research and Education –200+ faculty –80+ postdocs –200+ graduate students –150+ undergraduates University facilities.
U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Director, Office of Science April 29, 2004 PRESENTATION FOR THE BIOLOGICAL AND ENVIRONMENTAL.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
June 1-5, 2009 June 8-10, 2009 Nuclear Physics at NSF NP Experiment –Structure –Heavy Ions –Symmetries –Hadrons and QCD NP Theory Particle and Nuclear.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
NSD Update James Symons 9/14/ Inch Cyclotron / Accelerator Based Nuclear Science News Element 114 Confirmation Fixed Vacuum Leak in “D” - July 2009.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
U.S. Department of Energy’s Office of Science Presentation to the Basic Energy Sciences Advisory Committee (BESAC) Dr. Raymond L. Orbach, Director November.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
NSAC Report NuPECC Meeting Uppsala 16 June 2016.
GlueX Collaboration Meeting
Jefferson Lab Overview
The RIA Users Organization (RIAUO)
Future Trends in Nuclear Physics Computing Workshop
Introduction to Jefferson Lab
Some Thoughts On a Possible Future Electron-Ion Collider
SOLID Collaboration Meeting
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
Perspectives from DOE NP
Presentation transcript:

Report from NSAC Donald Geesaman IUPAP WG-9 Meeting 17 August /17/20121

2012 NSAC Committee Robert AtcherPeter JacobsJamie Nagle LANLLBNLColorado Jeffrey BinderDavid KaplanKenneth Nash (ACS) ORNLWashingtonWashington State Jeffery BlackmonJoshua KleinAllena Opper Louisiana StatePennsylvaniaGeorge Washington Gail DodgeKarlheinz LangankeJorge Piekarewicz Old DominionGSIFlorida State Alexandra GadeZheng-tian LuJulia Velkovska Michigan StateANLVanderbilt Susan GardnerRobert McKeownRajagopal Venugopalin KentuckyJefferson LabBNL Donald Geesaman (Chair)Curtis Meyer ANLCarnegie Mellon 8/17/20122

US Outlook Raises the Spector of Considerable Possible Changes 2007 Long Range Plan – Expectation of doubling of science budgets – Construction of JLab 12 GeV Upgrade – Facility for Rare Isotope Beams – Deep Underground Science Laboratory – RHIC Luminosity Upgrade – Future thinking of an electron-ion collider 2009 Influx of one time funding from recovery act (ARRA) 2009 FRIB “Other Project Costs” funding starts 2011 FRIB TEC Project Funding starts FY2012 President’s request contains 15.9% increase – HRIBF closed – Enacted budget had a 3.7% increase FY13 request at FY11 level – possibility of flat budgets for some time to come. 8/17/20123

2012 Program Running programs at RHIC, NSCL, ATLAS, LHC and university facilities. STAR Heavy Flavor Tracker being assembled. CARIBU getting 0.5 Ci source this summer. JLAB 6 GeV running completed. 12 GeV construction ~60% complete FRIB funding in 4th year. Ready for CD-2 Majorana demonstrator in progress and neutron EDM R&D continuing. CUORE equipment funding complete in /17/20124

The 2013 President’s Budget Request brings challenges 8/17/20125

FY12 NP down 3.5% from FY11 and NSCL held flat FY13 expect about flat 8/17/20126

From Dr. Brinkman’s and Dr. Hallman’s slides 8/17/20127

2012 Congressional Budget process House E&W Committee markup added 21 M$ to Presidents request Senate Committee added $13M to President’s request. Likely there will only be a continuing resolution this year, not a budget bill so it is not clear what happens. “Agreement” on a CR til March. Both markup’s contained language about NSAC review to inform priorities for the future. If “Sequestration” (part of debt limit increase legislation) occurs, could be significant further cuts 8/17/20128

9

10

8/17/201211

8/17/201212

Underground Lab – now in the hands of HEP at DOE 8/17/ Long Baseline Neutrino Experiment reconfiguration working group recently favored the option to build a new beamline to Homestake with an initial 10 kton LAr-TPC detector on the surface.

8/17/201214

8/17/201215

8/17/201216

Observations projecting based on previous charges NSAC has repeatedly answered charges like this before including 1985, 1992 and In 2005 we named a facility to close in the event of declining budgets, but the tide of research budgets changed. By there was the expectation of a doubling of R&D budgets. We are not asked to do new Long Range Plan but we need to take into account progress, both in the U.S. and internationally budget followed by flat-flat budgets through 2018 represent an effective $86M/year cut from FY2012 budget (depending on estimates of inflation). 8/17/201217

NSAC Subcommittee Robert Tribble (Chair)Texas A&M Adam BurrowsPrinceton George CrabtreeANL Joseph CarlsonLANL Brad FilipponeCaltech Stuart FreedmanUC-Berkeley Haiyan GaoDuke Donald GeesamanANL Barbara JacekStony Brook Peter JacobsLBNL David KaplanWashington Kirby KemperFlorida State Krishna KumarMassachusetts Naomi MakinsIllinois – UC Curtis MeyerCarnegie-Mellon James NagleColorado Witold NazarewiczTennessee/ORNL Krishna RajagopolM.I.T. Michael Ramsey-MusolfWisconsin Lee SobotkaWashington U. St. Louis Michael WiescherNotre Dame John WilkersonNorth Carolina State 8/17/201218

Plans for the Subcommittee Discussion prior to charge at April APS meeting May15:Organizational meeting in Washington Area Sept 6-9: Meeting to gather input. Presentations summarizing major areas of science and plans for major facilities. Detailed budget scenarios from the agencies. November: Resolution Meeting January 7: Report due to NSAC Late January: NSAC meeting to consider report. Community input: Asked for input through DNP mailing. Most facilities are working through their users groups. Some may self organize town meetings Web Site: 8/17/201219

Summary If we do this well, we can communicate the value of our science and the wisdom in our planning decisions. NSAC is widely viewed as being able to respond coherently to the issues at hand and that thus the agencies pay very close attention to our recommendations. We must respond to the charge. There is currently an element of uncertainty in the future U.S. program which has international ramifications. However, the U.S. will continue to invest heavily in nuclear physics research. There may be new opportunities for collaborations and joint ventures. NP2010, the National Research Council Decadal Report on Nuclear Physics has been released. Also two videos 8/17/201220

National Research Council Decadal Survey of Nuclear Physics NP2010 Chair:Stuart Freedman, Vice Chair:Ani Aprahamian Pre-Publication version released June Recommendations on the next four slides. 8/17/201221

Finding: By capitalizing on strategic investments, including the ongoing upgrade of the continuous electron beam accelerator facility (CEBAF) at the Thomas Jefferson Accelerator Facility and the recently completed upgrade of the relativistic heavy ion collider at Brookhaven National Laboratory (RHIC), as well as other upgrades to the research infrastructure, nuclear physicists will confront new opportunities to make fundamental discoveries and lay the 16 groundwork for new applications. Conclusion: Exploiting strategic investments should be an essential component of the U.S. nuclear science program in the coming decade. After years of development and hard work involving a large segment of the U.S. nuclear physics community and the Department of Energy, a major, world leading new accelerator is being constructed in the United States. Finding: The Facility for Rare Isotope Beams is a major new strategic investment in nuclear science. It will have unique capabilities and offers opportunities to answer fundamental questions about the inner workings of the atomic nucleus, the formation of the elements in our universe, and the evolution of the cosmos. Recommendation: The DOE’s Office of Science in conjunction with the State of Michigan and Michigan State University, should work toward the timely completion of the Facility for Rare Isotope Beams and the initiation of its physics program. 8/17/201222

Recommendation: The Department of Energy, the National Science Foundation, and, where appropriate, other funding agencies should develop and implement a targeted program of underground science, including important experiments on whether neutrinos differ from antineutrinos, on the nature of dark matter, and on nuclear reactions of astrophysical importance. Such a program would be substantially enabled by the realization of a deep underground laboratory in the United States. Finding: The dual role of universities—education and research—is important in all aspects of nuclear physics, including the operation of small, medium, and large facilities, as well as the design and execution of large experiments at the national research laboratories. The vitality and sustainability of the U.S. nuclear physics program depend in an essential way on the intellectual environment and the workforce provided symbiotically by universities and the national laboratories. The fraction of the nuclear science budget reserved for facilities operations cannot continue to grow at the expense of the resources available to support research without serious damage to the overall nuclear science program. Conclusion: In order to ensure the long-term health of the field, it is critical to establish and maintain a balance between funding of operations at major facilities and the needs of university-based programs. 8/17/201223

Recommendation: The Department of Energy and the National Science Foundation should create and fund two national competitions: one a fellowship program for graduate students that will help recruit the best among the next generation into nuclear science and the other a fellowship program for postdoctoral researchers to provide the best young nuclear scientists with support, independence, and visibility. Recommendation: A plan should be developed within the theoretical community and enabled by the appropriate sponsors that permits forefront computing resources to be deployed by nuclear science researchers and establishes the infrastructure and collaborations needed to take advantage of exascale capabilities as they become available. Finding: The range of projects in nuclear physics is broad, and sophisticated new tools and protocols have been developed for successful management of the largest of them. At the smaller end of the scale, nimbleness is essential if the United States is to remain competitive and innovative in a rapidly expanding international nuclear physics area. Recommendation: The sponsoring agencies should develop streamlined and flexible procedures that are tailored for initiating and managing smaller-scale nuclear science projects. 8/17/201224

Finding: An upgrade to an existing accelerator facility that enables the colliding of nuclei and electrons at forefront energies would be unique for studying new aspects of quantum chromodynamics. In particular, such an upgrade would yield new information on the role of gluons in protons and nuclei. An electron-ion collider is currently under scrutiny as a possible future facility. Recommendation: Investment in accelerator and detector research and development for an electron-ion collider should continue. The science opportunities and the requirements for such a facility should be carefully evaluated in the next Nuclear Science Long-Range Plan. 8/17/201225

The 2007 Long Range Plan 8/17/201226

Recommendation I We recommend completion of the 12 GeV CEBAF Upgrade at Jefferson Lab. The Upgrade will enable new insights into the structure of the nucleon, the transition between the hadronic and quark/gluon descriptions of nuclei, and the nature of confinement. Recommendation II We recommend construction of the Facility for Rare Isotope Beams (FRIB), a world-leading facility for the study of nuclear structure, reactions, and astrophysics. Experiments with the new isotopes produced at FRIB will lead to a comprehensive description of nuclei, elucidate the origin of the elements in the cosmos, provide an understanding of matter in the crust of neutron stars, and establish the scientific foundation for innovative applications of nuclear science to society. Recommendations of the 2007 NSAC Long Range Plan 8/17/201227

Recommendation III We recommend a targeted program of experiments to investigate neutrino properties and fundamental symmetries. These experiments aim to discover the nature of the neutrino, yet-unseen violations of time-reversal symmetry, and other key ingredients of the New Standard Model of fundamental interactions. Construction of a Deep Underground Science and Engineering Laboratory is vital to U.S. leadership in core aspects of this initiative. Recommendation IV The experiments at the Relativistic Heavy Ion Collider have discovered a new state of matter at extreme temperature and density—a quark-gluon plasma that exhibits unexpected, almost perfect liquid dynamical behavior. We recommend implementation of the RHIC II luminosity upgrade, together with detector improvements, to determine the properties of this new state of matter. Recommendations for the further future Initiatives 8/17/201228